← Back
Walk-up apt, over six families with stores
1011 FULTON STREET
BROOKLYN · BIN 3057236
💬 Discuss this project
1930Year Built
4Stories
C7Building Class
R7AZoning
4,743 sfGross Floor Area
10Units
Rent Stabilized38 Open Violations 35 unresolved · 3 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 1011 FULTON STREET INC. · 1,062 sf lot · 4.47 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingCivil
Permit Issued — active, not yet Signed-off
Bulkhead1p · 1 filing · 9 docs
Floor 1Under Construction4p · 1 filing · 8 docs
Cellar1p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1011 FULTON STREET2707/08/2026
MNK ENTERPRISES NY607/08/2026
OWNER OF PREMISES 10 PUTN103/22/2026
THE OWNER OF103/22/2026
FULTON GRAND BAR INC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S Y CONSULTING VIOLATIONS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VALUE CONSTRUCTION BX, INGeneral Contractor303/21/2026
MNK ENTERPRISES NY INCGeneral Contractor303/21/2026
ZONE PLUMBING & HEATING CPlumbing307/08/2026
5 BOROS PLUMBINGGeneral Contractor203/22/2026
NEU, RICHARDElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
SERGIO GIANNACHIElectrical103/21/2026
ABDUL AZIZElectrical103/21/2026
BUILDINNYC LLCGeneral Contractor109/22/2026
PARK CONTRACTING GROUPGeneral Contractor107/08/2026
TMS PLBG & HEATING CORPPlumbing109/23/2026
TWITTY, RONALDElectrical103/21/2026
GLAZIER LOCAL 1281Electrical103/21/2026
LELIS, ARILSONElectrical103/21/2026
MANLEY, JAMESElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MCHENERY TESTING LAB9181111/06/2024
SUPERIOR - HOME INSPECTIO1804511/06/2024
Building Lifecycle
All (105)Filed (9)Permit Issued (7)Signed Off (2)Violation (60)Inspection (6)Objection (2)Special Inspection (19)
09/22/2026
Permit issued — Plumbing
B01437070-S1-PL
09/21/2026
Permit issued — General Construction
B01437070-I1-GC
08/09/2026
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION AT EXISTING STREET LEVEL COMMERCIAL SPACE. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
B01437070-I1
08/09/2026
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION AT EXISTING STREET LEVEL COMMERCIAL SPACE. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
B01437070-S1
08/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
Vitaly Ganopolsky
07/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/27/2026
Special inspection requirement — Final
DMYTRO CHORNOBRYVETS
05/04/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
07/16/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01045820-I1
07/16/2025
Permit issued — Sidewalk Shed
B01045820-I1-SH
06/09/2025
Violation issued (HPD, open)
A
04/22/2025
Signed off — Alteration
B01048692-I1
04/04/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/25/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/14/2025
Permit issued — General Construction
B01048692-I1-GC-CX
12/02/2024
Special inspection requirement — Air barrier - visual inspection
Steven Williams
12/02/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Steven Williams
12/02/2024
Special inspection requirement — Fenestration air leakage
Steven Williams
12/02/2024
Special inspection requirement — Fenestration areas
Steven Williams
11/29/2024
Violation issued (HPD, closed)
I
11/06/2024
Filed — Alteration
B01048692-I1
11/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Steven Williams
11/01/2024
Special inspection requirement — Wood – Seismic Resistance
Steven Williams
07/01/2024
Permit issued — Sidewalk Shed
B01045820-I1-SH
05/14/2024
Special inspection requirement — Tenant Protection Plan Compliance
TREVOR O. FLOWERS
05/09/2024
Special inspection requirement — Final
TREVOR O. FLOWERS
05/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Williams
05/07/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01045820-I1
05/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2024
Violation issued (ECB, closed)
Construction
04/24/2024
Violation issued (ECB, open)
Construction
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2022
Violation issued (HPD, closed)
I
09/13/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/13/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/09/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/15/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/19/2022
Permit issued — Plumbing
B00436739-I1-PL
07/19/2022
Permit issued — Boiler Equipment
B00436672-I1-BE
06/13/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Williams
06/10/2022
Filed — Alteration
REPLACE BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS, BULK, OR OCCUPANCY. NO EXISTING BUILDING MATERIALS TO BE DISTURBED UNDER THIS APPLICATION.
B00436672-P1
06/10/2022
Filed — Alteration
INSTALL NEW GAS PIPING FOR BOILER REPLACEMENT. REPLACE GAS PIPING ON TWO (2) EXISTING HOT WATER HEATERS. NO CHANGE IN USE, EGRESS, BULK, OR OCCUPANCY. NO EXISTING BUILDING MATERIALS TO BE DISTURBED UNDER THIS APPLICATION.
B00436739-P1
06/10/2022
Special inspection requirement — Heating Systems
Steven Williams
06/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Williams
06/10/2022
Special inspection requirement — Heating Systems
Steven Williams
06/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Williams
06/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Williams
03/01/2022
Filed — Alteration
REPLACE BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS, BULK, OR OCCUPANCY. NO EXISTING BUILDING MATERIALS TO BE DISTURBED UNDER THIS APPLICATION.
B00436672-I1
03/01/2022
Filed — Alteration
INSTALL NEW GAS PIPING FOR BOILER REPLACEMENT. REPLACE GAS PIPING ON TWO (2) EXISTING HOT WATER HEATERS. NO CHANGE IN USE, EGRESS, BULK, OR OCCUPANCY. NO EXISTING BUILDING MATERIALS TO BE DISTURBED UNDER THIS APPLICATION.
B00436739-I1
02/24/2022
Violation issued (HPD, closed)
A
06/30/2021
Objection raised — Other
06/30/2021
Objection resolved — Addressed
06/24/2021
Filed — Alteration
AT EXPOSURES 1, 2, & 3 (FRONT, SIDE, & REAR), DISMANTLE STAND ALONE WOOD FRAME OUTDOOR DINING AREA. REMOVE WOOD FRAME IN ITS ENTIRETY ALONG WITH POSTS, RAFTERS, AND PLASTIC CORRUGATED ROOF SHEETING. NO EXISTING BUILDING MATERIALS TO BE DISTURBED.
B00531350-I1
05/29/2021
Special inspection requirement — Final
Steven Williams
04/09/2021
Violation issued (HPD, closed)
A
02/25/2021
Violation issued (ECB, closed)
Construction
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedTMS PLBG & HEATING CORP09/22/2026
DOB NOWGeneral ConstructionPermit IssuedBUILDINNYC LLC09/21/2026
DOB NOWSidewalk ShedSigned-offPARK CONTRACTING GROUP07/16/2025
DOB NOWGeneral ConstructionSigned-offVALUE CONSTRUCTION BX, IN01/14/2025
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES NY INC07/01/2024
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C07/19/2022
DOB NOWBoiler EquipmentSigned-offZONE PLUMBING & HEATING C07/19/2022
BISPLISSUEDNCA PLUMBING&HEATING LLC03/14/2012
BISOTISSUEDABSTRACT CONST.& DECOR CO02/13/2012
BISPLISSUEDL&J PLG & HTG CO OF NY IN05/11/2010
BISOTISSUEDABSTRACT CONST.& DECOR CO03/23/2010
2 projects · most recent 08/09/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/09/2026Permit IssuedTMS & SON PLUMBING LLCWater/Sanitary
06/10/2022Signed-off5 BORO'S PLUMBING INCGas
2 projects · most recent 09/10/2026
General Wiring
FiledStatusContractorScope
09/10/2026Permit IssuedLENS ELECTRIC, INCGeneral Wiring
07/02/2024Permit IssuedRICHARD NEU—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/04/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/25/2025Fail-Final General Construction Non-Directive 14FailView ↗
09/13/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/09/2022Pass-Final Boiler Equipment InspectionPassView ↗
08/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
08/01/2026Tenant Protection Plan ComplianceVitaly Ganopolskyspecial
07/27/2026Tenant Protection Plan Compliance—special
07/27/2026FinalDMYTRO CHORNOBRYVETSprogress
12/02/2024Air barrier - visual inspectionSteven Williamsenergy_progress
12/02/2024Fenestration and door U-factor and product ratingsSteven Williamsenergy_progress
12/02/2024Fenestration air leakageSteven Williamsenergy_progress
12/02/2024Fenestration areasSteven Williamsenergy_progress
11/06/2024Structural Stability – Alterations of existing buildingsSteven Williamsspecial
11/01/2024Wood – Seismic ResistanceSteven Williamsspecial
05/14/2024Tenant Protection Plan ComplianceTREVOR O. FLOWERSspecial
05/09/2024FinalTREVOR O. FLOWERSprogress
05/09/2024Fire-Resistant Penetrations and JointsSteven Williamsspecial
06/13/2022Fire-Resistant Penetrations and JointsSteven Williamsspecial
06/10/2022Heating SystemsSteven Williamsspecial
06/10/2022Fire-Resistant Penetrations and JointsSteven Williamsspecial
06/10/2022Heating SystemsSteven Williamsspecial
06/10/2022Fire-Resistant Penetrations and JointsSteven Williamsspecial
06/10/2022Fire-Resistant Penetrations and JointsSteven Williamsspecial
05/29/2021FinalSteven Williamsprogress
▾Documents — 85 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch5
08/25/2026B01045820-I1Request digital key ↗
08/23/2026B01048692-I1Request digital key ↗
08/16/2026B01437070-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/31/2026B00436739-P1Request digital key ↗
08/31/2026B00436739-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
08/31/2026B00436672-I1Request digital key ↗
08/31/2026B00436672-P1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
05/23/2012320361844Open ↗
05/21/2012320361844Open ↗
02/01/2012320361844Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
03/16/2012320361844Open ↗
02/15/2012320361844Open ↗
03/23/2010320136900Open ↗
▸Seals & Professional Certifications32
▸DOB NOWSpecial Inspector Seal & Signature10
09/29/2026B01437070-S1Open ↗
09/01/2026B00436672-P1Open ↗
09/01/2026B00436672-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/01/2026B00531350-I1Open ↗
08/31/2026B00436672-P1Open ↗
08/31/2026B00436672-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/24/2026B01437070-I1Open ↗
08/23/2026B01048692-I1Open ↗
08/23/2026B01048692-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
07/23/2013320361844Open ↗
02/01/2012320361844Open ↗
03/07/2011320136900Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
02/01/2012320361844Open ↗
03/17/2010320136900Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
02/01/2012320361844Open ↗
03/17/2010320136900Open ↗
▸Trade Schedules & Equipment10
▸BISSELF-CERT PLUMBING NOTICE8
04/18/2012320361844Open ↗
04/18/2012320361844Open ↗
04/18/2012320361844Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING2
02/01/2012320361844Open ↗
03/17/2010320136900Open ↗
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan4
08/13/2026B00436739-P1Open ↗
08/13/2026B00436672-P1Open ↗
08/13/2026B00436672-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026B01048692-I1Open ↗
08/16/2026B01437070-S1Open ↗
08/16/2026B01437070-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
02/01/2012320361844Open ↗
03/17/2010320136900Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/22/2013320361844Open ↗
▸BISTECHNICAL REPORT: ENERGY1
02/01/2012320361844Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
08/22/2013320361844Open ↗
03/07/2011320136900Open ↗
07/23/2013320361844Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
02/01/2012320361844Open ↗
03/17/2010320136900Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/07/2011320136900Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
07/23/2013320361844Open ↗
02/01/2012320361844Open ↗
03/07/2011320136900Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
05/23/2012320361844Open ↗
05/21/2012320361844Open ↗
12/30/2010320136900Open ↗
▸BISEFILING COVER SHEET2
02/01/2012320361844Open ↗
03/17/2010320136900Open ↗