Miscellaneous two family
1011 OCEAN PARKWAY
BROOKLYN · BIN 3171145
💬 Discuss this project
1960Year Built
3Stories
B9Building Class
R5Zoning
3,164 sfGross Floor Area
2Units
Miscellaneous two family · 4,000 sf lot · 0.79 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof2p · 2 filings · 6 docs
Floor 31p · 1 filing · 2 docs
Floor 21p · 1 filing · 4 docs
Floor 1
Cellar4p · 3 filings · 12 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/16/2021$4.2M—— → —$1,320/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WARREN MEISTER ARCHITECTS, PC302/14/2025
BGM ENGINEERING407/12/2023
RICHARD WAINER ARCHITECT, PLLC107/09/2023
RAAD307/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDIA BUILDING SOLUTION1003/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STRUCTURAL ENGINEERING &5699602/14/2025
RAAD7727207/06/2023
Building Lifecycle
All (75)Filed (11)Objection (34)Special Inspection (30)
02/14/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Install a 10'-0" curb cut on the East side of Ocean Parkway distant 67' South of Avenue J in conjunction with Alt CO Application, #B00853054-I1
B00853054-P1
02/11/2025
Special inspection requirement — Insulation placement and R values
ROBERT SIQECA
02/11/2025
Special inspection requirement — Underpinning
ROBERT SIQECA
02/11/2025
Special inspection requirement — Energy Code Compliance Inspections
ROBERT SIQECA
02/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
ROBERT SIQECA
02/11/2025
Special inspection requirement — Lowest Floor Elevation
ROBERT SIQECA
02/11/2025
Special inspection requirement — Preliminary
ROBERT SIQECA
02/11/2025
Special inspection requirement — Fenestration areas
ROBERT SIQECA
02/11/2025
Special inspection requirement — Metering
ROBERT SIQECA
02/11/2025
Special inspection requirement — Fireplaces
ROBERT SIQECA
02/11/2025
Special inspection requirement — Electric vehicle service equipment requirements
ROBERT SIQECA
02/11/2025
Special inspection requirement — Interior lighting power
ROBERT SIQECA
02/11/2025
Special inspection requirement — Air barrier — testing
ROBERT SIQECA
02/11/2025
Special inspection requirement — Fenestration air leakage
ROBERT SIQECA
02/11/2025
Special inspection requirement — Air barrier - visual inspection
ROBERT SIQECA
02/11/2025
Special inspection requirement — Maintenance information
ROBERT SIQECA
02/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ROBERT SIQECA
02/11/2025
Special inspection requirement — Protection of exposed foundation insulation
ROBERT SIQECA
02/11/2025
Special inspection requirement — Permanent certificate
ROBERT SIQECA
02/11/2025
Special inspection requirement — Concrete - Cast-In-Place
ROBERT SIQECA
02/11/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ROBERT SIQECA
02/11/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ROBERT SIQECA
02/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT SIQECA
02/11/2025
Special inspection requirement — Masonry
ROBERT SIQECA
02/11/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ROBERT SIQECA
02/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT SIQECA
02/11/2025
Special inspection requirement — Subgrade Inspections
ROBERT SIQECA
09/24/2023
Objection resolved — Addressed
09/24/2023
Objection resolved — Addressed
09/24/2023
Objection resolved — Addressed
09/24/2023
Objection resolved — Addressed
09/24/2023
Objection resolved — Addressed
09/24/2023
Objection resolved — Addressed
09/24/2023
Objection resolved — Addressed
09/24/2023
Objection resolved — Addressed
07/12/2023
Filed — Alteration
B00901463-I1
07/12/2023
Objection raised — Structural
07/12/2023
Objection raised — Zoning
07/12/2023
Objection raised — Scope
07/12/2023
Objection raised — Scope
07/12/2023
Objection raised — Scope
07/12/2023
Objection raised — Zoning
07/12/2023
Objection raised — Other
07/12/2023
Objection raised — Inspections
07/09/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
Install a 10'-0" curb cut on the East side of Ocean Parkway distant 67' South of Avenue J in conjunction with Alt CO Application, #B00853054-I1
B00853054-S1
07/06/2023
Filed — Alteration
B00870422-I1
07/06/2023
Filed — Alteration
HEREWITH FILING PLUMBING PLANS IN CONJUNCTION WITH APPLICATION # B00853054
B00870417-I1
07/05/2023
Filed — Alteration
HEREWITH FILING SPRINKLER PLANS IN CONJUNCTION WITH APPLICATION # B00853054
B00870427-I1
07/05/2023
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
07/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
06/05/2023
Filed — Alteration
HEREWITH FILING FOR A CONSTRUCTION FENCE IN CONJUNCTION WITH APPLICATION # B00853054
B00885193-I1
05/22/2023
Objection resolved — Addressed
05/22/2023
Objection resolved — Addressed
05/19/2023
Objection resolved — Addressed
05/19/2023
Objection resolved — Addressed
05/18/2023
Objection resolved — Addressed
05/18/2023
Objection resolved — Addressed
05/18/2023
Objection resolved — Addressed
05/18/2023
Objection resolved — Addressed
05/18/2023
Objection resolved — Addressed
Latest 60 of 75 events.
Nothing on file for this building.
1 project · most recent 07/05/2023
FiledStatusContractorScope
07/05/2023——74 heads
1 project · most recent 07/06/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/06/2023——Gas, Storm, Water/Sanitary
2 projects · most recent 05/11/2023
Steel Wood
FiledStatusContractorScope
05/11/2023——1 scope_items
05/11/2023——Steel, Wood
1 project · most recent 06/05/2023
Fence
FiledStatusContractorScope
06/05/2023——Fence
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
02/11/2025Insulation placement and R valuesROBERT SIQECAenergy_progress
02/11/2025UnderpinningROBERT SIQECAspecial
02/11/2025Energy Code Compliance InspectionsROBERT SIQECAprogress
02/11/2025Fire-Resistance Rated ConstructionROBERT SIQECAprogress
02/11/2025Lowest Floor ElevationROBERT SIQECAprogress
02/11/2025PreliminaryROBERT SIQECAprogress
02/11/2025Fenestration areasROBERT SIQECAenergy_progress
02/11/2025MeteringROBERT SIQECAenergy_progress
02/11/2025FireplacesROBERT SIQECAenergy_progress
02/11/2025Electric vehicle service equipment requirementsROBERT SIQECAenergy_progress
02/11/2025Interior lighting powerROBERT SIQECAenergy_progress
02/11/2025Air barrier — testing ROBERT SIQECAenergy_progress
02/11/2025Fenestration air leakageROBERT SIQECAenergy_progress
02/11/2025Air barrier - visual inspectionROBERT SIQECAenergy_progress
02/11/2025Maintenance informationROBERT SIQECAenergy_progress
02/11/2025Fenestration and door U-factor and product ratingsROBERT SIQECAenergy_progress
02/11/2025Protection of exposed foundation insulationROBERT SIQECAenergy_progress
02/11/2025Permanent certificateROBERT SIQECAenergy_progress
02/11/2025Concrete - Cast-In-PlaceROBERT SIQECAspecial
02/11/2025Excavations - Sheeting, Shoring, and BracingROBERT SIQECAspecial
02/11/2025Exterior Insulation and Finish Systems (EIFS)ROBERT SIQECAspecial
02/11/2025Fire-Resistant Penetrations and JointsROBERT SIQECAspecial
02/11/2025MasonryROBERT SIQECAspecial
02/11/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationROBERT SIQECAspecial
02/11/2025Structural Stability – Alterations of existing buildingsROBERT SIQECAspecial
Latest 25 of 43.
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/27/2026B00853054-P1Request digital key ↗
08/27/2026B00853054-I1Request digital key ↗
08/27/2026B00853054-S1Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00853054-I1Open ↗
08/13/2026B00853054-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00853054-P1Open ↗
08/13/2026B00853054-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00853054-I1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026B00853054-S1Open ↗
08/27/2026B00853054-P1Open ↗
08/27/2026B00853054-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B00870427-I1Open ↗
09/01/2026B00870405-I1Open ↗
08/31/2026B00870415-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B00870405-I1Open ↗
08/31/2026B00870415-I1Open ↗
08/24/2026B00870417-I1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B00853054-I1Open ↗
08/13/2026B00853054-P1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00853054-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00853054-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWGeotechnical Report (BC 1803.6)3
08/13/2026B00870410-I1Open ↗
08/13/2026B00870415-I1Open ↗
08/13/2026B00901463-I1Open ↗
▸Other Documents10
▸DOB NOWPlot Diagram3
08/13/2026B00870415-I1Open ↗
08/13/2026B00870410-I1Open ↗
08/13/2026B00901463-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00853054-I1Open ↗
08/13/2026B00853054-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B00853054-P1Open ↗
08/13/2026B00853054-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/27/2026B00853054-P1Open ↗
08/27/2026B00853054-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00870410-I1Open ↗