← Back
BuildNYC
Miscellaneous two family
1011 PRESIDENT STREET
BROOKLYN · BIN 3033155
💬 Discuss this project
1920Year Built
2Stories
B9Building Class
R6Zoning
2,640 sfGross Floor Area
2Units
2 Active Violations ▸
Miscellaneous two family · 3,275 sf lot · 0.81 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing · 9 docs
Penthouse1 filing · 9 docs
Floor 41 filing · 9 docs
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TR Development209/01/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NKM Engineering307/23/2026
Building Lifecycle
08/20/2026
Objection raised — Other
07/23/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL AND VERTICAL EXTENSION TO CONVERT EXISTING RESIDENTIAL BUILDING INTO 8 DWELLING UNITS.
B01381781-S1
07/23/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL AND VERTICAL EXTENSION TO CONVERT EXISTING RESIDENTIAL BUILDING INTO 8 DWELLING UNITS.
B01381781-S2
07/22/2026
Special inspection requirement — Energy Code Compliance Inspections
07/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
31 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 07/23/2026
Heating Systems
FiledStatusContractorScope
07/23/2026——Heating Systems
1 project · most recent 07/23/2026
Sprinkler System
FiledStatusContractorScope
07/23/2026——Sprinkler System
1 project · most recent 07/23/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/23/2026——Storm, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
07/22/2026Energy Code Compliance Inspections—progress
07/22/2026HVAC-R and service water heating system controls—energy_progress
07/22/2026Sprinkler Systems—special
07/22/2026HVAC-R and service water piping design and insulation—energy_progress
07/22/2026HVAC-R and service water heating equipment—energy_progress
07/22/2026Maintenance information—energy_progress
07/22/2026Fire-Resistant Penetrations and Joints—special
07/22/2026Post-installed Anchors—special
07/16/2026HVAC-R and service water heating equipment—energy_progress
07/16/2026HVAC-R and service water heating system controls—energy_progress
07/16/2026Shutoff dampers—energy_progress
07/16/2026Mechanical Systems—special
07/16/2026Fire-Resistant Penetrations and Joints—special
07/16/2026Energy Code Compliance Inspections—progress
07/16/2026Fire-Resistance Rated Construction—progress
07/16/2026Preliminary—progress
07/16/2026Final—progress
07/16/2026HVAC-R and service water piping design and insulation—energy_progress
04/01/2026Structural Stability – Alterations of existing buildings—special
04/01/2026Fenestration areas—energy_progress
04/01/2026Insulation placement and R values—energy_progress
04/01/2026Fenestration and door U-factor and product ratings—energy_progress
04/01/2026Fenestration air leakage—energy_progress
04/01/2026Air barrier - visual inspection—energy_progress
8 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account