← Back
One family attached or semi-detached
1012 HYLAN BOULEVARD
STATEN ISLAND · BIN 5130833
💬 Discuss this project
1970Year Built
2Stories
A5Building Class
R3-1Zoning
1,080 sfGross Floor Area
1Units
One family attached or semi-detached · 1,515 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
Mechanical
Cellar1p · 1 filing · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALNOUR CONSULTING412/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CM3 DESIGN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
5 BORO CONSTRUCTION SERV*General Contractor107/08/2026
V & M DRAIN CLEANING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALNOUR CONSULTING ENGINEE607312/01/2022
Building Lifecycle
All (18)Filed (4)Permit Issued (2)Signed Off (2)Inspection (4)Special Inspection (6)
12/30/2022
Signed off — Alteration
Plumbing application to remove existing lavatory, shower and sanitary pump from cellar. Application to legalize existing washer and gas dryer
S08009726-I1
12/16/2022
Signed off — Alteration
S08019789-I1
12/09/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nouredine Benabdelhak
12/06/2022
Special inspection requirement — Energy Code Compliance Inspections
Nouredine Benabdelhak
12/01/2022
Filed — Alteration
Plumbing application to remove existing lavatory, shower and sanitary pump from cellar. Application to legalize existing washer and gas dryer
S08009726-P2
11/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nouredine Benabdelhak
11/28/2022
Special inspection requirement — Energy Code Compliance Inspections
Nouredine Benabdelhak
11/23/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/07/2022
Filed — Alteration
Plumbing application to remove existing lavatory, shower and sanitary pump from cellar. Application to legalize existing washer and gas dryer
S08009726-P1
11/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nouredine Benabdelhak
11/07/2022
Special inspection requirement — Energy Code Compliance Inspections
Nouredine Benabdelhak
11/04/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/04/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/26/2022
Permit issued — General Construction
S08019789-I1-GC
10/15/2022
Filed — Alteration
S08019789-I1
10/13/2022
Permit issued — Plumbing
S08009726-I1-PL
10/04/2022
Filed — Alteration
Plumbing application to remove existing lavatory, shower and sanitary pump from cellar. Application to legalize existing washer and gas dryer
S08009726-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-off5 BORO CONSTRUCTION SERV*10/26/2022
DOB NOWPlumbingSigned-offV & M DRAIN CLEANING INC10/13/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/04/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
12/06/2022Fire-Resistant Penetrations and JointsNouredine Benabdelhakspecial
12/06/2022Energy Code Compliance InspectionsNouredine Benabdelhakprogress
11/28/2022Fire-Resistant Penetrations and JointsNouredine Benabdelhakspecial
11/28/2022Energy Code Compliance InspectionsNouredine Benabdelhakprogress
11/07/2022Fire-Resistant Penetrations and JointsNouredine Benabdelhakspecial
11/07/2022Energy Code Compliance InspectionsNouredine Benabdelhakprogress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026S08019789-I1Request digital key ↗
08/23/2026S08009726-I1Request digital key ↗
08/23/2026S08009726-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026S08009726-I1Open ↗
08/23/2026S08009726-P2Open ↗
08/23/2026S08009726-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026S08009726-I1Open ↗
08/26/2026S08009726-P1Open ↗
08/22/2026S08009726-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026S08009726-I1Open ↗
08/26/2026S08009726-P1Open ↗
08/22/2026S08009726-P2Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026S08009726-I1Open ↗
08/23/2026S08009726-P2Open ↗
08/23/2026S08009726-P1Open ↗
Showing 3 of 4 on file for this type