ECB02/26/2003PLUMBING WORK PERFORMED WAS REQUIRED TO BE PERFORM BY A LICENSED MASTER PLUMBER. INSTALLATION OF A NEW LOW PRESSURE BOILER AS WELL AS A NEW HOT WATER HEATER WITH ALL REALTED GAS WATER VENT PIPING IN BASEMENT. ANothing owed — awaiting certificate of correction
ECB02/26/2003PLUMBING WORK WITHOUT A PERMIT. INSTALLATION OF A NEW LOW PRESSURE BOILER AS WELL AS A NEW HOT WATER HEATER WITH ALL REALTED GAS WATER VENT PIPING IN BASEMENT. ALL WORK 100% COMPLETE. REMEDY; OBTAIN A PLUMBINGNothing owed — awaiting certificate of correction
ECB02/26/2003FAILURE TO HAVE NEW OR ALTERED BUILDING SYSTEM TESTED: 1, NEW LOW PRESSURE BOILER 2, NEW HOT WATER WEATER 3, NEW GAS LINE. 4, NEW WATER LINES 5, NEW VENT LINES. REMEDY; HAVE PROPER TESTS PERFORMED.Nothing owed — awaiting certificate of correction
Two family brick · 2,200 sf lot · 1.58 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.