← Back
Two family converted from one family
1014 PUTNAM AVENUE
BROOKLYN · Bedford-Stuyvesant (East) · BIN 3039764
💬 Discuss this project
1899Year Built
2Stories
B3Building Class
R6BZoning
2,295 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family converted from one family · Owner of record: TOWNHOUSE RENTAL, L.L.C. · 1,700 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanical
Roof3p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 1
Cellar4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRICKSTONE GROUP707/08/2026
TOWNHOUSE RENTAL, LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/10/2023$1.9M—CHESTNUT BRICKS LLC → TOWNHOUSE RENTAL II, L.L.C.$850/sf building
07/12/2022$1.1M—— → —$458/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.401/30/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM ARCH803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MORELL BUILDERS INCGeneral Contractor303/21/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781401/30/2023
Building Lifecycle
All (39)Filed (4)Permit Issued (2)Signed Off (2)Violation (1)Inspection (7)Special Inspection (23)
11/24/2025
Violation issued (HPD, closed)
I
02/10/2023
Signed off — Alteration
EXISTING TWO FAMILY HOUSE WITH PLUMBING WORK AT CELLAR, BASEMENT, 1ST & 2ND FLOOR. JOB FILED TO RELATED TO ALT1 APPLICATION #B00783253-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00783253-I1
02/09/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/06/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
02/02/2023
Special inspection requirement — Structural Steel - Details
CHRISTIAN LOZADA
02/02/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
02/02/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
02/02/2023
Special inspection requirement — Final
CHRISTIAN LOZADA
02/02/2023
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
02/02/2023
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
02/02/2023
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
02/02/2023
Special inspection requirement — Metering
CHRISTIAN LOZADA
02/02/2023
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
02/02/2023
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
02/02/2023
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
02/02/2023
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
02/02/2023
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
02/02/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
02/02/2023
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
02/02/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
01/30/2023
Filed — Alteration
EXISTING TWO FAMILY HOUSE WITH PLUMBING WORK AT CELLAR, BASEMENT, 1ST & 2ND FLOOR. JOB FILED TO RELATED TO ALT1 APPLICATION #B00783253-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00783253-P1
01/27/2023
Signed off — Alteration
EXISTING TWO FAMILY HOUSE WITH PLUMBING WORK AT CELLAR, BASEMENT, 1ST & 2ND FLOOR. JOB FILED TO RELATED TO ALT1 APPLICATION #B00783253-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00783253-S1
01/20/2023
Filed — Alteration
EXISTING TWO FAMILY HOUSE WITH PLUMBING WORK AT CELLAR, BASEMENT, 1ST & 2ND FLOOR. JOB FILED TO RELATED TO ALT1 APPLICATION #B00783253-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00783253-P2
01/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
01/20/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
01/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
01/20/2023
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
01/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
01/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
12/20/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/14/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/28/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/28/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/28/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/04/2022
Permit issued — Plumbing
B00783253-S1-PL
08/02/2022
Permit issued — General Construction
B00783253-I1-GC-CX
07/29/2022
Filed — Alteration
EXISTING TWO FAMILY HOUSE WITH PLUMBING WORK AT CELLAR, BASEMENT, 1ST & 2ND FLOOR. JOB FILED TO RELATED TO ALT1 APPLICATION #B00783253-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00783253-S1
07/28/2022
Filed — Alteration
EXISTING TWO FAMILY HOUSE WITH PLUMBING WORK AT CELLAR, BASEMENT, 1ST & 2ND FLOOR. JOB FILED TO RELATED TO ALT1 APPLICATION #B00783253-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00783253-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPLBG P & H INC08/04/2022
DOB NOWGeneral ConstructionSigned-offMORELL BUILDERS INC08/02/2022
1 project · most recent 08/11/2022
General Wiring
FiledStatusContractorScope
08/11/2022CompleteSOLID STATE ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/09/2023Pass-Final General Construction Non-Directive 14PassView ↗
02/06/2023Fail-Final General Construction Non-Directive 14FailView ↗
12/20/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/14/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/28/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/28/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
02/02/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
02/02/2023Structural Steel - DetailsCHRISTIAN LOZADAspecial
02/02/2023Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
02/02/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
02/02/2023FinalCHRISTIAN LOZADAprogress
02/02/2023Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
02/02/2023Fenestration areasCHRISTIAN LOZADAenergy_progress
02/02/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
02/02/2023MeteringCHRISTIAN LOZADAenergy_progress
02/02/2023Interior lighting powerCHRISTIAN LOZADAenergy_progress
02/02/2023Fenestration air leakageCHRISTIAN LOZADAenergy_progress
02/02/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
02/02/2023Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
02/02/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
02/02/2023Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
02/02/2023Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
02/02/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
01/20/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
01/20/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
01/20/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
01/20/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
01/20/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
01/20/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/29/2026B00783253-P1Request digital key ↗
08/29/2026B00783253-S1Request digital key ↗
08/29/2026B00783253-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/29/2026B00783253-P1Open ↗
08/29/2026B00783253-I1Open ↗
08/29/2026B00783253-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/30/2026B00783253-P2Open ↗
08/30/2026B00783253-P2Open ↗
08/25/2026B00783253-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/30/2026B00783253-P2Open ↗
08/25/2026B00783253-I1Open ↗
08/25/2026B00783253-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/29/2026B00783253-P1Open ↗
08/29/2026B00783253-S1Open ↗
08/29/2026B00783253-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00783253-S1Open ↗
08/13/2026B00783253-I1Open ↗