← Back
BuildNYC
Primarily 2 family with 1 store or office
1015 CASTLE HILL AVENUE
BRONX · Castle Hill-Unionport · BIN 2026310
💬 Discuss this project
1905Year Built
3Stories
S2Building Class
R5Zoning
5,104 sfGross Floor Area
3Units
3 Active Violations ▸
Primarily 2 family with 1 store or office · Owner of record: Light of Truth Mennonite Church of the P Ilgrim · 2,629 sf lot · 1.94 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 21 filing
Floor 11 filing
Cellar1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Light of Truth Mennonite Church503/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/10/2017$700K—1015 CASTLE LLC → LIGHT OF TRUTH MENNONITE CHURCH OF THE PILGRIM$137/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Eacado Designers Associates212/14/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
E&A Design and Expediter403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jada Plumbing & HeatingPlumbing707/08/2026
David Lopez, Master ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616212/14/2023
Building Lifecycle
All (12)Filed (2)Permit Issued (1)Signed Off (1)Violation (4)Inspection (2)Special Inspection (2)
08/26/2024
Signed off — Alteration
JOB FILED FOR INSTALL NEW GAS BOILER & NEW GAS HWH ON CELLAR FL ;INSTALL TWO NEW GAS DRYERS IN SECOND & THIRD FL WITH NEW GAS PIPING FROM CELLAR THRU 2nd & 3rd FLOORS AND TWO NEW GAS METERS IN EXISTING TWO FAMILY HOUSE. NO CHANGE IN USE, OCCUPANCY OR MEAN
X00789478-I1
01/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/14/2023
Filed — Alteration
JOB FILED FOR INSTALL NEW GAS BOILER & NEW GAS HWH ON CELLAR FL ;INSTALL TWO NEW GAS DRYERS IN SECOND & THIRD FL WITH NEW GAS PIPING FROM CELLAR THRU 2nd & 3rd FLOORS AND TWO NEW GAS METERS IN EXISTING TWO FAMILY HOUSE. NO CHANGE IN USE, OCCUPANCY OR MEAN
X00789478-P1
12/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/08/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/27/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/02/2023
Permit issued — Plumbing
X00789478-I1-PL
08/13/2022
Filed — Alteration
JOB FILED FOR INSTALL NEW GAS BOILER & NEW GAS HWH ON CELLAR FL ;INSTALL TWO NEW GAS DRYERS IN SECOND & THIRD FL WITH NEW GAS PIPING FROM CELLAR THRU 2nd & 3rd FLOORS AND TWO NEW GAS METERS IN EXISTING TWO FAMILY HOUSE. NO CHANGE IN USE, OCCUPANCY OR MEAN
X00789478-I1
03/02/2015
Failure to maintain bldg in code compliant manner.re:installation/maintainance of plumbing/materials/equipment per PC102.3;27-902.failure to…
ECB violation · closed
07/18/2005
Section 27-2024 admin. Code: provide adequate supply of hot water for the fixtures kitchen / bath in the entire apartment located at apt 3,…
HPD violation · open
07/18/2005
SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW…
HPD violation · open
07/18/2005
SECTION 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON…
HPD violation · open
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Jada Plumbing & Heating—
BIS—Rafalex Contracting—
BIS—Cape Plumbing—
BIS—Cape Plumbing—
BIS—Jem Fire Prevention—
BIS—M&G Plumbing and Heating—
BIS—Rafalex Contracting—
BIS—Rafalex Contracting—
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/22/2026X00789478-P1Request the plans ↗
08/22/2026X00789478-I1Request the plans ↗
▸Applications & Permits19
▸BISWORK PERMIT APPLICATION10
12/20/2019220639209Open ↗
12/20/2019220639209Open ↗
12/19/2019220639209Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION8
11/14/2019220639209Open ↗
10/02/2019220639209Open ↗
05/20/2019220639209Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/21/2024220649724Open ↗
▸Seals & Professional Certifications13
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
10/05/2018220639209Open ↗
10/05/2018220639209Open ↗
05/16/2018220649724Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/22/2026X00789478-I1Open ↗
08/22/2026X00789478-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026X00789478-I1Open ↗
08/26/2026X00789478-P1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/01/2019240253211Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/01/2019240253211Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/01/2019240253211Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
10/02/2019220639209Open ↗
05/20/2019220639209Open ↗
03/14/2018220639209Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
05/08/2019220639209Open ↗
▸BISSCHEDULE B - PLUMBING1
05/01/2019240253211Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
06/14/2018220639209Open ↗
05/01/2019240253211Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/01/2019240253211Open ↗
03/14/2018220639209Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/22/2026X00789478-I1Open ↗
08/22/2026X00789478-P1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
07/18/2019240253211Open ↗
03/14/2018220639209Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
05/13/2021220639209Open ↗
07/18/2019240253211Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/01/2019240253211Open ↗
▸BISNYCECC ANALYSIS1
05/01/2019240253211Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
05/13/2021220639209Open ↗
05/01/2019240253211Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/18/2019240253211Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
05/13/2021220639209Open ↗
07/18/2019240253211Open ↗
05/01/2019240253211Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET4
05/16/2018220649724Open ↗
03/14/2018220639209Open ↗
03/14/2018220639209Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
02/21/2024220649724Open ↗
07/18/2019240253211Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/01/2019240253211Open ↗