← Back
BuildNYC
Elevator apt, semi-fireproof without stores
1015 EAST GUN HILL ROAD
BRONX · BIN 2130976
💬 Discuss this project
2023Year Built
7Stories
D1Building Class
R6AZoning
55,959 sfGross Floor Area
84Units
LL97 CoveredRent Stabilized4 Active Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: 1015 Gun Hill · 19,000 sf lot · 2.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBuilding protection28p · 2 filings · 20 docs
BulkheadNew 7 Story Residential Building5p · 1 filing · 20 docs
Floor 7New 7 Story Residential Building29p · 1 filing · 20 docs
Floor 6New 7 Story Residential Building33p · 1 filing · 20 docs
Floor 5New 7 Story Residential Building31p · 1 filing · 20 docs
Floor 4New 7 Story Residential Building31p · 1 filing · 20 docs
Floor 3New 7 Story Residential Building31p · 1 filing · 20 docs
Floor 2New 7 Story Residential Building31p · 1 filing · 20 docs
Floor 1New 7 Story Residential Building217p · 6 filings · 20 docs
CellarNew 7 Story Residential Building22p · 1 filing · 20 docs
Site & exterior1015 Gun Hill LLC25p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1015 Gun Hill3307/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/13/2021$3.5M—MAGRO REALTY, INC. → 1015 Gun Hill— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Node Architecture, Engineering2406/06/2024
Asr Engineering208/07/2023
Syed Engineering401/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Node Engineering Consulting4403/21/2026
Expediting603/21/2026
Node Arch Engin Consulting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kodra ConstructionGeneral Contractor1107/08/2026
Topline NYC ContractingScaffold707/08/2026
Kodra ConstructionScaffold203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
International Geotehcnica17951406/06/2024
Node Architecture, Engineering67991806/06/2024
Building Lifecycle
12/02/2025
Elevator Category 1 inspection report filed
07/31/2024
Signed off — Alteration
X00737264-I1
07/31/2024
Permit issued — Protection and Mechanical Methods
X00737264-I1-PMM
07/18/2024
Closed: Construction: other (DOB violation)
DOB violation · closed on the city's record
07/10/2024
Signed off — New Building
FILING MECHANICAL WORK IN CONJUNCTION TO NEW BUILDING APPLICATION, NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X00640964-S5
98 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsSigned-offKodra Construction07/31/2024
DOB NOWCurb CutSigned-offKodra Construction06/20/2024
DOB NOWMechanical SystemsSigned-offKodra Construction05/31/2024
DOB NOWSidewalk ShedSigned-offTopline NYC Contracting12/23/2021
DOB NOWSidewalk ShedSigned-offTopline NYC Contracting12/23/2021
DOB NOWSidewalk ShedSigned-offTopline NYC Contracting12/23/2021
1 project · most recent 06/06/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
06/06/2024Signed-offKodra ConstructionHeating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 06/06/2024
Sprinkler System
FiledStatusContractorScope
06/06/2024Signed-offPrime Piping & HeatingSprinkler System
1 project · most recent 06/06/2024
Storm Water/Sanitary
FiledStatusContractorScope
06/06/2024Signed-offHorbridge Plumbing & HeatingStorm, Water/Sanitary
5 projects · most recent 06/16/2024
General Wiring
FiledStatusContractorScope
06/16/2024CompleteAV Group ElectricalGeneral Wiring
03/27/2024CompleteAL Electrical Group—
07/03/2023CompleteRichard Neu—
06/21/2023CancelledAV Group ElectricalGeneral Wiring
05/07/2023CompleteAV Group Electrical—
2 projects · most recent 06/06/2024
Steel Concrete Masonry
FiledStatusContractorScope
06/06/2024Signed-offKodra ConstructionSteel, Concrete, Masonry
05/19/2022Permit IssuedKodra Construction—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/05/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 115
DateRequirementInspectorRole
06/12/2024Exterior lighting powerRadomir Delicenergy_progress
06/12/2024MeteringRadomir Delicenergy_progress
06/12/2024Exterior Insulation and Finish Systems (EIFS)Radomir Delicspecial
06/12/2024Air barrier - visual inspectionRadomir Delicenergy_progress
06/12/2024Electrical motors and elevatorsRadomir Delicenergy_progress
06/12/2024Fenestration and door U-factor and product ratingsRadomir Delicenergy_progress
06/12/2024Insulation placement and R valuesRadomir Delicenergy_progress
06/12/2024Air barrier — testing Radomir Delicenergy_progress
06/12/2024Lighting controlsRadomir Delicenergy_progress
06/12/2024Interior lighting powerRadomir Delicenergy_progress
06/12/2024Protection of exposed foundation insulationRadomir Delicenergy_progress
06/12/2024Fenestration areasRadomir Delicenergy_progress
06/12/2024Maintenance informationRadomir Delicenergy_progress
06/12/2024Fenestration air leakageRadomir Delicenergy_progress
06/12/2024Energy Code Compliance InspectionsRadomir Delicprogress
06/12/2024Fire-Resistance Rated ConstructionRadomir Delicprogress
06/12/2024Lighting in dwelling unitsRadomir Delicenergy_progress
06/12/2024Fire-Resistant Penetrations and JointsRadomir Delicspecial
05/03/2024Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
05/03/2024HVAC-R and service water piping design and insulationMICHAEL KARANTINIDIS, P.E.energy_progress
05/03/2024Fire-Resistant Penetrations and JointsRadomir Delicspecial
05/03/2024Sprinkler SystemsMICHAEL KARANTINIDIS, P.E.special
05/03/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMICHAEL KARANTINIDIS, P.E.special
05/03/2024HVAC-R and service water heating system controlsMICHAEL KARANTINIDIS, P.E.energy_progress
03/13/2024Electrical motors and elevatorsRadomir Delicenergy_progress
Latest 25 of 115.
242 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account