← Back
Elevator apt, semi-fireproof without stores
1015 EAST GUN HILL ROAD
BRONX · Williamsbridge-Olinville · BIN 2130976
💬 Discuss this project
2023Year Built
7Stories
D1Building Class
R6AZoning
55,959 sfGross Floor Area
84Units
LL97 CoveredRent Stabilized4 Open Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: 1015 GUN HILL LLC · 19,000 sf lot · 2.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Roof29p · 2 filings · 20 docs
Floor 730p · 1 filing · 20 docs
Floor 634p · 1 filing · 20 docs
Floor 532p · 1 filing · 20 docs
Floor 432p · 1 filing · 20 docs
Floor 332p · 1 filing · 20 docs
Floor 232p · 1 filing · 20 docs
Floor 1229p · 6 filings · 20 docs
Cellar23p · 1 filing · 20 docs
Site & exterior25p · 3 filings · 20 docs
Filed — no permit issued6p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1015 GUN HILL LLC3307/08/2026
KODRA CONSTRUCTION2803/22/2026
TOPLINE NYC CONTRACTING1107/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/13/2021$3.5M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NODE ARCHITECTURE,ENGINEERING, CONS2406/06/2024
ASR ENGINEERING PC208/07/2023
SYED ENGINEERING, P.C.401/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NODE ENGINEERING CONSULTING4403/21/2026
ADVANCED BUILDERS SERVICES603/21/2026
NODE ARCH ENGIN CONSULT103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KODRA CONSTRUCTION CORPGeneral Contractor1307/08/2026
TOPLINE NYC CONTRACTINGGeneral Contractor707/08/2026
RICHARD NEUElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTERNATIONAL GEOTEHCNICA17951406/06/2024
NODE ARCHITECTURE,ENGINEE67991806/06/2024
Building Lifecycle
All (108)Filed (30)Permit Issued (6)Signed Off (13)Violation (2)Inspection (1)Objection (26)Special Inspection (30)
07/31/2024
Signed off — Alteration
X00737264-I1
07/31/2024
Permit issued — Protection and Mechanical Methods
X00737264-I1-PMM
07/10/2024
Signed off — New Building
FILING MECHANICAL WORK IN CONJUNCTION TO NEW BUILDING APPLICATION, NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X00640964-S5
07/05/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/20/2024
Permit issued — Curb Cut
X00640964-S5-CC
06/13/2024
Signed off — New Building
FILING MECHANICAL WORK IN CONJUNCTION TO NEW BUILDING APPLICATION, NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X00640964-Z1
06/12/2024
Signed off — Alteration
X00650397-I1
06/12/2024
Signed off — Alteration
X00650399-I1
06/12/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X00650401-I1
06/12/2024
Objection resolved — Addressed
06/12/2024
Special inspection requirement — Fenestration air leakage
Radomir Delic
06/12/2024
Special inspection requirement — Interior lighting power
Radomir Delic
06/12/2024
Special inspection requirement — Fire-Resistance Rated Construction
Radomir Delic
06/12/2024
Special inspection requirement — Lighting in dwelling units
Radomir Delic
06/12/2024
Special inspection requirement — Maintenance information
Radomir Delic
06/12/2024
Special inspection requirement — Metering
Radomir Delic
06/12/2024
Special inspection requirement — Protection of exposed foundation insulation
Radomir Delic
06/12/2024
Special inspection requirement — Energy Code Compliance Inspections
Radomir Delic
06/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
06/12/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Radomir Delic
06/12/2024
Special inspection requirement — Exterior lighting power
Radomir Delic
06/12/2024
Special inspection requirement — Fenestration areas
Radomir Delic
06/12/2024
Special inspection requirement — Air barrier — testing
Radomir Delic
06/12/2024
Special inspection requirement — Insulation placement and R values
Radomir Delic
06/12/2024
Special inspection requirement — Electrical motors and elevators
Radomir Delic
06/12/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Radomir Delic
06/12/2024
Special inspection requirement — Air barrier - visual inspection
Radomir Delic
06/12/2024
Special inspection requirement — Lighting controls
Radomir Delic
06/10/2024
Signed off — New Building
FILING MECHANICAL WORK IN CONJUNCTION TO NEW BUILDING APPLICATION, NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X00640964-S9
06/06/2024
Filed — New Building
FILING MECHANICAL WORK IN CONJUNCTION TO NEW BUILDING APPLICATION, NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X00640964-A3
06/04/2024
Objection resolved — Addressed
06/03/2024
Signed off — Alteration
FULL WORK ON FOUNDATION AND EARTH WORK AS REVIEWED AND APPROVED BY OER. FILED IN CONJUNCTION WITH NB APP#X00640964-I.
X00725659-I1
06/01/2024
Signed off — Alteration
Construction Fence filed in conjunction with NB#X00640964-I1
X00561360-I1
06/01/2024
Signed off — New Building
FILING MECHANICAL WORK IN CONJUNCTION TO NEW BUILDING APPLICATION, NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X00640964-S8
05/31/2024
Permit issued — Mechanical Systems
X00640964-S9-MS
05/31/2024
Objection raised — Other
05/31/2024
Objection resolved — Addressed
05/29/2024
Filed — New Building
FILING MECHANICAL WORK IN CONJUNCTION TO NEW BUILDING APPLICATION, NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X00640964-A2
05/23/2024
Objection raised — Other
05/17/2024
Objection resolved — Addressed
05/08/2024
Objection raised — Other
05/03/2024
Filed — New Building
FILING MECHANICAL WORK IN CONJUNCTION TO NEW BUILDING APPLICATION, NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X00640964-A1
05/03/2024
Filed — New Building
FILING MECHANICAL WORK IN CONJUNCTION TO NEW BUILDING APPLICATION, NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X00640964-P9
05/03/2024
Special inspection requirement — Maintenance information
MICHAEL KARANTINIDIS, P.E.
05/03/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL KARANTINIDIS, P.E.
05/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL KARANTINIDIS, P.E.
05/03/2024
Special inspection requirement — Sprinkler Systems
MICHAEL KARANTINIDIS, P.E.
05/03/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MICHAEL KARANTINIDIS, P.E.
05/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
04/05/2024
Signed off — Alteration
X00897809-I1
04/03/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X00650395-I1
03/18/2024
Signed off — Alteration
X00915061-I1
03/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL KARANTINIDIS, P.E.
03/13/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MICHAEL KARANTINIDIS, P.E.
03/13/2024
Special inspection requirement — Sprinkler Systems
MICHAEL KARANTINIDIS, P.E.
03/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL KARANTINIDIS, P.E.
03/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
03/13/2024
Special inspection requirement — Maintenance information
MICHAEL KARANTINIDIS, P.E.
02/29/2024
Objection raised — Other
02/21/2024
Filed — New Building
FILING MECHANICAL WORK IN CONJUNCTION TO NEW BUILDING APPLICATION, NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X00640964-P8
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsSigned-offKODRA CONSTRUCTION CORP07/31/2024
DOB NOWCurb CutSigned-offKODRA CONSTRUCTION CORP06/20/2024
DOB NOWMechanical SystemsSigned-offKODRA CONSTRUCTION CORP05/31/2024
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING12/23/2021
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING12/23/2021
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING12/23/2021
1 project · most recent 06/06/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/06/2024Signed-offKODRA CONSTRUCTION CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-2C20NAHZ4 18,000 BTU · Condensing Unit ×195
MXZ-3C24NAHZ4 22,000 BTU · Heat Pump Outdoor ×39
MUZ-FS09NA 9,000 BTU · Condensing Unit ×24
MSZ-FS06NA-U1 6,000 BTU · Fan Coil Indoor ×176
MSZ-FS09NA-U1 9,000 BTU · Fan Coil Indoor ×172
MXZ-2C20NAHZ 25,500 BTU · Condensing Unit ×64
MXZ-3C24NAHZ 27,000 BTU · Heat Pump Outdoor ×15
MUZ-FS09NAH-U1 18,000 BTU · Condensing Unit ×9
Ventilation
Panasonic FV-10VE2 60 CFM · Erv ×187
FV-`10VE2 60 CFM · Erv ×39
FV-0511VF1 110 CFM · Exhaust Fan ×4
Titus 271FS 50 CFM ×360
23RL 50 CFM · Exhaust Fan ×188
Greenheck G-095-VG 665 CFM · Exhaust Fan ×2
Mitsubishi Electric LGH-F300RVX-E 300 CFM · Erv ×84
1 project · most recent 06/06/2024
Sprinkler System
FiledStatusContractorScope
06/06/2024Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 06/06/2024
Storm Water/Sanitary
FiledStatusContractorScope
06/06/2024Signed-offHORBRIDGE PLUMBING & HEATStorm, Water/Sanitary
5 projects · most recent 06/16/2024
General Wiring
FiledStatusContractorScope
06/16/2024CompleteAV GROUP ELECTRICAL LLCGeneral Wiring
03/27/2024CompleteAL ELECTRICAL GROUP INC—
07/03/2023CompleteRICHARD NEU—
06/21/2023CancelledAV GROUP ELECTRICAL LLCGeneral Wiring
05/07/2023CompleteAV GROUP ELECTRICAL LLC1 meters, 1 new_meters
2 projects · most recent 06/06/2024
Steel Concrete Masonry
FiledStatusContractorScope
06/06/2024Signed-offKODRA CONSTRUCTION CORPSteel, Concrete, Masonry
05/19/2022Permit IssuedKODRA CONSTRUCTION CORP1 scope_items
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/05/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 110
DateRequirementInspectorRole
06/12/2024Fire-Resistance Rated ConstructionRadomir Delicprogress
06/12/2024Interior lighting powerRadomir Delicenergy_progress
06/12/2024MeteringRadomir Delicenergy_progress
06/12/2024Maintenance informationRadomir Delicenergy_progress
06/12/2024Fenestration areasRadomir Delicenergy_progress
06/12/2024Protection of exposed foundation insulationRadomir Delicenergy_progress
06/12/2024Lighting controlsRadomir Delicenergy_progress
06/12/2024Fenestration air leakageRadomir Delicenergy_progress
06/12/2024Lighting in dwelling unitsRadomir Delicenergy_progress
06/12/2024Air barrier - visual inspectionRadomir Delicenergy_progress
06/12/2024Electrical motors and elevatorsRadomir Delicenergy_progress
06/12/2024Fenestration and door U-factor and product ratingsRadomir Delicenergy_progress
06/12/2024Insulation placement and R valuesRadomir Delicenergy_progress
06/12/2024Air barrier — testing Radomir Delicenergy_progress
06/12/2024Exterior lighting powerRadomir Delicenergy_progress
06/12/2024Exterior Insulation and Finish Systems (EIFS)Radomir Delicspecial
06/12/2024Fire-Resistant Penetrations and JointsRadomir Delicspecial
06/12/2024Energy Code Compliance InspectionsRadomir Delicprogress
05/03/2024Sprinkler SystemsMICHAEL KARANTINIDIS, P.E.special
05/03/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMICHAEL KARANTINIDIS, P.E.special
05/03/2024HVAC-R and service water heating system controlsMICHAEL KARANTINIDIS, P.E.energy_progress
05/03/2024Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
05/03/2024HVAC-R and service water piping design and insulationMICHAEL KARANTINIDIS, P.E.energy_progress
05/03/2024Fire-Resistant Penetrations and JointsRadomir Delicspecial
03/13/2024Interior lighting powerRadomir Delicenergy_progress
Latest 25 of 110.
▾Documents — 238 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch30
08/24/2026X00650397-I1Request digital key ↗
08/24/2026X00650399-I1Request digital key ↗
08/24/2026X00650401-I1Request digital key ↗
Showing 3 of 30 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
02/15/2024240333732Open ↗
01/20/2023240333732Open ↗
11/28/2022240333732Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
11/28/2022240333732Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/21/2026X00640964-I1Open ↗
08/13/2026X00640964-P1Open ↗
08/13/2026X00640964-P9Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/21/2026X00640964-P1Open ↗
08/21/2026X00640964-I1Open ↗
08/15/2026X00640964-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications127
▸DOB NOWProgress Inspector Seal & Signature64
09/25/2026X00725659-I1Open ↗
09/25/2026X00725659-I1Open ↗
09/02/2026X00640964-P7Open ↗
Showing 3 of 64 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature32
09/25/2026X00725659-I1Open ↗
09/25/2026X00725659-I1Open ↗
09/25/2026X00725659-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature30
08/24/2026X00650397-I1Open ↗
08/24/2026X00650399-I1Open ↗
08/24/2026X00650401-I1Open ↗
Showing 3 of 30 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/28/2022240333732Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/21/2026X00640964-P1Open ↗
08/21/2026X00640964-I1Open ↗
08/15/2026X00640964-P2Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist4
08/21/2026X00640964-P1Open ↗
08/21/2026X00640964-I1Open ↗
08/13/2026X00640964-P9Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
03/19/2024240333732Open ↗
11/28/2022240333732Open ↗
▸BISSTREET TREE SIGNOFF1
07/05/2024240333732Open ↗
▸BISSTREET TREES SITE PLAN1
11/28/2022240333732Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00640964-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00640964-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00640964-I1Open ↗
▸Environmental & Asbestos28
▸DOB NOWOER: Notice to Proceed15
08/21/2026X00640964-I1Open ↗
08/21/2026X00640964-I1Open ↗
08/21/2026X00640964-A2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWOER: Notice of Satisfaction11
08/21/2026X00640964-I1Open ↗
08/13/2026X00725659-I1Open ↗
08/13/2026X00640964-Z1Open ↗
Showing 3 of 11 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
07/05/2024240333732Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
02/28/2023240333732Open ↗
▸Energy Compliance4
▸DOB NOWPreliminary Commissioning Report Certification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
03/19/2024240333732Open ↗
02/07/2023240333732Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/28/2022240333732Open ↗
▸Other Documents17
▸DOB NOWSite Survey: Initial4
08/21/2026X00640964-P1Open ↗
08/21/2026X00640964-I1Open ↗
08/15/2026X00640964-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/21/2026X00640964-P1Open ↗
08/21/2026X00640964-I1Open ↗
08/15/2026X00640964-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/21/2026X00640964-P1Open ↗
08/21/2026X00640964-I1Open ↗
08/15/2026X00640964-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026X00723866-I1Open ↗
08/13/2026X00725659-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
02/28/2023240333732Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026X00640964-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00640964-I1Open ↗