Parks / recreation facility
Mullaly Park-LOCKER ROOM
1015 RIVER AVENUE · BIN 2101520
💬 Discuss this project
1962Year Built
1Stories
Q1Building Class
PARKZoning
24,730 sfGross Floor Area
1Units
5 Open Violations 3 unresolved · 2 paperwork only ▸
Parks / recreation facility · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 238,000 sf lot · 0.1 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MATRIX NEW WORLD ENGINEERING206/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BOYD CONSULTING603/21/2026
Building Lifecycle
All (17)Filed (3)Violation (3)Special Inspection (11)
06/05/2025
Filed — Alteration
X01217975-S1
06/05/2025
Filed — Alteration
FILING FOR EARTHWORK APPLICATIION TO RECONSTRUCT THE SKATE AND BIKE PARKAT REV. T. WENDELL FOSTER PARKAT THE CORNER OF RIVER AVE & EAST 164TH STREET.THE TOTAL PROJECT AREA IS 1, ACRE INCLUDES ADJACENTSIDEWALK AREAS ON RIVER AVE AND EAST 164 ST.
X01211527-I1
06/04/2025
Filed — Alteration
X01217975-I1
05/16/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
05/05/2025
Special inspection requirement — Concrete - Cast-In-Place
05/05/2025
Special inspection requirement — Structural Steel - Welding
05/05/2025
Special inspection requirement — Final
05/05/2025
Special inspection requirement — Structural Steel - Details
04/30/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
04/30/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
04/29/2025
Special inspection requirement — Subgrade Inspections
04/29/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
04/29/2025
Special inspection requirement — Final
04/16/2025
Special inspection requirement — Final
10/18/2011
Violation issued (HPD, open)
B
10/18/2011
Violation issued (HPD, open)
B
04/02/2005
Violation issued (HPD, open)
C
Nothing on file for this building.
1 project · most recent 02/08/2018
General Wiring
FiledStatusContractorScope
02/08/2018Permit IssuedINNOVATIVE ELEC. OF NY,INGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
05/16/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
05/05/2025Concrete - Cast-In-Place—special
05/05/2025Structural Steel - Welding—special
05/05/2025Final—progress
05/05/2025Structural Steel - Details—special
04/30/2025Subsurface Conditions – Fill Placement & In-Place Density—special
04/30/2025Subsurface Investigations (Borings/Test Pits)—special
04/29/2025Subgrade Inspections—special
04/29/2025Excavations - Sheeting, Shoring, and Bracing—special
04/29/2025Final—progress
04/16/2025Final—progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/19/2026X01211527-I1Request digital key ↗
08/19/2026X01217975-S1Request digital key ↗
08/19/2026X01217975-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/19/2026X01211527-I1Open ↗
08/19/2026X01217975-S1Open ↗
08/19/2026X01217975-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026X01211527-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/19/2026X01217975-I1Open ↗
08/19/2026X01217975-S1Open ↗
08/13/2026X01211527-I1Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
08/13/2026X01217975-S1Open ↗
08/13/2026X01211527-I1Open ↗
08/13/2026X01217975-I1Open ↗