← Back
One story retail building
1011 WESTCHESTER AVENUE
BRONX · BIN 2095486
💬 Discuss this project
1928Year Built
1Stories
K1Building Class
R7-1Zoning
9,270 sfGross Floor Area
6Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
One story retail building · Owner of record: 1025 WESTCHESTER PRPRTS · 10,423 sf lot · 0.89 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 144p · 3 filings · 20 docs
Cellar40p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1025 WESTCHESTER PROPERTIES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OMFPE CONSULTING PLLC1111/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CITY CONSULTANT ENGINEERING2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY BUILDING ASSOCIATES INGeneral Contractor407/08/2026
EDWARD PEREZElectrical103/21/2026
JIMENEZ LUISElectrical103/21/2026
LUIS JIMENEZElectrical103/21/2026
CJ HEATING & MECHANICAL CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ADJ ENGINEERING PLLC7640811/17/2024
Building Lifecycle
All (64)Filed (11)Permit Issued (4)Violation (5)Inspection (4)Objection (14)Special Inspection (26)
11/21/2024
Objection raised — Other
11/17/2024
Filed — Alteration
INSTALL NEW COOKING EQUIPMENTS IN THE KICHEN AREA. INSTALL NEW PLUMBING FIXTURES.REPLACE AND RELOCATE PLUMBING FIXTURES AS PER PLAN. NO CHANGE IN USE, BULK, OR OCCUPANCY.
X08027613-P3
10/29/2024
Violation issued (FDNY_ORDER, closed)
10/29/2024
Violation issued (FDNY_ORDER, closed)
10/29/2024
Violation issued (FDNY_ORDER, closed)
10/29/2024
Violation issued (FDNY_ORDER, closed)
10/29/2024
Violation issued (FDNY_ORDER, closed)
09/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dwayne Williams
03/20/2024
Objection raised — Admin
03/19/2024
Filed — Alteration
Install Exhaust Ventilation system and associated ducts and piping from 1st floor to roof as per plan. Install new roof top HVAC system. No change in use, egress or occupancy.
X00379647-P1
03/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dwayne Williams
03/14/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dwayne Williams
03/11/2024
Filed — Alteration
REMOVE NON-BEARING WALL BETWEEN 1015 AND 1017 WESTCHESTER AVE SPACE. COMBINED 1015 AND 1017 WESTCHESTER AVE COMMERCIAL SPACE.
X00568287-P1
02/27/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/27/2023
Filed — Alteration
TO MAKE MINOR STOREFRONT RENOVATION (U.G.6) AS PER PLAN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X08018574-P1
10/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dwayne Williams
07/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dwayne Williams
07/21/2023
Filed — Alteration
INSTALL NEW COOKING EQUIPMENTS IN THE KICHEN AREA. INSTALL NEW PLUMBING FIXTURES.REPLACE AND RELOCATE PLUMBING FIXTURES AS PER PLAN. NO CHANGE IN USE, BULK, OR OCCUPANCY.
X08027613-P2
07/10/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dwayne Williams
06/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dwayne Williams
06/09/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/03/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/22/2023
Filed — Alteration
INSTALL NEW COOKING EQUIPMENTS IN THE KICHEN AREA. INSTALL NEW PLUMBING FIXTURES.REPLACE AND RELOCATE PLUMBING FIXTURES AS PER PLAN. NO CHANGE IN USE, BULK, OR OCCUPANCY.
X08027613-P1
04/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dwayne Williams
04/05/2023
Permit issued — Plumbing
X08027613-I1-PL
12/06/2022
Permit issued — General Construction
X08018574-I1-GC
12/05/2022
Objection raised — Scope
12/05/2022
Objection resolved — Addressed
11/25/2022
Filed — Alteration
INSTALL NEW COOKING EQUIPMENTS IN THE KICHEN AREA. INSTALL NEW PLUMBING FIXTURES.REPLACE AND RELOCATE PLUMBING FIXTURES AS PER PLAN. NO CHANGE IN USE, BULK, OR OCCUPANCY.
X08027613-I1
11/17/2022
Permit issued — Construction Fence
X00796961-I1-FN
10/27/2022
Objection raised — Admin
10/27/2022
Objection resolved — Addressed
10/19/2022
Filed — Alteration
TO MAKE MINOR STOREFRONT RENOVATION (U.G.6) AS PER PLAN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X08018574-I1
09/13/2022
Special inspection requirement — HVAC insulation and sealing
09/13/2022
Special inspection requirement — Maintenance information
09/13/2022
Special inspection requirement — Shutoff dampers
09/13/2022
Special inspection requirement — HVAC and service water heating equipment
09/13/2022
Special inspection requirement — Final
09/13/2022
Special inspection requirement — Energy Code Compliance Inspections
09/13/2022
Special inspection requirement — Mechanical Systems
09/13/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/13/2022
Special inspection requirement — HVAC and service water heating system controls
08/24/2022
Filed — Alteration
X00796961-I1
04/27/2022
Permit issued — General Construction
X00568287-I1-GC
04/22/2022
Objection raised — Other
04/22/2022
Objection resolved — Addressed
04/05/2022
Filed — Alteration
Install Exhaust Ventilation system and associated ducts and piping from 1st floor to roof as per plan. Install new roof top HVAC system. No change in use, egress or occupancy.
X00379647-I1
04/01/2022
Special inspection requirement — Shutoff dampers
04/01/2022
Special inspection requirement — HVAC and service water heating equipment
04/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/01/2022
Special inspection requirement — HVAC insulation and sealing
04/01/2022
Special inspection requirement — Maintenance information
04/01/2022
Special inspection requirement — HVAC and service water heating system controls
01/21/2022
Objection raised — Inspections
01/21/2022
Objection resolved — Addressed
01/21/2022
Objection raised — Accessibility
01/21/2022
Objection resolved — Addressed
01/21/2022
Objection raised — Scope
01/21/2022
Objection resolved — Addressed
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCJ HEATING & MECHANICAL C04/05/2023
DOB NOWGeneral ConstructionPermit IssuedNY BUILDING ASSOCIATES IN12/06/2022
DOB NOWConstruction FencePermit IssuedNY BUILDING ASSOCIATES IN11/17/2022
DOB NOWGeneral ConstructionPermit IssuedNY BUILDING ASSOCIATES IN04/27/2022
BISOTISSUEDNY BUILDING ASSOCIATES IN09/12/2022
BISOTISSUEDNY BUILDING ASSOCIATES IN09/12/2022
BISPLISSUEDCJ HEATING & MECHANICAL C05/24/2022
BISOTISSUEDNY BUILDING ASSOCIATES IN05/12/2022
BISOTISSUEDNY BUILDING ASSOCIATES IN05/12/2022
BISOTISSUEDCITY CONSULTANT ENGINEERI11/26/2019
BISPLISSUEDPREMIER PIPE SOLUTIONS09/24/2019
BISOTISSUEDCITY CONSULTANT ENGINEERI05/03/2019
BISFPISSUEDMASTER FIRE SYSTEMS, INC04/20/2018
BISPLISSUEDPRECISION PLBG SVCS., INC03/29/2018
BISFPISSUEDFIRE COMMAND CO, INC06/12/2012
BISPLISSUEDPRECISION PLBG SVCS., INC08/26/2011
BISPLISSUEDDPH PLUMBING & HTG CORP07/28/2011
BISFPISSUEDFIRE COMMAND CO, INC07/21/2011
BISMHISSUEDBCS CONSTRUCT SERV CORP07/21/2011
BISEQISSUEDBCS CONSTRUCT SERV CORP07/21/2011
1 project · most recent 03/19/2024
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/19/2024——Associated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
York ZF240N40R2C1AAA 240,000 BTU · Condensing Unit ×2
Ventilation
Pennbarry Flo Aire BDU24 1 BTU · Exhaust Fan ×2
1 project · most recent 11/17/2024
Gas Water/Sanitary
FiledStatusContractorScope
11/17/2024Permit IssuedCJ HEATING & MECHANICAL CGas, Water/Sanitary
2 projects · most recent 09/13/2022
General Wiring
FiledStatusContractorScope
09/13/2022Permit IssuedINTERSTATE ELECTRIC, LLCGeneral Wiring
10/02/2019Permit IssuedL J ELEC'L SERV. INC.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/27/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/10/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/09/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
09/19/2024Fire-Resistant Penetrations and JointsDwayne Williamsspecial
03/14/2024Fire-Resistant Penetrations and JointsDwayne Williamsspecial
03/14/2024Structural Stability – Alterations of existing buildingsDwayne Williamsspecial
10/27/2023Fire-Resistant Penetrations and JointsDwayne Williamsspecial
07/25/2023Fire-Resistant Penetrations and JointsDwayne Williamsspecial
06/27/2023Fire-Resistant Penetrations and JointsDwayne Williamsspecial
06/27/2023Fire-Resistant Penetrations and JointsDwayne Williamsspecial
04/20/2023Fire-Resistant Penetrations and JointsDwayne Williamsspecial
09/13/2022HVAC insulation and sealing —energy_progress
09/13/2022Maintenance information—energy_progress
09/13/2022Shutoff dampers—energy_progress
09/13/2022HVAC and service water heating equipment —energy_progress
09/13/2022Final—progress
09/13/2022Energy Code Compliance Inspections—progress
09/13/2022Mechanical Systems—special
09/13/2022Fire-Resistant Penetrations and Joints—special
09/13/2022HVAC and service water heating system controls —energy_progress
04/01/2022Shutoff dampers—energy_progress
04/01/2022HVAC and service water heating equipment —energy_progress
04/01/2022Fire-Resistant Penetrations and Joints—special
04/01/2022HVAC insulation and sealing —energy_progress
04/01/2022Maintenance information—energy_progress
04/01/2022HVAC and service water heating system controls —energy_progress
08/21/2020Energy Code Compliance Inspections—progress
08/03/2020Mechanical Systems—special
Latest 25 of 26.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
El Valle RestaurantRestaurant / Food ServiceCellar, Floor 1
Project X08027613 Alteration · Permit Entire · 11/25/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 137 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch9
08/24/2026X00796961-I1Request digital key ↗
08/22/2026X08027613-P3Request digital key ↗
08/22/2026X08027613-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/14/2026X00379647-I1Request digital key ↗
08/14/2026X00379647-P1Request digital key ↗
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION12
08/31/2023220717678Open ↗
02/02/2023220717678Open ↗
12/15/2022220717678Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION12
05/13/2022240252837Open ↗
05/13/2022220717678Open ↗
05/06/2021240252837Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications33
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/24/2026X00796961-I1Open ↗
08/22/2026X08018574-I1Open ↗
08/22/2026X08018574-P1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
11/20/2019220717678Open ↗
10/21/2019220717678Open ↗
04/03/2018220645915Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026X08027613-I1Open ↗
09/21/2026X08027613-P3Open ↗
09/01/2026X00568287-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
04/26/2019240252837Open ↗
04/03/2018220645915Open ↗
▸BISPROFESSIONAL/OWNER SIGNATURES1
10/21/2019220717678Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/03/2018220645915Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/26/2019240252837Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/26/2019240252837Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING4
04/26/2019240252837Open ↗
12/18/2012220105589Open ↗
05/11/2012220105589Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
05/01/2018220645915Open ↗
02/07/2018220105589Open ↗
12/01/2011220105589Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
12/01/2011220105589Open ↗
10/12/2011220105589Open ↗
09/23/2011220105589Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/22/2026X08018574-P1Open ↗
08/15/2026X08018574-I1Open ↗
08/14/2026X00379647-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
04/27/2012220140835Open ↗
06/04/2011220119832Open ↗
02/23/2011220105589Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/21/2019220717678Open ↗
04/26/2019240252837Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY2
07/11/2011220105589Open ↗
02/23/2011220105589Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/20/2019220717678Open ↗
02/14/2018220105589Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/26/2019240252837Open ↗
▸BISTR8: Energy Code Progress Inspections1
07/08/2011220105589Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/26/2019240252837Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/14/2018220105589Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/26/2019240252837Open ↗
▸Approvals, Objections & Sign-offs12
▸BISSUPERSEDING LETTER4
05/13/2022240252837Open ↗
05/13/2022220717678Open ↗
05/06/2021240252837Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
04/27/2012220140835Open ↗
06/04/2011220119832Open ↗
02/23/2011220105589Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
02/19/2019220645915Open ↗
02/14/2018220105589Open ↗
11/17/2017220105589Open ↗
▸BISFIRE SUPPRESSION SYSTEM (FP) SIGNOFF1
08/07/2023220717678Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/19/2019220645915Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
03/27/2023220717678Open ↗
11/20/2019220717678Open ↗
10/21/2019220717678Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms13
▸BISEFILING COVER SHEET5
10/21/2019220717678Open ↗
04/03/2018220645915Open ↗
04/27/2012220140835Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION4
11/03/2023220717678Open ↗
11/03/2023220717678Open ↗
04/10/2023220717678Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
02/19/2019220645915Open ↗
02/14/2018220105589Open ↗
11/17/2017220105589Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/26/2019240252837Open ↗