← Back
Hospital, sanitarium, mental institution
NH Forest Hills Hospital Campus
102-01 66 ROAD · BIN 4051250
💬 Discuss this project
1953Year Built
10Stories
I1Building Class
R7-1Zoning
289,415 sfGross Floor Area
1Units
LL97 Covered7 Open Violations ▸FISP: SAFE
Hospital, sanitarium, mental institution · 57,996 sf lot · 4.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction14p · 8 filings · 20 docs
Floor 114p · 2 filings · 13 docs
Floor 10Under Construction13p · 3 filings · 19 docs
Floor 9Under Construction10p · 2 filings · 11 docs
Floor 8Under Construction11p · 2 filings · 11 docs
Floor 7Under Construction11p · 2 filings · 11 docs
Floor 6Under Construction4p · 2 filings · 7 docs
Floor 5Under Construction5p · 3 filings · 14 docs
Floor 4Under Construction14p · 4 filings · 17 docs
Floor 3Under Construction22p · 6 filings · 20 docs
Floor 2Under Construction14p · 5 filings · 20 docs
Floor 1Under Construction26p · 7 filings · 20 docs
CellarUnder Construction11p · 2 filings · 11 docs
BasementUnder Construction6p · 3 filings · 18 docs
Sub-BasementUnder Construction44p · 8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NORTHWELL HEALTH7507/08/2026
LENOX HILL HOSPITAL1707/08/2026
HIP HOSPITAL1203/22/2026
CENTRAL PARKING SYSTEM203/22/2026
NORTH SHORE LIJ HOSPITAL103/22/2026
MCFAR COUNTRACTORS INC103/22/2026
LA GUARDIA HOSPITAL403/22/2026
FOREST HILLS HOSPITAL203/22/2026
ROLST CONSTRCUTION CORP103/22/2026
NORTH SHORE LIJ HEALTH SYSTEMS8103/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
UPRIGHT EXPEDITERS5203/21/2026
A1 EXPEDITING SERVICE403/21/2026
EUROCELT EXPEDITING, INC403/21/2026
BUILDING BROTHERS803/21/2026
PATUXENT ENGINEERING203/21/2026
AE DESIGN SOLUTION403/21/2026
MERRITT ENGINEERING CONSULTANT DPC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HUNTER ROBERTS CONSTRUCTIONGeneral Contractor1007/08/2026
STARR INDUSTRIES LLCGeneral Contractor1007/08/2026
GILBANE BUILDING COMPANYGeneral Contractor906/28/2026
ISLAND ACOUSTICS LLCGeneral Contractor807/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor603/21/2026
B & A RESTORATION CONTRAGeneral Contractor407/08/2026
AMERICAN SIGN ELECL CONScaffold407/08/2026
MATCO SERVICE CORPGeneral Contractor407/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor303/21/2026
CONSIGLI CONSTRUCTION COGeneral Contractor304/09/2026
ALLIANCE PLUMBING CORPPlumbing307/08/2026
RAEL AUTOMATIC SPR.CO INCFire Protection206/28/2026
SAFWAY ATLANTIC, LLCGeneral Contractor207/08/2026
SIRINA FIRE PROT CORPFire Protection207/08/2026
PREMIER MECHANICAL SERVICGeneral Contractor107/08/2026
METROCITY GROUP,INCPlumbing107/08/2026
PACE PLUMBING CORPPlumbing107/08/2026
DIANE ELECTRIC INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CC@A ENGINEERING P.C18542010/20/2025
ALL CITY ENGINEERING PC7115210/07/2024
LEO Y LEE ASSOCIATES2481104/05/2024
OBAID MIAN849102/28/2020
Building Lifecycle
All (290)Filed (45)Permit Issued (52)Signed Off (24)Facade (FISP) (13)Violation (60)Inspection (16)Objection (50)Special Inspection (30)
08/05/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/24/2026
Permit issued — Sprinklers
Q01188855-I1-EW-SP
06/23/2026
Permit issued — General Construction
Q01188791-I1-GC
06/23/2026
Permit issued — General Construction
Q01208405-I1-GC
06/23/2026
Permit issued — General Construction
Q01202391-I1-GC
06/15/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/15/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/05/2026
Permit issued — General Construction
Q01202391-I1-GC
06/05/2026
Permit issued — General Construction
Q01208405-I1-GC
05/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/01/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/30/2026
Permit issued — General Construction
Q01188791-I1-GC
04/30/2026
Permit issued — Plumbing
Q01277009-I1-PL
03/26/2026
Filed — Alteration
TEMPORARY SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01370750-P1
03/13/2026
Permit issued — Protection and Mechanical Methods
Q01370750-S1-PMM
03/13/2026
Permit issued — Supported Scaffold
Q01370750-I1-SF
03/12/2026
Filed — Alteration
TEMPORARY SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01370750-S1
03/12/2026
Filed — Alteration
TEMPORARY SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01370750-I1
01/29/2026
Permit issued — Sprinklers
Q01277021-I1-EW-SP
01/24/2026
Permit issued — Mechanical Systems
Q01276999-I1-MS
01/24/2026
Permit issued — Structural
Q01277036-I1-ST
01/24/2026
Permit issued — General Construction
Q01276976-I1-GC
12/08/2025
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED BANNER SIGN ON WALL (NORTHWELL)
Q01198137-I1
12/08/2025
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED BANNER SIGN ON WALL (NORTHWELL)
Q01192661-I1
12/08/2025
Signed off — Alteration
Q01192671-I1
12/08/2025
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED BANNER SIGN ON WALL (NORTHWELL)
Q01173207-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/20/2025
Filed — Alteration
Q01276999-I1
10/17/2025
Filed — Alteration
Q01277036-I1
10/17/2025
Filed — Alteration
Q01277009-I1
10/17/2025
Filed — Alteration
Q01276976-I1
10/17/2025
Filed — Alteration
Q01277021-I1
10/13/2025
Special inspection requirement — Interior lighting power
CHAROULIS CHARALAMBOUS
10/13/2025
Special inspection requirement — Energy Code Compliance Inspections
CHAROULIS CHARALAMBOUS
10/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHAROULIS CHARALAMBOUS
10/13/2025
Special inspection requirement — Lighting controls
CHAROULIS CHARALAMBOUS
10/08/2025
Special inspection requirement — Duct leakage testing, insulation and design
CHAROULIS CHARALAMBOUS
10/08/2025
Special inspection requirement — Post-installed Anchors
CHAROULIS CHARALAMBOUS
10/08/2025
Special inspection requirement — Energy Code Compliance Inspections
CHAROULIS CHARALAMBOUS
10/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CHAROULIS CHARALAMBOUS
10/08/2025
Special inspection requirement — Maintenance information
CHAROULIS CHARALAMBOUS
10/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
CHAROULIS CHARALAMBOUS
10/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
CHAROULIS CHARALAMBOUS
10/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
CHAROULIS CHARALAMBOUS
09/03/2025
Permit issued — Sign
Q01198137-I1-SG
09/03/2025
Permit issued — Sign
Q01192671-I1-SG
09/03/2025
Permit issued — Sign
Q01192661-I1-SG
09/03/2025
Permit issued — Sign
Q01173207-I1-SG
08/25/2025
Special inspection requirement — Final
CHAROULIS CHARALAMBOUS
08/25/2025
Special inspection requirement — Sprinkler Systems
CHAROULIS CHARALAMBOUS
08/25/2025
Special inspection requirement — Mechanical Systems
CHAROULIS CHARALAMBOUS
08/25/2025
Special inspection requirement — Final
CHAROULIS CHARALAMBOUS
06/03/2025
Permit issued — General Construction
Q01208405-I1-GC
06/03/2025
Permit issued — General Construction
Q01202391-I1-GC
05/28/2025
Objection resolved — Addressed
05/28/2025
Objection resolved — Addressed
05/28/2025
Objection resolved — Addressed
Latest 60 of 290 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC06/24/2026
DOB NOWGeneral ConstructionPermit IssuedGILBANE BUILDING COMPANY06/23/2026
DOB NOWGeneral ConstructionPermit IssuedGILBANE BUILDING COMPANY06/23/2026
DOB NOWGeneral ConstructionPermit IssuedGILBANE BUILDING COMPANY06/23/2026
DOB NOWGeneral ConstructionPermit IssuedGILBANE BUILDING COMPANY06/05/2026
DOB NOWGeneral ConstructionPermit IssuedGILBANE BUILDING COMPANY06/05/2026
DOB NOWGeneral ConstructionPermit IssuedGILBANE BUILDING COMPANY04/30/2026
DOB NOWPlumbingPermit IssuedALLIANCE PLUMBING CORP04/30/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC03/13/2026
DOB NOWSupported ScaffoldPermit IssuedSAFWAY ATLANTIC, LLC03/13/2026
DOB NOWSprinklersPermit IssuedSIRINA FIRE PROT CORP01/29/2026
DOB NOWMechanical SystemsPermit IssuedCONSIGLI CONSTRUCTION CO01/24/2026
DOB NOWStructuralPermit IssuedCONSIGLI CONSTRUCTION CO01/24/2026
DOB NOWGeneral ConstructionPermit IssuedCONSIGLI CONSTRUCTION CO01/24/2026
DOB NOWSignSigned-offAMERICAN SIGN & ELECL CON09/03/2025
DOB NOWSignSigned-offAMERICAN SIGN & ELECL CON09/03/2025
DOB NOWSignSigned-offAMERICAN SIGN & ELECL CON09/03/2025
DOB NOWSignSigned-offAMERICAN SIGN & ELECL CON09/03/2025
DOB NOWGeneral ConstructionPermit IssuedGILBANE BUILDING COMPANY06/03/2025
DOB NOWGeneral ConstructionPermit IssuedGILBANE BUILDING COMPANY06/03/2025
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC05/22/2025
DOB NOWGeneral ConstructionPermit IssuedGILBANE BUILDING COMPANY04/30/2025
DOB NOWStructuralSigned-offISLAND ACOUSTICS LLC12/13/2024
DOB NOWMechanical SystemsPermit IssuedMATCO SERVICE CORP11/14/2024
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE08/20/2024
DOB NOWSupported ScaffoldPermit IssuedB & A RESTORATION CONTRA08/13/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC08/13/2024
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE07/31/2024
DOB NOWPlumbingSigned-offSIRINA FIRE PROT CORP07/26/2024
DOB NOWStructuralSigned-offISLAND ACOUSTICS LLC06/21/2024
DOB NOWMechanical SystemsSigned-offISLAND ACOUSTICS LLC06/21/2024
DOB NOWGeneral ConstructionSigned-offISLAND ACOUSTICS LLC06/21/2024
DOB NOWSuspended ScaffoldSigned-offB&A RESTORATION CONTR.INC05/03/2024
DOB NOWGeneral ConstructionSigned-offB & A RESTORATION CONTRA03/11/2024
DOB NOWMechanical SystemsSigned-offPREMIER MECHANICAL SERVIC11/16/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC10/30/2023
DOB NOWSupported ScaffoldSigned-offSTARR INDUSTRIES LLC10/23/2023
DOB NOWProtection and Mechanical MethodsSigned-offSTARR INDUSTRIES LLC10/23/2023
DOB NOWMechanical SystemsSigned-offHUNTER ROBERTS CONSTRUCTION10/19/2023
DOB NOWStructuralSigned-offHUNTER ROBERTS CONSTRUCTION10/19/2023
+ 60 more permits on file
3 projects · most recent 04/18/2025
FiledStatusContractorScope
04/18/2025——360 heads
04/18/2025——93 heads
03/24/2025Permit IssuedRAEL AUTOMATIC SPR.CO INC271 heads
14 projects · most recent 09/09/2026
General Wiring Lighting
FiledStatusContractorScope
09/09/2026Permit IssuedALLAN BRITEWAY ELECTRICALGeneral Wiring
08/19/2026CompleteHATZEL AND BUEHLER, INCGeneral Wiring
12/11/2024CompleteDIANE ELECTRIC INC.General Wiring
08/23/2024CompleteBOROWIDE ELECT'L CONTR'S—
05/06/2024CompleteUNITY ELECTRIC CO. INCGeneral Wiring
10/24/2023CompleteBOROWIDE ELECT'L CONTR'S—
06/07/2021CompleteELEMCO SERVICES INC DBA—
04/27/2021CompleteH. & L. ELECTRIC INCGeneral Wiring
12/02/2020Complete5 J'S ELECTL CONTS CORP—
12/24/2019CompleteDIANE ELECTRIC INC.General Wiring
11/11/2019CompleteRIGID ELECTRIC, INC.General Wiring, Lighting
09/20/2019CompleteDIANE ELECTRIC INC.General Wiring
09/10/2018Permit IssuedNEE ELECTRICAL, LLCGeneral Wiring
05/29/2018CompleteCOMMERCIAL ELECT CONT INCGeneral Wiring, Lighting
1 project · most recent 03/26/2026
FiledStatusContractorScope
03/26/2026Permit IssuedSAFWAY ATLANTIC, LLC1 scope_items
1 project · most recent 08/12/2024
Scaffold
FiledStatusContractorScope
08/12/2024Permit IssuedB & A RESTORATION CONTRAScaffold
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
08/05/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/15/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/15/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/05/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/01/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/27/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/23/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/23/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/10/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/10/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/26/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/24/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/13/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
10/13/2025Lighting controlsCHAROULIS CHARALAMBOUSenergy_progress
10/13/2025Fire-Resistant Penetrations and JointsCHAROULIS CHARALAMBOUSspecial
10/13/2025Energy Code Compliance InspectionsCHAROULIS CHARALAMBOUSprogress
10/13/2025Interior lighting powerCHAROULIS CHARALAMBOUSenergy_progress
10/08/2025HVAC-R and service water heating system controlsCHAROULIS CHARALAMBOUSenergy_progress
10/08/2025Fire-Resistance Rated ConstructionCHAROULIS CHARALAMBOUSprogress
10/08/2025Maintenance informationCHAROULIS CHARALAMBOUSenergy_progress
10/08/2025Energy Code Compliance InspectionsCHAROULIS CHARALAMBOUSprogress
10/08/2025HVAC-R and service water heating equipmentCHAROULIS CHARALAMBOUSenergy_progress
10/08/2025Duct leakage testing, insulation and designCHAROULIS CHARALAMBOUSenergy_progress
10/08/2025HVAC-R and service water piping design and insulationCHAROULIS CHARALAMBOUSenergy_progress
10/08/2025Post-installed AnchorsCHAROULIS CHARALAMBOUSspecial
08/25/2025FinalCHAROULIS CHARALAMBOUSprogress
08/25/2025Mechanical SystemsCHAROULIS CHARALAMBOUSspecial
08/25/2025FinalCHAROULIS CHARALAMBOUSprogress
08/25/2025Sprinkler SystemsCHAROULIS CHARALAMBOUSspecial
05/22/2025Fire-Resistant Penetrations and JointsCHAROULIS CHARALAMBOUSspecial
05/22/2025Post-installed AnchorsCHAROULIS CHARALAMBOUSspecial
03/28/2025Sprinkler SystemsCHAROULIS CHARALAMBOUSspecial
03/20/2025FinalLEON SKVIRSKYprogress
03/12/2025Post-installed AnchorsCHAROULIS CHARALAMBOUSspecial
03/12/2025Fire-Resistant Penetrations and JointsCHAROULIS CHARALAMBOUSspecial
03/10/2025FinalLEON SKVIRSKYprogress
03/03/2025Sprinkler SystemsCHAROULIS CHARALAMBOUSspecial
01/31/2025Interior lighting powerCHAROULIS CHARALAMBOUSenergy_progress
Latest 25 of 71.
▾Documents — 1,030 on file (BIS + DOB NOW)
▸Plans & Drawings45
▸DOB NOWPlans/Sketch43
08/27/2026Q00486863-I1Request digital key ↗
08/27/2026Q00487974-I1Request digital key ↗
08/27/2026Q00487974-P1Request digital key ↗
Showing 3 of 43 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/27/2026Q00432939-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026Q00220468-I1Request digital key ↗
▸Applications & Permits172
▸BISWORK PERMIT APPLICATION89
01/15/2021421737473Open ↗
08/22/2019421732389Open ↗
08/10/2019421648462Open ↗
Showing 3 of 89 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION82
04/24/2020421648462Open ↗
02/03/2020421648462Open ↗
08/01/2019421737473Open ↗
Showing 3 of 82 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1131
04/24/2020421648462Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISTAX LOT: FINAL LOT NUMBER ISSUED6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Seals & Professional Certifications263
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION120
03/14/2020421648462Open ↗
01/23/2020421732389Open ↗
01/13/2020421896372Open ↗
Showing 3 of 120 on file for this type
▸DOB NOWProgress Inspector Seal & Signature48
09/07/2026Q00779833-I1Open ↗
09/07/2026Q00779833-I1Open ↗
09/07/2026Q00779833-I1Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature44
08/28/2026Q00220468-I1Open ↗
08/27/2026Q00486863-I1Open ↗
08/27/2026Q00487974-P1Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/07/2026Q00779833-I1Open ↗
09/01/2026Q01277021-I1Open ↗
09/01/2026Q00220468-I1Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISProfessional and Owner Certification (POC3)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment88
▸BISEQUIPMENT USE PERMITS25
03/01/2018421393771Open ↗
Showing 1 of 25 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT17
03/01/2018421393771Open ↗
03/01/2018421393771Open ↗
03/01/2018421393771Open ↗
Showing 3 of 17 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE13
02/03/2020421648462Open ↗
07/20/2019421732389Open ↗
04/23/2019421896372Open ↗
Showing 3 of 13 on file for this type
▸BISSELF-CERT PLUMBING NOTICE11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA9
06/29/2020421649586Open ↗
06/25/2020421896407Open ↗
04/04/2019421569975Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSPRINKLER INSP REPORT : FP-855
08/14/2019421732389Open ↗
Showing 1 of 5 on file for this type
▸Environmental & Asbestos73
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
08/28/2026Q00220468-I1Open ↗
08/27/2026Q00486863-I1Open ↗
08/27/2026Q00487974-P1Open ↗
Showing 3 of 22 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)21
08/22/2019421732389Open ↗
04/22/2019421569975Open ↗
02/01/2019421648462Open ↗
Showing 3 of 21 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
08/22/2026Q01014333-I1Open ↗
08/22/2026Q01011444-I1Open ↗
08/21/2026Q01012737-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
12/22/2020421737473Open ↗
06/29/2020421649586Open ↗
06/25/2020421896407Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
05/24/2019421896372Open ↗
▸BISDEP ASBESTOS PROJECT CONDITIONAL COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance72
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS41
03/14/2020421648462Open ↗
01/13/2020421896372Open ↗
08/01/2019421737473Open ↗
Showing 3 of 41 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS16
03/14/2020421648462Open ↗
01/13/2020421896372Open ↗
03/20/2019421393780Open ↗
Showing 3 of 16 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/06/2021421737473Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00486863-I1Open ↗
Showing 1 of 2 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/22/2020421737473Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/06/2021421737473Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
12/09/2020421737473Open ↗
10/14/2020421737473Open ↗
Showing 2 of 4 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
12/28/2020421737473Open ↗
▸Approvals, Objections & Sign-offs136
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter40
08/22/2026Q01011444-I1Open ↗
08/21/2026Q01093334-I1Open ↗
08/20/2026Q01202391-I1Open ↗
Showing 3 of 40 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST36
05/06/2021421737473Open ↗
07/07/2020421732389Open ↗
06/29/2020421649586Open ↗
Showing 3 of 36 on file for this type
▸BISADMINISTRATIVE OBJECTIONS29
01/05/2018421588035Open ↗
11/29/2017421569975Open ↗
Showing 2 of 29 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION25
08/02/2019421737473Open ↗
07/20/2019421732389Open ↗
04/23/2019421896372Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDEP Variance (V5) letter4
08/13/2026Q00780464-I1Open ↗
08/13/2026Q00779833-I1Open ↗
Showing 2 of 4 on file for this type
▸BISFINAL2
05/06/2021421737473Open ↗
07/07/2020421732389Open ↗
▸Cost, Insurance & Ownership77
▸BISCOST AFFIDAVIT71
03/14/2020421648462Open ↗
01/13/2020421896372Open ↗
08/01/2019421737473Open ↗
Showing 3 of 71 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
05/06/2021421737473Open ↗
07/07/2020421732389Open ↗
06/29/2020421649586Open ↗
Showing 3 of 4 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms86
▸BISEFILING COVER SHEET62
08/01/2019421737473Open ↗
07/20/2019421732389Open ↗
04/19/2019421896372Open ↗
Showing 3 of 62 on file for this type
▸BISADDITIONAL INFORMATION13
12/09/2020421737473Open ↗
07/20/2019421648462Open ↗
07/20/2019421648462Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM9
04/24/2020421648462Open ↗
05/11/2018421408514Open ↗
04/25/2018421073581Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
01/15/2021421737473Open ↗
10/14/2020421737473Open ↗
07/07/2020421732389Open ↗
▸BISALTERNATIVE MATERIALS - OTCR BUILDINGS BULLETIN1
05/06/2021421737473Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
08/13/2026Q01029971-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026Q01029971-I1Open ↗