ECB07/01/2025FAILURE TO COMPLY AND CERTIFY CERTIFICATE OF CORRECTION FOR VIOLATION # 39137839X, COMPLY WITH COMMISSIONER'S ORDER$3K due
ECB02/07/2025WORK WITHOUT A PERMIT. NOTED: AT TIME OF INSPECTION, OBSERVED 2ND FLOOR ADDITION ERECTED APPROX. 48FT W X 13FT L X 14FT H WITH WINDOWS, ALSO AT 1ST FLOOR CUT OPEN WALL TO CREATE ENTRY DOOR TO 2ND FLOOR. NO APPL$3K due
ECB08/16/2024UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. NOTED: AT TIME OF INSPECTION OBSERVED WORK CONTINUE AGAINST STOP WORK ORDER ISSUED UNDER COMPLAIN #4950321 CONSTRUCTION WORK IS 100% COMPLETE. REM$5K due
ECB02/18/2024WORK WITHOUT PERMIT(S) - ENTIRE ROOF-TOP / 2ND FLOOR ADDITION WITH NO RECORDS OF FILING / PERMIT(S) WOOD FRAMED STRUCTURE 80% COMPLETED WITH NO ROOF COVERING - PARTIAL STOP WORK ORDER ISSUED, OBTAIN PERMIT$12K due
ECB02/07/2025WORK WITHOUT A PERMIT. NOTED: AT 2ND FLOOR INSTALLED ELECTRICAL WIRING FOR LIGHTS, SWITCHES, & OUTLETS. ALSO OBSERVED ELECTRICAL WIRING INSTALLED FOR 2 MOUNTED A/C COMPRESSORS & DISCONNECT SWITCH. NO APPLICATIOHearing held — result not yet published$1K proposed
ECB03/09/2007USE OR INSTALLATION OF PLUMBING MATERIALS OR EQUIPMENT WHICH DO NOT COMLPY W/ RS-16. PVC DRAIN LINES INSTALLED IN BARBER SHOP. ALSO UNION INSTALLED ON GAS LINES BEFORE GAS VALVE IN CELLAR. REMEDY: REMOVE NONNothing owed — awaiting certificate of correction