Two family frame
102-11 164 AVENUE
QUEENS · BIN 4623625
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3AZoning
1,924 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 3,360 sf lot · 0.57 FAR built · Flood zone AE
Locations of Work
ArchitecturePlumbingCivil
Roof1p · 1 filing · 19 docs
Floor 238p · 2 filings · 20 docs
Floor 139p · 2 filings · 20 docs
Basement37p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FAZS BUILDER103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/01/2023$820K—LIBERTY INSPECTION CORP. → Private party$426/sf unit
09/04/2020$86K—— → —$45/sf unit
09/04/2020$135K—Private party → LIBERTY INSPECTION CORP$70/sf unit
05/10/2019$362K—— → —$188/sf unit
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHOK ARCHITECTURE DESIGN, PL/1208/30/2023
KNF SERVICES CROP110/23/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYCMC CORPGeneral Contractor607/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASHOK ARCHITECTURE DESIGN60271108/30/2023
Building Lifecycle
All (137)Filed (13)Permit Issued (5)Signed Off (3)Inspection (14)Objection (72)Special Inspection (30)
09/18/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/11/2023
Objection resolved — Addressed
09/08/2023
Objection raised — Scope
08/30/2023
Filed — New Building
NEW BUILDING, 2 FAMILY, 2 STORY FRAMEWITH FULL BASEMENT. 8'-0" WIDE SIDE LOT RIBBON WITH TWO ACCESSORY OFF STREET PARKING SPACES AND NEW CURB CUT.
Q00490608-P7
07/24/2023
Filed — New Building
NEW BUILDING, 2 FAMILY, 2 STORY FRAMEWITH FULL BASEMENT. 8'-0" WIDE SIDE LOT RIBBON WITH TWO ACCESSORY OFF STREET PARKING SPACES AND NEW CURB CUT.
Q00490608-P6
07/21/2023
Special inspection requirement — Fire-Resistance Rated Construction
Ashish Patel
07/21/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Ashish Patel
07/21/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Ashish Patel
07/21/2023
Special inspection requirement — Fenestration areas
Ashish Patel
07/21/2023
Special inspection requirement — Energy Code Compliance Inspections
Ashish Patel
07/21/2023
Special inspection requirement — Fenestration air leakage
Ashish Patel
07/21/2023
Special inspection requirement — Concrete - Cast-In-Place
Ashish Patel
07/21/2023
Special inspection requirement — Insulation placement and R values
Ashish Patel
07/21/2023
Special inspection requirement — Interior lighting power
Ashish Patel
07/21/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Ashish Patel
07/21/2023
Special inspection requirement — Lowest Floor Elevation
Ashish Patel
07/21/2023
Special inspection requirement — Lighting in dwelling units
Ashish Patel
07/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ashish Patel
07/21/2023
Special inspection requirement — Masonry
Ashish Patel
03/27/2023
Filed — New Building
NEW BUILDING, 2 FAMILY, 2 STORY FRAMEWITH FULL BASEMENT. 8'-0" WIDE SIDE LOT RIBBON WITH TWO ACCESSORY OFF STREET PARKING SPACES AND NEW CURB CUT.
Q00490608-P5
03/24/2023
Special inspection requirement — Fire-Resistance Rated Construction
Ashish Patel
03/24/2023
Special inspection requirement — Interior lighting power
Ashish Patel
03/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ashish Patel
03/24/2023
Special inspection requirement — Fenestration air leakage
Ashish Patel
03/24/2023
Special inspection requirement — Energy Code Compliance Inspections
Ashish Patel
03/24/2023
Special inspection requirement — Lighting in dwelling units
Ashish Patel
03/24/2023
Special inspection requirement — Concrete - Cast-In-Place
Ashish Patel
03/24/2023
Special inspection requirement — Insulation placement and R values
Ashish Patel
03/24/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Ashish Patel
03/24/2023
Special inspection requirement — Fenestration areas
Ashish Patel
03/24/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Ashish Patel
03/24/2023
Special inspection requirement — Masonry
Ashish Patel
03/24/2023
Special inspection requirement — Lowest Floor Elevation
Ashish Patel
03/24/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Ashish Patel
02/08/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/31/2023
Objection raised — Scope
01/31/2023
Objection resolved — Addressed
01/30/2023
Filed — New Building
NEW BUILDING, 2 FAMILY, 2 STORY FRAMEWITH FULL BASEMENT. 8'-0" WIDE SIDE LOT RIBBON WITH TWO ACCESSORY OFF STREET PARKING SPACES AND NEW CURB CUT.
Q00490608-P4
01/29/2023
Special inspection requirement — Concrete - Cast-In-Place
Ashish Patel
01/29/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Ashish Patel
01/26/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/24/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/18/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/06/2023
Signed off — Alteration
NB House for Two Family - Plumbing Work Type for Residential 3 Piece Bathrooms, Kitchen Sinks and a Boiler Room with 2 Boilers and 2 How Water Heaters.
Q00522145-I1
12/14/2022
Signed off — Alteration
Curb Cut
Q00549426-I1
12/12/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/06/2022
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
12/01/2022
Filed — New Building
NEW BUILDING, 2 FAMILY, 2 STORY FRAMEWITH FULL BASEMENT. 8'-0" WIDE SIDE LOT RIBBON WITH TWO ACCESSORY OFF STREET PARKING SPACES AND NEW CURB CUT.
Q00490608-P3
12/01/2022
Permit issued — Curb Cut
Q00549426-I1-CC
11/16/2022
Objection resolved — Addressed
11/14/2022
Filed — Alteration
Curb Cut
Q00549426-I1
11/07/2022
Objection raised — Scope
11/04/2022
Filed — Alteration
NB House for Two Family - Plumbing Work Type for Residential 3 Piece Bathrooms, Kitchen Sinks and a Boiler Room with 2 Boilers and 2 How Water Heaters.
Q00522145-P2
11/03/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/25/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/14/2022
Permit issued — General Construction
Q00490608-I1-GC
10/13/2022
Objection resolved — Addressed
10/05/2022
Objection raised — Scope
09/30/2022
Filed — Alteration
NB House for Two Family - Plumbing Work Type for Residential 3 Piece Bathrooms, Kitchen Sinks and a Boiler Room with 2 Boilers and 2 How Water Heaters.
Q00522145-P1
09/29/2022
Signed off — Alteration
Q00617521-I1
Latest 60 of 137 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offNYCMC CORP12/01/2022
DOB NOWGeneral ConstructionPermit IssuedNYCMC CORP10/14/2022
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR05/20/2022
DOB NOWGeneral ConstructionPermit IssuedNYCMC CORP11/08/2021
DOB NOWConstruction FenceSigned-offNYCMC CORP10/25/2021
1 project · most recent 08/01/2022
General Wiring Lighting
FiledStatusContractorScope
08/01/2022CompleteSAFEWAY CONSTRUCTION, INCGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
09/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/08/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/26/2023Fail-Final CND-Occupancy InspectionFailView ↗
01/24/2023Fail-Final CND-Occupancy InspectionFailView ↗
01/18/2023Fail-Final CND-Occupancy InspectionFailView ↗
12/12/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
12/06/2022Fail-Final Curb Cut Non-Directive 14FailView ↗
11/03/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/25/2022Pass-Final CND-Occupancy InspectionPassView ↗
06/07/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/07/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/07/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/07/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/07/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 82
DateRequirementInspectorRole
07/21/2023Insulation placement and R valuesAshish Patelenergy_progress
07/21/2023Fenestration areasAshish Patelenergy_progress
07/21/2023Interior lighting powerAshish Patelenergy_progress
07/21/2023Fenestration and door U-factor and product ratingsAshish Patelenergy_progress
07/21/2023Fenestration air leakageAshish Patelenergy_progress
07/21/2023Lighting in dwelling unitsAshish Patelenergy_progress
07/21/2023Lowest Floor ElevationAshish Patelprogress
07/21/2023Fire-Resistance Rated ConstructionAshish Patelprogress
07/21/2023Energy Code Compliance InspectionsAshish Patelprogress
07/21/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationAshish Patelspecial
07/21/2023MasonryAshish Patelspecial
07/21/2023Fire-Resistant Penetrations and JointsAshish Patelspecial
07/21/2023Excavations - Sheeting, Shoring, and BracingAshish Patelspecial
07/21/2023Concrete - Cast-In-PlaceAshish Patelspecial
03/24/2023Concrete - Cast-In-PlaceAshish Patelspecial
03/24/2023Excavations - Sheeting, Shoring, and BracingAshish Patelspecial
03/24/2023Fire-Resistant Penetrations and JointsAshish Patelspecial
03/24/2023MasonryAshish Patelspecial
03/24/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationAshish Patelspecial
03/24/2023Energy Code Compliance InspectionsAshish Patelprogress
03/24/2023Fire-Resistance Rated ConstructionAshish Patelprogress
03/24/2023Lowest Floor ElevationAshish Patelprogress
03/24/2023Fenestration and door U-factor and product ratingsAshish Patelenergy_progress
03/24/2023Fenestration areasAshish Patelenergy_progress
03/24/2023Insulation placement and R valuesAshish Patelenergy_progress
Latest 25 of 82.
▾Documents — 167 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/27/2026Q00522145-I1Request digital key ↗
08/27/2026Q00617521-I1Request digital key ↗
08/25/2026Q00549426-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION3
11/23/2022440680675Open ↗
11/01/2022440680675Open ↗
08/05/2021440680675Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram8
08/14/2026Q00490608-I1Open ↗
08/13/2026Q00490608-P3Open ↗
08/13/2026Q00490608-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026Q00490608-I1Open ↗
▸Seals & Professional Certifications97
▸DOB NOWProgress Inspector Seal & Signature55
09/18/2026Q00522145-P1Open ↗
09/18/2026Q00522145-P1Open ↗
09/18/2026Q00522145-P1Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
09/18/2026Q00522145-P1Open ↗
09/01/2026Q00490608-P4Open ↗
09/01/2026Q00490608-P4Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/27/2026Q00522145-I1Open ↗
08/27/2026Q00522145-P1Open ↗
08/27/2026Q00522145-P2Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/05/2021440680675Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/05/2021440680675Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)8
08/14/2026Q00490608-I1Open ↗
08/13/2026Q00490608-P7Open ↗
08/13/2026Q00490608-P5Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection13
▸DOB NOWStreet Tree Checklist8
08/24/2026Q00490608-P5Open ↗
08/24/2026Q00490608-P6Open ↗
08/24/2026Q00490608-P3Open ↗
Showing 3 of 8 on file for this type
▸BISSTREET TREE CHECKLIST1
11/01/2022440680675Open ↗
▸BISSTREET TREE SIGNOFF1
10/29/2022440680675Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/14/2026Q00490608-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/14/2026Q00490608-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/14/2026Q00490608-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/14/2026Q00490608-I1Open ↗
08/13/2026Q00522145-I1Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
12/08/2022440680675Open ↗
11/01/2022440680675Open ↗
12/13/2021440680675Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/05/2021440680675Open ↗
▸Other Documents18
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone8
08/14/2026Q00490608-I1Open ↗
08/13/2026Q00490608-P2Open ↗
08/13/2026Q00490608-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSite Survey: Initial7
08/14/2026Q00490608-I1Open ↗
08/13/2026Q00490608-P4Open ↗
08/13/2026Q00490608-P3Open ↗
Showing 3 of 7 on file for this type
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
11/24/2021440680675Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/14/2026Q00490608-I1Open ↗
▸DOB NOWFinal Survey1
08/14/2026Q00490608-I1Open ↗