5 Open Violations 4 unresolved · 1 paperwork only▸
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB03/19/2003V-DOB VIOLATION - ACTIVE
ECB10/17/2018WORK WITHOUT A PERMIT.NOTED:@ FRONT OF BUILDING @RIGHT SIDE INSTALLED 8'CURB CUT WITHOUT PERMIT.REMEDY: OBTAIN PERMITNothing owed — awaiting certificate of correction
Church, synagogue, chapel · 15,000 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.