← Back
Large suburban residence
102-17 72 AVENUE
QUEENS · BIN 4077754
💬 Discuss this project
1925Year Built
2.5Stories
A3Building Class
R2Zoning
3,114 sfGross Floor Area
1Units
Large suburban residence · 6,000 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Roof4p · 1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
UNISOLAR208/20/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTURION SOLAR ENERGYGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURION SOLAR ENERGY LL9475208/20/2025
Building Lifecycle
All (9)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (5)
09/23/2025
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
Q01235784-I1
08/20/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
Q01235784-P1
08/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andres Arias Londono
08/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Andres Arias Londono
08/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Andres Arias Londono
08/19/2025
Special inspection requirement — Final
Andres Arias Londono
08/19/2025
Special inspection requirement — Air barrier - visual inspection
Andres Arias Londono
06/20/2025
Permit issued — Solar
Q01235784-I1-SL
06/03/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
Q01235784-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offCENTURION SOLAR ENERGY06/20/2025
2 projects · most recent 06/11/2025
FiledStatusContractorScope
06/11/2025CompleteBERGER QUALITY ELEC'L CON1 meters
06/02/2025CompleteBERGER QUALITY ELEC'L CON—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/19/2025Fire-Resistant Penetrations and JointsAndres Arias Londonospecial
08/19/2025Structural Stability – Alterations of existing buildingsAndres Arias Londonospecial
08/19/2025Energy Code Compliance InspectionsAndres Arias Londonoprogress
08/19/2025FinalAndres Arias Londonoprogress
08/19/2025Air barrier - visual inspectionAndres Arias Londonoenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026Q01235784-I1Request digital key ↗
08/19/2026Q01235784-P1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026Q01235784-I1Open ↗
08/13/2026Q01235784-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026Q01235784-P1Open ↗
08/23/2026Q01235784-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q01235784-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026Q01235784-I1Open ↗
08/13/2026Q01235784-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01235784-I1Open ↗