← Back
Two stories - detached, small or mid-size
102-24 VAN WYCK EXPRESSWAY
QUEENS · BIN 4201263
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R5Zoning
1,280 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,280 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
Structural
Permit Issued — active, not yet Signed-off
Floor 2Under Construction1 filing · 17 docs
Floor 1Under Construction1 filing · 17 docs
CellarUnder Construction1 filing · 17 docs
1 job · most recent 07/24/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/24/2026——Gas, Water/Sanitary
1 job · most recent 09/09/2026
General Wiring
FiledStatusContractorScope
09/09/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
1 job · most recent 07/24/2026
Wood
FiledStatusContractorScope
07/24/2026Permit IssuedYAFE MEOD CORPWood
Building Lifecycle
All (82)Filed (3)Permit Issued (2)Violation (1)Objection (55)Special Inspection (21)
09/23/2026
Permit issued — Foundation
Q01132699-I1-GC-CX
08/17/2026
Objection raised — Other
08/17/2026
Objection resolved — Addressed
08/05/2026
Objection raised — Scope
07/24/2026
Filed — Alteration CO
Plumbing Fixtures for Two Family dwelling. Propose 2pc bath(toilet, sink) at Cel. Direct replacement of gas stove, propose 3pc bath(toilet, lav, shower) on 1st Fl. Addition of gas stove & direct replacement of 3pc bath (toilet, lav, shower) on 2 Floor.
Q01132699-S1
04/16/2026
Objection resolved — Addressed
01/16/2026
Special inspection requirement — Fenestration areas
01/16/2026
Special inspection requirement — Maintenance information
01/16/2026
Special inspection requirement — Fenestration air leakage
01/16/2026
Special inspection requirement — Electric vehicle service equipment requirements
01/16/2026
Special inspection requirement — Metering
01/16/2026
Special inspection requirement — Protection of exposed foundation insulation
10/22/2025
Objection raised — Other
10/10/2025
Objection resolved — Addressed
10/10/2025
Objection resolved — Addressed
10/10/2025
Objection resolved — Addressed
10/10/2025
Objection resolved — Addressed
09/22/2025
Objection resolved — Addressed
09/22/2025
Objection resolved — Addressed
09/22/2025
Objection resolved — Addressed
09/22/2025
Objection resolved — Addressed
09/22/2025
Objection resolved — Addressed
09/22/2025
Objection resolved — Addressed
09/22/2025
Objection resolved — Addressed
09/22/2025
Objection resolved — Addressed
09/22/2025
Objection resolved — Addressed
09/22/2025
Objection resolved — Addressed
09/15/2025
Objection raised — Other
08/15/2025
Objection resolved — Addressed
08/15/2025
Objection resolved — Addressed
08/15/2025
Objection resolved — Addressed
08/14/2025
Objection raised — Other
08/05/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
08/05/2025
Special inspection requirement — Energy Code Compliance Inspections
08/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
08/05/2025
Special inspection requirement — Structural Wood Frame
08/05/2025
Special inspection requirement — Interior lighting power
08/05/2025
Special inspection requirement — Insulation placement and R values
08/05/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
08/05/2025
Special inspection requirement — Concrete - Cast-In-Place
08/05/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
08/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/05/2025
Special inspection requirement — Masonry
08/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/05/2025
Special inspection requirement — Subgrade Inspections
07/30/2025
Objection resolved — Addressed
07/16/2025
Objection resolved — Addressed
07/16/2025
Objection resolved — Addressed
07/16/2025
Objection resolved — Addressed
07/16/2025
Objection resolved — Addressed
07/16/2025
Objection resolved — Addressed
07/16/2025
Objection resolved — Addressed
07/16/2025
Objection resolved — Addressed
06/02/2025
Objection raised — Other
06/02/2025
Objection raised — Other
06/02/2025
Objection raised — Other
06/02/2025
Objection raised — Other
05/29/2025
Objection raised — Other
05/29/2025
Objection raised — Other
05/29/2025
Objection raised — Other
Latest 60 of 82 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/25/2024$590K—Private party → Private party$461/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AA BLDG & INSP SVC LLC207/24/2026
SELF EMPLOYED109/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JOTAKA MODERN HOME RENOVATIONS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOHN EVAN CONTRACTING CORGeneral Contractor107/08/2026
YAFE MEOD CORPGeneral Contractor109/24/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedYAFE MEOD CORP09/23/2026
DOB NOWConstruction FencePermit IssuedJOHN EVAN CONTRACTING COR09/27/2024
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
01/16/2026Fenestration areas—energy_progress
01/16/2026Maintenance information—energy_progress
01/16/2026Fenestration air leakage—energy_progress
01/16/2026Electric vehicle service equipment requirements—energy_progress
01/16/2026Metering—energy_progress
01/16/2026Protection of exposed foundation insulation—energy_progress
08/05/2025Subsurface Investigations (Borings/Test Pits)—special
08/05/2025Energy Code Compliance Inspections—progress
08/05/2025Fire-Resistance Rated Construction—progress
08/05/2025Structural Wood Frame—progress
08/05/2025Interior lighting power—energy_progress
08/05/2025Insulation placement and R values—energy_progress
08/05/2025Fenestration and door U-factor and product ratings—energy_progress
08/05/2025Concrete - Cast-In-Place—special
08/05/2025Exterior Insulation and Finish Systems (EIFS)—special
08/05/2025Fire-Resistant Penetrations and Joints—special
08/05/2025Masonry—special
08/05/2025Structural Stability – Alterations of existing buildings—special
08/05/2025Subgrade Inspections—special
10/25/2024Footing and Foundation—progress
10/25/2024Final—progress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026Q01113317-I1Request digital key ↗
08/20/2026Q01132699-S1Request digital key ↗
08/14/2026Q01132699-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026Q01132699-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026Q01132699-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026Q01113317-I1Open ↗
08/20/2026Q01132699-I1Open ↗
08/20/2026Q01132699-S1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/14/2026Q01132699-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/14/2026Q01132699-S1Open ↗
08/14/2026Q01132699-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Test Report and Plot Diagram1
08/14/2026Q01132699-I1Open ↗
▸DOB NOWSOIL REPORT1
08/14/2026Q01132699-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/14/2026Q01132699-I1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification1
08/14/2026Q01132699-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/14/2026Q01132699-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026Q01132699-I1Open ↗
▸DOB NOWPlot Diagram1
08/14/2026Q01132699-I1Open ↗