← Back
Primarily 2 family with 1 store or office
102-25 JAMAICA AVENUE
QUEENS · Richmond Hill · BIN 4191677
💬 Discuss this project
1910Year Built
2Stories
S2Building Class
R6AZoning
2,250 sfGross Floor Area
3Units
6 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 2,134 sf lot · 1.05 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 210p · 2 filings · 20 docs
Floor 1
Site & exterior2p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONSTSCAPE603/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SOL SON CONTRACTOR ASSOCIATE1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
QUINTUNA SERVICE CORPGeneral Contractor303/21/2026
G GENERAL CONSTRUCTION LLGeneral Contractor107/08/2026
J & R CONTRACTORS SERVICEGeneral Contractor104/09/2026
WILLDAN ELECTRICAL OF NYElectrical103/22/2026
S.B.A. PLUMBING CORPPlumbing107/08/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
N G A CONTRACTOR INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RE ARCHITECTURE,PLLC DBA8647403/11/2025
Building Lifecycle
All (51)Filed (6)Permit Issued (6)Signed Off (2)Violation (14)Inspection (8)Objection (4)Special Inspection (11)
04/29/2026
Signed off — Alteration
INSTALL A CONDITIONER CONDENSER UNIT AT OSP AND 3 SPLIT SYSTEMS AT 2ND FLOOR LEVEL
Q00981789-I1
04/27/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/24/2026
Signed off — Alteration
REPLACE RESIDENTIAL SINK AND BATHTUB ON EXISTING ROUGHIN. RELOCATE THE TOILET AND LAVATORY ON THE 2ND FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q00981795-I1
03/16/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/13/2026
Permit issued — General Construction
Q00981789-I1-GC
12/02/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/01/2025
Permit issued — Mechanical Systems
Q00981789-S1-MS
10/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/15/2025
Permit issued — Plumbing
Q00981795-I1-PL
06/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/12/2025
Special inspection requirement — Energy Code Compliance Inspections
Roxana Escobar
06/04/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/22/2025
Inspection — Certification Failed Water and Sanitary-WS-Sanitary Piping-Roughing
Certification Failed
View inspection ↗
03/11/2025
Filed — Alteration
INSTALL A CONDITIONER CONDENSER UNIT AT OSP AND 3 SPLIT SYSTEMS AT 2ND FLOOR LEVEL
Q00981789-S1
02/25/2025
Special inspection requirement — Energy Code Compliance Inspections
Roxana Escobar
02/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roxana Escobar
02/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
Roxana Escobar
02/12/2025
Filed — Alteration
INSTALL A CONDITIONER CONDENSER UNIT AT OSP AND 3 SPLIT SYSTEMS AT 2ND FLOOR LEVEL
Q00981789-P2
12/17/2024
Special inspection requirement — Ventilation and air distribution system
Roxana Escobar
09/19/2024
Special inspection requirement — Fire-Resistance Rated Construction
Roxana Escobar
09/19/2024
Special inspection requirement — Final
Roxana Escobar
09/19/2024
Special inspection requirement — Mechanical Systems
Roxana Escobar
09/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roxana Escobar
09/19/2024
Special inspection requirement — Energy Code Compliance Inspections
Roxana Escobar
09/13/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/11/2024
Objection resolved — Addressed
08/29/2024
Objection raised — Scope
08/22/2024
Filed — Alteration
REPLACE RESIDENTIAL SINK AND BATHTUB ON EXISTING ROUGHIN. RELOCATE THE TOILET AND LAVATORY ON THE 2ND FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q00981795-P1
08/21/2024
Filed — Alteration
INSTALL A CONDITIONER CONDENSER UNIT AT OSP AND 3 SPLIT SYSTEMS AT 2ND FLOOR LEVEL
Q00981789-P1
08/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Roxana Escobar
08/01/2024
Permit issued — Plumbing
Q00981795-I1-PL
08/01/2024
Permit issued — General Construction
Q00981789-I1-GC
04/25/2024
Permit issued — General Construction
Q00981789-I1-GC
02/29/2024
Objection resolved — Addressed
01/26/2024
Objection raised — Scope
01/22/2024
Filed — Alteration
INSTALL A CONDITIONER CONDENSER UNIT AT OSP AND 3 SPLIT SYSTEMS AT 2ND FLOOR LEVEL
Q00981789-I1
01/22/2024
Filed — Alteration
REPLACE RESIDENTIAL SINK AND BATHTUB ON EXISTING ROUGHIN. RELOCATE THE TOILET AND LAVATORY ON THE 2ND FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q00981795-I1
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/15/2009
Violation issued (ECB, closed)
Construction
01/19/2007
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/13/2004
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offN G A CONTRACTOR INC02/13/2026
DOB NOWMechanical SystemsSigned-offJ & R CONTRACTORS SERVICE12/01/2025
DOB NOWPlumbingSigned-offS.B.A. PLUMBING CORP08/15/2025
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP08/01/2024
DOB NOWGeneral ConstructionSigned-offQUINTUNA SERVICE CORP08/01/2024
DOB NOWGeneral ConstructionSigned-offG GENERAL CONSTRUCTION LL04/25/2024
BISPLISSUEDTHE PLUMBING COMPANY INC09/20/2011
BISPLISSUEDTHE PLUMBING COMPANY INC07/23/2010
BISOTISSUEDBOLTECH BLDG SOLUTIONS CO11/25/2009
BISMHISSUEDALL TECHINICAL ART08/02/2004
BISOTISSUEDALL TECHNICAL ART07/27/2004
1 project · most recent 03/11/2025
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/11/2025Signed-offN G A CONTRACTOR INCAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric MXZ-SM48NAMHZ-U1 62,000 BTU · Condensing Unit ×4
Ventilation
Mitsubishi Electric PKFY-P08NLMU-E, TPKFYPO12LM140A, PKFY-PO8NLMU-E2 62,000 CFM · Vrf Indoor ×12
3 projects · most recent 10/11/2021
FiledStatusContractorScope
10/11/2021CompleteWILLDAN ELECTRICAL OF NY—
07/12/2021CompleteWILLDAN ELECTRICAL OF NY—
09/28/2020CompleteWILLDAN ELECTRICAL OF NY—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/27/2026Pass-Final General Construction Non-Directive 14PassView ↗
03/16/2026Fail-Final General Construction Non-Directive 14FailView ↗
12/02/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/22/2025Certification Failed Water and Sanitary-WS-Sanitary Piping-RoughingCertification FailedView ↗
09/13/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
06/12/2025Energy Code Compliance InspectionsRoxana Escobarprogress
02/25/2025Energy Code Compliance InspectionsRoxana Escobarprogress
02/25/2025Fire-Resistant Penetrations and JointsRoxana Escobarspecial
02/25/2025Fire-Resistance Rated ConstructionRoxana Escobarprogress
12/17/2024Ventilation and air distribution systemRoxana Escobarenergy_progress
09/19/2024Fire-Resistance Rated ConstructionRoxana Escobarprogress
09/19/2024FinalRoxana Escobarprogress
09/19/2024Mechanical SystemsRoxana Escobarspecial
09/19/2024Fire-Resistant Penetrations and JointsRoxana Escobarspecial
09/19/2024Energy Code Compliance InspectionsRoxana Escobarprogress
08/02/2024Energy Code Compliance InspectionsRoxana Escobarprogress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026Q00981795-I1Request digital key ↗
08/21/2026Q00981795-P1Request digital key ↗
08/20/2026Q00981789-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026Q00981789-I1Open ↗
09/02/2026Q00981789-I1Open ↗
08/25/2026Q00981795-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026Q00981795-I1Open ↗
08/20/2026Q00981789-S1Open ↗
08/20/2026Q00981789-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026Q00981789-I1Open ↗
08/24/2026Q00981789-P2Open ↗
08/22/2026Q00981789-S1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026Q00981795-I1Open ↗
08/20/2026Q00981789-S1Open ↗
08/20/2026Q00981789-P2Open ↗
Showing 3 of 6 on file for this type