← Back
BuildNYC
One story - permanent living quarter
102 HALES AVENUE
STATEN ISLAND · BIN 5069538
💬 Discuss this project
1955Year Built
1.5Stories
A2Building Class
R1-2Zoning
1,060 sfGross Floor Area
1Units
One story - permanent living quarter · 5,850 sf lot · 0.18 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 11 filing · 16 docs
Cellar1 filing · 16 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rogers Calvanico Group207/17/2026
Building Lifecycle
07/17/2026
Filed — Alteration CO
PROPOSED ONE STORY GARAGE ADDITION TO EXISTING ONE FAMILY RESIDENCE. PROPOSED CHANGE IN DESCRIPTION OF EXISTING SECOND FLR, 3 FIXTURE BATHROOM ON 2ND FLR. NO WORK PROPOSED ON EXISTING FIRST FLR. WORK PER PLANS
S01373833-S1
05/29/2026
Filed — Alteration CO
PROPOSED ONE STORY GARAGE ADDITION TO EXISTING ONE FAMILY RESIDENCE. PROPOSED CHANGE IN DESCRIPTION OF EXISTING SECOND FLR, 3 FIXTURE BATHROOM ON 2ND FLR. NO WORK PROPOSED ON EXISTING FIRST FLR. WORK PER PLANS
S01373833-I1
05/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
16 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 07/17/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/17/2026——Gas, Water/Sanitary
1 project · most recent 07/17/2026
Wood
FiledStatusContractorScope
07/17/2026——Wood
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
05/14/2026HVAC-R and service water heating system controls—energy_progress
05/14/2026HVAC-R and service water heating equipment—energy_progress
05/14/2026HVAC-R and service water piping design and insulation—energy_progress
03/18/2026Electric vehicle service equipment requirements—energy_progress
03/18/2026Interior lighting power—energy_progress
03/17/2026Footing and Foundation—progress
03/17/2026Energy Code Compliance Inspections—progress
03/17/2026Concrete - Cast-In-Place—special
03/17/2026Structural Wood Frame—progress
03/17/2026Fire-Resistance Rated Construction—progress
03/17/2026Fire-Resistant Penetrations and Joints—special
03/17/2026Subgrade Inspections—special
03/17/2026Subsurface Investigations (Borings/Test Pits)—special
03/17/2026Final—progress
16 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account