← Back
One family attached or semi-detached
102 LAKE AVENUE
STATEN ISLAND · Mariner's Harbor-Arlington-Graniteville · BIN 5101561
💬 Discuss this project
1990Year Built
2Stories
A5Building Class
R3AZoning
942 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 1,610 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC112/11/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272112/11/2023
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Violation (1)Special Inspection (5)
12/13/2023
Permit issued — Solar
S00971090-I1-SL
12/11/2023
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00971090-I1
12/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
12/04/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
12/04/2023
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
12/04/2023
Special inspection requirement — Final
Walid Abdulla
12/04/2023
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
01/30/1989
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC12/13/2023
1 project · most recent 12/11/2023
FiledStatusContractorScope
12/11/2023CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 12/11/2023
FiledStatusContractorScope
12/11/2023Signed-offSUNRUN INSTALLATION SVC9 panels, 3.64 kw, 190 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/04/2023Fire-Resistant Penetrations and JointsWalid Abdullaspecial
12/04/2023Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
12/04/2023Energy Code Compliance InspectionsWalid Abdullaprogress
12/04/2023FinalWalid Abdullaprogress
12/04/2023Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026S00971090-I1Open ↗
09/01/2026S00971090-I1Open ↗
09/01/2026S00971090-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026S00971090-I1Open ↗
09/01/2026S00971090-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S00971090-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S00971090-I1Open ↗