← Back
BuildNYC
Home for indigent children, aged, homeless
102 WEST 106TH STREET
MANHATTAN · BIN 1081581
💬 Discuss this project
1967Year Built
8Stories
N2Building Class
R8AZoning
216,559 sfGross Floor Area
1Units
LL97 Covered11 Active Violations 1 unresolved · 10 paperwork only 2 old, status unconfirmed ▸
Home for indigent children, aged, homeless · Owner of record: 156 West 106th Street Holding · 79,125 sf lot · 2.74 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofThe New Jewish Home7p · 1 filing · 20 docs
Floor 5The New Jewish Home1 filing · 3 docs
Floor 4The New Jewish Home1 filing · 3 docs
Floor 3The New Jewish Home1 filing · 3 docs
Floor 2The New Jewish Home1 filing · 3 docs
Floor 1The New Jewish Home41p · 4 filings · 20 docs
Site & exterior3p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
102 W 107th St2907/08/2026
Jewish Home & Hospital1803/21/2026
The New Jewish Home703/22/2026
156 West 106th Street Holding103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jack Green Associates604/16/2024
MVN Associates304/10/2024
Dooling & Company Architects112/04/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
P.wolfe Consultants1803/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DziumaGeneral Contractor1007/08/2026
Stellmar Plumbing MechanicalPlumbing503/22/2026
Stellmar Plumbing & MechanicalPlumbing507/08/2026
Everest ScaffoldingScaffold403/21/2026
Stellmar Plumbing & MechanicalFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jack Green Associates422604/16/2024
MVN Architect5226304/10/2024
Building Lifecycle
All (72)Filed (10)Permit Issued (8)Signed Off (5)Violation (9)Inspection (8)Objection (2)Special Inspection (30)
06/27/2024
Signed off — Alteration
HEREWITH FILING ALTERATIONS TO EXISTING 1'ST FLOOR INTERIOR PARTITIONS, DOORS, AND CEILINGS, TO PROVIDE A NEW ADULT DAY CARE FACILITY- AS AN ACCESSORY USE WITHIN AN EXISTING NURSING HOME FACILITY AS PER PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M08037196-I1
06/05/2024
Special inspection requirement — Lighting controls
JACK GREEN
06/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Notaro
06/05/2024
Special inspection requirement — Preliminary
Michael Notaro
06/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
Michael Notaro
06/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Michael Notaro
06/05/2024
Special inspection requirement — Final
Michael Notaro
06/05/2024
Special inspection requirement — Interior lighting power
JACK GREEN
06/04/2024
Objection resolved — Addressed
05/09/2024
Signed off — Alteration
FILING FOR SPRINKLER MODIFICATION ON 1ST FLOOR OF A NEW ADULT DAY CARE FACILITY- AS AN ACCESSORY USE WITHIN AN EXISTING NURSING HOME FACILITY AS PER PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00834532-I1
04/17/2024
Signed off — Alteration
FILING PLUMBING WORK FOR A NEW ADULT DAY CARE FACILITY- AS AN ACCESSORY USE WITHIN AN EXISTING NURSING HOME FACILITY AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M00834281-I1
04/17/2024
Signed off — Alteration
FILING FOR THE MINOR MECHANICAL WORK, INCLUDING RELOCATION OF CEILING DIFFUSERS AND EXTENSION OF BRANCH DUCT WORK FOR THE NEW ADULT DAY CARE FACILITY ON THE FIRST FLOOR- AS AN ACCESSORY USE WITHIN AN EXISTING NURSING HOME FACILITY.
M00834290-I1
04/16/2024
Filed — Alteration
FILING PLUMBING WORK FOR A NEW ADULT DAY CARE FACILITY- AS AN ACCESSORY USE WITHIN AN EXISTING NURSING HOME FACILITY AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M00834281-P1
04/11/2024
Filed — Alteration
FILING FOR THE MINOR MECHANICAL WORK, INCLUDING RELOCATION OF CEILING DIFFUSERS AND EXTENSION OF BRANCH DUCT WORK FOR THE NEW ADULT DAY CARE FACILITY ON THE FIRST FLOOR- AS AN ACCESSORY USE WITHIN AN EXISTING NURSING HOME FACILITY.
M00834290-P1
04/11/2024
Objection raised — Other
04/11/2024
Special inspection requirement — Maintenance information
JACK GREEN
04/11/2024
Special inspection requirement — Energy Code Compliance Inspections
JACK GREEN
04/11/2024
Special inspection requirement — Mechanical Systems
JACK GREEN
04/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
04/11/2024
Special inspection requirement — Final
JACK GREEN
04/11/2024
Special inspection requirement — Sprinkler Systems
JACK GREEN
04/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
04/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
JACK GREEN
04/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
JACK GREEN
04/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
04/10/2024
Filed — Alteration
FILING FOR SPRINKLER MODIFICATION ON 1ST FLOOR OF A NEW ADULT DAY CARE FACILITY- AS AN ACCESSORY USE WITHIN AN EXISTING NURSING HOME FACILITY AS PER PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00834532-P1
04/10/2024
Filed — Alteration
HEREWITH FILING ALTERATIONS TO EXISTING 1'ST FLOOR INTERIOR PARTITIONS, DOORS, AND CEILINGS, TO PROVIDE A NEW ADULT DAY CARE FACILITY- AS AN ACCESSORY USE WITHIN AN EXISTING NURSING HOME FACILITY AS PER PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M08037196-P1
04/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
04/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
04/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
04/05/2024
Special inspection requirement — Mechanical Systems
JACK GREEN
04/05/2024
Special inspection requirement — Energy Code Compliance Inspections
JACK GREEN
04/05/2024
Special inspection requirement — Final
JACK GREEN
04/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
JACK GREEN
04/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
JACK GREEN
04/05/2024
Special inspection requirement — Maintenance information
JACK GREEN
04/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
JACK GREEN
04/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
JACK GREEN
04/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
04/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
04/03/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/03/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/06/2024
Permit issued — General Construction
M08037196-I1-GC
03/06/2024
Permit issued — Mechanical Systems
M00834290-I1-MS
12/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/16/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/08/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/08/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/08/2023
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
10/20/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/17/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/17/2023
Permit issued — Sprinklers
M00834532-I1-EW-SP
05/15/2023
Permit issued — Mechanical Systems
M00834290-I1-MS
05/12/2023
Permit issued — Plumbing
M00834281-I1-PL
05/11/2023
Permit issued — General Construction
M08037196-I1-GC
05/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/09/2023
Filed — Alteration
FILING PLUMBING WORK FOR A NEW ADULT DAY CARE FACILITY- AS AN ACCESSORY USE WITHIN AN EXISTING NURSING HOME FACILITY AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M00834281-I1
03/09/2023
Filed — Alteration
FILING FOR THE MINOR MECHANICAL WORK, INCLUDING RELOCATION OF CEILING DIFFUSERS AND EXTENSION OF BRANCH DUCT WORK FOR THE NEW ADULT DAY CARE FACILITY ON THE FIRST FLOOR- AS AN ACCESSORY USE WITHIN AN EXISTING NURSING HOME FACILITY.
M00834290-I1
03/09/2023
Filed — Alteration
M00835536-I1
03/08/2023
Filed — Alteration
FILING FOR SPRINKLER MODIFICATION ON 1ST FLOOR OF A NEW ADULT DAY CARE FACILITY- AS AN ACCESSORY USE WITHIN AN EXISTING NURSING HOME FACILITY AS PER PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00834532-I1
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offDziuma03/06/2024
DOB NOWMechanical SystemsSigned-offDziuma03/06/2024
DOB NOWSprinklersSigned-offStellmar Plumbing & Mechanical05/17/2023
DOB NOWMechanical SystemsSigned-offDziuma05/15/2023
DOB NOWPlumbingSigned-offStellmar Plumbing & Mechanical05/12/2023
DOB NOWGeneral ConstructionSigned-offDziuma05/11/2023
DOB NOWSidewalk ShedSigned-offEverest Scaffolding12/06/2019
DOB NOWSidewalk ShedSigned-offEverest Scaffolding12/04/2018
BISSPISSUEDAllstate Sprinkler01/24/2019
BISOTISSUEDPreserv BLD Restoration Management10/27/2018
BISFPISSUEDLund Fire Products Co05/05/2017
BISOTISSUEDThe Shannon Group03/22/2017
BISSPISSUEDAllstate Sprinkler11/09/2016
BISOTISSUEDThe Shannon Group08/29/2016
BISOTISSUEDQuality Building Construction03/02/2007
BISMHISSUEDThe Shannon Group11/17/2003
1 project · most recent 12/04/2018
FiledStatusContractorScope
12/04/2018CompleteBorowide Elect'l Contractors—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/03/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/16/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/08/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/08/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/08/2023Certified Sprinkler - SP - RoughingCertifiedView ↗
10/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/17/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
06/05/2024Lighting controlsJACK GREENenergy_progress
06/05/2024Fire-Resistant Penetrations and JointsMichael Notarospecial
06/05/2024PreliminaryMichael Notaroprogress
06/05/2024Fire-Resistance Rated ConstructionMichael Notaroprogress
06/05/2024Energy Code Compliance InspectionsMichael Notaroprogress
06/05/2024FinalMichael Notaroprogress
06/05/2024Interior lighting powerJACK GREENenergy_progress
04/11/2024Maintenance informationJACK GREENenergy_progress
04/11/2024Energy Code Compliance InspectionsJACK GREENprogress
04/11/2024Mechanical SystemsJACK GREENspecial
04/11/2024Fire-Resistant Penetrations and JointsJACK GREENspecial
04/11/2024FinalJACK GREENprogress
04/11/2024Sprinkler SystemsJACK GREENspecial
04/11/2024Fire-Resistant Penetrations and JointsJACK GREENspecial
04/11/2024HVAC-R and service water heating system controlsJACK GREENenergy_progress
04/11/2024HVAC-R and service water heating equipmentJACK GREENenergy_progress
04/11/2024HVAC-R and service water piping design and insulationJACK GREENenergy_progress
04/09/2024HVAC-R and service water piping design and insulationJACK GREENenergy_progress
04/05/2024Fire-Resistant Penetrations and JointsJACK GREENspecial
04/05/2024Fire-Resistant Penetrations and JointsJACK GREENspecial
04/05/2024Mechanical SystemsJACK GREENspecial
04/05/2024Energy Code Compliance InspectionsJACK GREENprogress
04/05/2024FinalJACK GREENprogress
04/05/2024HVAC-R and service water heating equipmentJACK GREENenergy_progress
04/05/2024HVAC-R and service water heating system controlsJACK GREENenergy_progress
Latest 25 of 44.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The New Jewish HomeMedical / HealthcareFloors 1–5, Roof
Project M00834281 Alteration · LOC Issued · 03/09/2023
Project M00834290 Alteration · LOC Issued · 03/09/2023
Project M00835536 Alteration · Approved · 03/09/2023
Project M00834532 Alteration · LOC Issued · 03/08/2023
Project M08037196 Alteration · LOC Issued · 11/14/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 166 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/06/2026M00104658-I1Request digital key ↗
08/31/2026M00834532-P1Request digital key ↗
08/31/2026M00834532-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION9
10/24/2018140813181Open ↗
10/11/2018123451647Open ↗
07/20/2017122701763Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION5
01/24/2019123451647Open ↗
10/27/2018140813181Open ↗
05/22/2017123055665Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications58
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
09/05/2019123451647Open ↗
09/04/2019123451647Open ↗
09/04/2019123451647Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
08/28/2026M00834281-P1Open ↗
08/28/2026M00834281-P1Open ↗
08/28/2026M00834281-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/31/2026M00834532-P1Open ↗
08/31/2026M00834532-I1Open ↗
08/31/2026M00834290-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/21/2026M00834532-I1Open ↗
08/28/2026M00834281-P1Open ↗
08/28/2026M08037196-P1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
10/24/2018140813181Open ↗
10/24/2018140813181Open ↗
06/03/2016122701763Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/03/2016122701763Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/24/2018140813181Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/24/2018140813181Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
10/11/2018123451647Open ↗
07/20/2017122701763Open ↗
07/13/2017122701763Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
11/13/2017123055665Open ↗
▸Safety & Tenant Protection1
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
06/27/2016122701763Open ↗
▸Environmental & Asbestos21
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
10/24/2018140813181Open ↗
10/11/2018123451647Open ↗
04/04/2017123055665Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice to Proceed5
08/13/2026M00834281-I1Open ↗
08/13/2026M08037196-I1Open ↗
08/13/2026M08037196-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/31/2026M00834532-I1Open ↗
08/27/2026M00834281-I1Open ↗
08/13/2026M00834290-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/13/2026M00104658-I1Open ↗
08/13/2026M00834281-I1Open ↗
08/13/2026M00834290-I1Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
10/24/2018140813181Open ↗
06/03/2016122701763Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
05/20/2020140813181Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/11/2018123451647Open ↗
06/03/2016122701763Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/20/2020140813181Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/20/2020140813181Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/24/2018140813181Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY3
05/20/2020140813181Open ↗
10/24/2018140813181Open ↗
10/24/2018140813181Open ↗
▸BISHYDRO FLOW TEST LETTER1
12/11/2018123451647Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
10/11/2018123451647Open ↗
▸Approvals, Objections & Sign-offs20
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/31/2026M00834290-I1Open ↗
08/13/2026M00835536-I1Open ↗
08/13/2026M00834281-I1Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
05/20/2020140813181Open ↗
11/06/2019123451647Open ↗
09/04/2019123451647Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/13/2026M00834290-I1Open ↗
08/13/2026M00834281-I1Open ↗
08/13/2026M00834532-I1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/03/2017122701763Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
11/06/2019123451647Open ↗
10/24/2018140813181Open ↗
10/11/2018123451647Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms13
▸BISBOROUGH INTAKE FORM5
11/06/2019123451647Open ↗
09/04/2019123451647Open ↗
11/13/2017123055665Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET5
10/11/2018123451647Open ↗
04/04/2017123055665Open ↗
08/11/2016122667943Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION2
07/20/2017122701763Open ↗
07/13/2017122701763Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/24/2018140813181Open ↗
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
10/11/2018123451647Open ↗
04/04/2017123055665Open ↗
08/11/2016122667943Open ↗
Showing 3 of 5 on file for this type
▸BISFEE EXEMPTION DOCUMENTATION1
10/24/2018140813181Open ↗