← Back
Over six families without stores
102 WEST 142 STREET
MANHATTAN · Harlem (North) · BIN 1079762
💬 Discuss this project
1920Year Built
6Stories
C1Building Class
R7-2Zoning
21,016 sfGross Floor Area
18Units
Rent Stabilized54 Open Violations ▸
Over six families without stores · Owner of record: AMSTERDAM GARVEY HOUSING DEVELOPMENT FUN D CORP. · 4,950 sf lot · 4.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentLandscapeGeneral
Roof13p · 2 filings · 20 docs
Floor 610p · 1 filing · 13 docs
Floor 510p · 1 filing · 13 docs
Floor 410p · 1 filing · 13 docs
Floor 310p · 1 filing · 13 docs
Floor 210p · 1 filing · 13 docs
Floor 123p · 3 filings · 20 docs
Cellar22p · 2 filings · 20 docs
Site & exterior7p · 2 filings · 5 docs
Filed — no permit issued1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WEST HARLEM GROUP ASSISTANCE4207/08/2026
AMSTERDAM GARVEY HOUSING DEVELOPMENT FUN D CORP.203/22/2026
DEPT OF HOUSING PRES DEVEL103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
P. M. ARCHITECTURE, PC1501/06/2026
ASHRAF CORP107/05/2025
ARQUITECTURA VARELA102/26/2025
SYNERGIC DESIGN ARCHITECTS101/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PM ARCHITECTURE PC3003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HORIZON CONSTRUCTION INCGeneral Contractor504/09/2026
ALPHA SCAFFOLDING INCGeneral Contractor404/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing407/08/2026
ACCORD POWER INCGeneral Contractor203/21/2026
SWEET, ROBERTElectrical103/21/2026
ACCORD POWER ELECTRIC LLCElectrical103/22/2026
WCK ELECTRIC CORP.Electrical103/22/2026
BLAKE, PETERElectrical103/21/2026
IRVING BAPTISTEElectrical103/21/2026
NICHOLAS, GILBERTElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING49831207/25/2025
SYNERGIC DESIGN LLC8561101/13/2025
Building Lifecycle
All (136)Filed (18)Permit Issued (11)Signed Off (8)Violation (60)Inspection (9)Special Inspection (30)
05/28/2026
Violation issued (HPD, open)
C
05/28/2026
Violation issued (HPD, open)
C
05/28/2026
Violation issued (HPD, open)
C
05/28/2026
Violation issued (HPD, open)
B
05/01/2026
Signed off — Alteration
Boiler replacement as per plan in conjunction to M00826754-I1 , no change to use egress or occupancy
M01047566-S1
04/29/2026
Violation issued (HPD, closed)
A
02/12/2026
Signed off — Alteration
Renovated bathrooms and kitchens at apts. 1A and 1B for ADA compliance. No change to use egress or occupancy.
M00830546-I1
02/12/2026
Signed off — Alteration
Boiler replacement as per plan in conjunction to M00826754-I1 , no change to use egress or occupancy
M01047566-S2
02/12/2026
Signed off — Alteration
Job is Part of HPD Year 15 program work to upgrade common areas, cellar, lobby/1st floor corridor, typ. floors corridor, & roof. Minor interior cosmetic work at apt 2c and 3C All work is as per plan. No change to use, egress, or occupancy under this
M00826754-I1
02/12/2026
Signed off — Alteration
Replace and relocate plumbing fixtures at kitchen bath per revised layout at apt 1A. No change in use egress or occupancy.
M00829384-I1
01/30/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/30/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/14/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
01/06/2026
Filed — Alteration
Boiler replacement as per plan in conjunction to M00826754-I1 , no change to use egress or occupancy
M01047566-P4
01/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
12/19/2025
Filed — Alteration
Boiler replacement as per plan in conjunction to M00826754-I1 , no change to use egress or occupancy
M01047566-P3
11/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/23/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/17/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/16/2025
Permit issued — General Construction
M00830546-I1-GC
10/16/2025
Permit issued — General Construction
M00826754-I1-GC
10/11/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01251391-I1
10/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/28/2025
Violation issued (HPD, open)
B
09/28/2025
Violation issued (HPD, open)
B
09/28/2025
Violation issued (HPD, closed)
C
09/28/2025
Violation issued (HPD, open)
B
09/28/2025
Violation issued (HPD, closed)
C
09/28/2025
Violation issued (HPD, closed)
C
09/28/2025
Violation issued (HPD, open)
B
09/28/2025
Violation issued (HPD, open)
A
09/28/2025
Violation issued (HPD, closed)
B
09/28/2025
Violation issued (HPD, closed)
C
09/28/2025
Violation issued (HPD, open)
C
09/28/2025
Violation issued (HPD, open)
C
09/28/2025
Violation issued (HPD, open)
B
09/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/14/2025
Violation issued (HPD, open)
B
09/14/2025
Violation issued (HPD, closed)
C
09/14/2025
Violation issued (HPD, closed)
C
09/14/2025
Violation issued (HPD, open)
B
09/12/2025
Permit issued — Plumbing
M00829384-I1-PL
09/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
09/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
09/08/2025
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
09/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
08/27/2025
Permit issued — Boiler Equipment
M01047566-I1-BE
08/19/2025
Permit issued — Boiler Equipment
M01047566-S2-BE
07/25/2025
Filed — Alteration
Boiler replacement as per plan in conjunction to M00826754-I1 , no change to use egress or occupancy
M01047566-P2
07/21/2025
Filed — Alteration
Replace and relocate plumbing fixtures at kitchen bath per revised layout at apt 1A. No change in use egress or occupancy.
M00829384-P2
07/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
07/17/2025
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
07/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
07/15/2025
Filed — Alteration
Boiler replacement as per plan in conjunction to M00826754-I1 , no change to use egress or occupancy
M01047566-S2
07/15/2025
Filed — Alteration
Boiler replacement as per plan in conjunction to M00826754-I1 , no change to use egress or occupancy
M01047566-P1
07/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
07/15/2025
Special inspection requirement — Heating Systems
ALEXIS SCHLESSINGERMAN
Latest 60 of 136 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC10/16/2025
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC10/16/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.09/12/2025
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.08/27/2025
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.08/19/2025
DOB NOWSidewalk ShedSigned-offALPHA SCAFFOLDING INC07/07/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.03/21/2025
DOB NOWSidewalk ShedSigned-offALPHA SCAFFOLDING INC02/26/2025
DOB NOWSolarSigned-offACCORD POWER INC02/13/2025
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC10/30/2024
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC10/30/2024
BISOTISSUEDAP. TEK RESTORATION INC10/04/2012
BISEQISSUEDGUL & G CONSTR. CORP08/23/2012
BISEQISSUEDGUL & G CONSTR. CORP08/22/2012
BISOTISSUEDAP. TEK RESTORATION INC07/09/2012
BISEQISSUEDGUL & G CONSTR. CORP07/05/2012
BISEQISSUEDGUL & G CONSTR. CORP07/05/2012
BISSPISSUEDF.S. WORKS INC05/08/2002
BIS—ISSUEDBFC CONSTRUCTION03/28/2002
BISEQISSUEDBFC CONSTRUCTION03/28/2002
BISEQISSUEDBFC CONSTRUCTION01/15/2002
BISPLISSUED01/08/2002
BISOTISSUEDMOGA CONSTRUCTION CORP.06/29/2001
BISOTISSUEDBARNETT IRON ASSOCIATES06/26/2001
BISEQISSUEDLILLY CONSTRUCTIONN03/30/2001
BISOTISSUEDEASTERN CONSTRUCION CO03/27/1997
BISFBISSUEDNU WAY FUEL OIL BURNERS INC07/31/1996
BIS—ISSUEDVERDICO INDUSTRIES INC01/18/1995
BIS—ISSUEDVERDICO INDUSTRIES INC09/21/1994
BIS—ISSUEDVERDICO INDUSTRIES INC10/01/1993
BISPLISSUEDCHINATOWN PLBG & HTG INC12/18/1992
BIS—ISSUEDVERDICO INDUSTRIES INC11/19/1992
1 project · most recent 01/06/2026
Gas
FiledStatusContractorScope
01/06/2026Signed-offAMERICAN STANDARD P&H CORGas
3 projects · most recent 07/07/2025
FiledStatusContractorScope
07/07/2025CompleteRICHARD NEU—
02/27/2025CompleteWCK ELECTRIC CORP.—
01/08/2025CompleteACCORD POWER ELECTRIC LLC—
1 project · most recent 06/13/2024
FiledStatusContractorScope
06/13/2024——28 panels, 11.2 kw, 3,730 roof_area_sqft
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
01/30/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/30/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/23/2025Pass-Final Boiler Equipment InspectionPassView ↗
10/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/17/2025Pass-Final Boiler Equipment InspectionPassView ↗
10/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
01/07/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
01/05/2026Tenant Protection Plan Compliance—special
09/08/2025Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
09/08/2025HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
09/08/2025Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
09/08/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
07/17/2025Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
07/17/2025Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
07/17/2025Tenant Protection Plan Compliance—special
07/17/2025HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
07/15/2025HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
07/15/2025Heating SystemsALEXIS SCHLESSINGERMANspecial
07/15/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
07/15/2025HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
07/15/2025HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
07/15/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
07/15/2025Heating SystemsALEXIS SCHLESSINGERMANspecial
07/15/2025HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
07/15/2025HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
07/15/2025HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
06/25/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
06/25/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
06/24/2025HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
06/24/2025Heating SystemsALEXIS SCHLESSINGERMANspecial
06/24/2025HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
Latest 25 of 51.
▾Documents — 126 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/31/2026M00829384-P1Request digital key ↗
08/31/2026M00829384-P2Request digital key ↗
08/31/2026M00829384-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits9
▸BISWORK PERMIT APPLICATION6
10/09/2012121138982Open ↗
08/30/2012121103082Open ↗
08/23/2012121101244Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
07/10/2012121138982Open ↗
07/09/2012121103082Open ↗
07/06/2012121101244Open ↗
▸Seals & Professional Certifications54
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/31/2026M00829384-P1Open ↗
08/31/2026M00829384-P2Open ↗
08/31/2026M00829384-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026M00826754-I1Open ↗
09/01/2026M00826754-I1Open ↗
09/01/2026M01055628-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/01/2026M00826754-I1Open ↗
09/01/2026M01055628-I1Open ↗
08/28/2026M01047566-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/10/2012121138982Open ↗
07/09/2012121103082Open ↗
07/06/2012121101244Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
07/10/2012121138982Open ↗
07/09/2012121103082Open ↗
07/06/2012121101244Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
07/10/2012121138982Open ↗
07/06/2012121101244Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/31/2026M00829384-I1Open ↗
08/31/2026M00829384-P2Open ↗
08/31/2026M00829384-P1Open ↗
Showing 3 of 15 on file for this type
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/10/2012121138982Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/27/2026M01047566-I1Open ↗
▸Approvals, Objections & Sign-offs22
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter17
08/31/2026M00829384-P1Open ↗
08/31/2026M00829384-P2Open ↗
08/31/2026M00829384-I1Open ↗
Showing 3 of 17 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
07/10/2012121138982Open ↗
07/09/2012121103082Open ↗
07/06/2012121101244Open ↗
▸BISSHED LETTER1
08/30/2012121103082Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026M01150326-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
07/10/2012121138982Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET3
07/10/2012121138982Open ↗
07/09/2012121103082Open ↗
07/06/2012121101244Open ↗
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026M00826754-P1Open ↗
08/13/2026M00826754-I1Open ↗