← Back
BuildNYC
Three families
1020 46TH STREET
BROOKLYN · BIN 3136861
💬 Discuss this project
1920Year Built
3Stories
C0Building Class
R6Zoning
3,600 sfGross Floor Area
3Units
Rent Stabilized7 Active Violations ▸FDNY Report ↗
Three families · Owner of record: 1020 46 LLC · 2,504 sf lot · 1.44 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof13p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 324p · 1 filing · 20 docs
Floor 225p · 1 filing · 20 docs
Floor 124p · 1 filing · 20 docs
Cellar27p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1020 46 LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/07/2022$1.7M—Private party → Private party$478/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AL Ffred Architecture702/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XYZ Code Consulting703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Four Boro EnterpriseGeneral Contractor203/21/2026
Plumbing P & HPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection1519502/17/2025
Building Lifecycle
All (99)Filed (7)Permit Issued (2)Signed Off (2)Violation (16)Inspection (4)Objection (38)Special Inspection (30)
05/01/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, open)
I
06/06/2025
Violation issued (HPD, open)
A
03/28/2025
Signed off — Alteration
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATIONS TO EXISTING 3 FAMILY BUILDINGTO RESOLVE VIOLATIONS 39078245L, 39078220P AND 39078226X . NO CHANGE IN USE , EGRESS OROCCUPANCY
B00915396-I1
03/28/2025
Signed off — Alteration
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATIONS TO EXISTING 3 FAMILY BUILDINGTO RESOLVE VIOLATIONS 39078245L, 39078220P AND 39078226X . NO CHANGE IN USE , EGRESS OROCCUPANCY
B00915396-S3
03/06/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
03/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
03/06/2025
Special inspection requirement — Permanent certificate
Younes Abouyaala
03/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
03/06/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
03/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
03/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
02/17/2025
Filed — Alteration
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATIONS TO EXISTING 3 FAMILY BUILDINGTO RESOLVE VIOLATIONS 39078245L, 39078220P AND 39078226X . NO CHANGE IN USE , EGRESS OROCCUPANCY
B00915396-P2
01/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/10/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/13/2024
Objection raised — Scope
12/12/2024
Permit issued — Plumbing
B00915396-S3-PL
12/09/2024
Objection raised — Admin
11/29/2024
Filed — Alteration
Installation of new backflow preventer
B01148587-I1
11/27/2024
Violation issued (HPD, open)
I
11/27/2024
Objection resolved — Addressed
11/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/01/2024
Objection resolved — Addressed
11/01/2024
Objection resolved — Addressed
11/01/2024
Objection resolved — Addressed
10/22/2024
Objection raised — Other
10/22/2024
Objection raised — Admin
10/22/2024
Objection raised — Admin
10/22/2024
Objection raised — Admin
10/15/2024
Filed — Alteration
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATIONS TO EXISTING 3 FAMILY BUILDINGTO RESOLVE VIOLATIONS 39078245L, 39078220P AND 39078226X . NO CHANGE IN USE , EGRESS OROCCUPANCY
B00915396-S3
10/15/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
10/15/2024
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
10/15/2024
Special inspection requirement — Metering
Younes Abouyaala
10/15/2024
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
10/15/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
10/15/2024
Special inspection requirement — Final
NAVEEN KUMAR
10/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
10/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
10/15/2024
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
10/15/2024
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
10/15/2024
Special inspection requirement — Fenestration areas
Younes Abouyaala
10/02/2024
Filed — Alteration
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATIONS TO EXISTING 3 FAMILY BUILDINGTO RESOLVE VIOLATIONS 39078245L, 39078220P AND 39078226X . NO CHANGE IN USE , EGRESS OROCCUPANCY
B00915396-S2
09/20/2024
Special inspection requirement — Sprinkler Systems
04/08/2024
Violation issued (HPD, open)
A
02/01/2024
Violation issued (ECB, closed)
Construction
12/14/2023
Filed — Alteration
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATIONS TO EXISTING 3 FAMILY BUILDINGTO RESOLVE VIOLATIONS 39078245L, 39078220P AND 39078226X . NO CHANGE IN USE , EGRESS OROCCUPANCY
B00915396-P1
12/14/2023
Special inspection requirement — Fenestration areas
12/14/2023
Special inspection requirement — Insulation placement and R values
12/14/2023
Special inspection requirement — Air barrier - visual inspection
12/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
12/14/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
12/14/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
12/14/2023
Special inspection requirement — Final
NAVEEN KUMAR
12/14/2023
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
12/14/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
12/14/2023
Special inspection requirement — Fenestration air leakage
11/21/2023
Violation issued (HPD, open)
I
10/24/2023
Permit issued — General Construction
B00915396-I1-GC
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPlumbing P & H12/12/2024
DOB NOWGeneral ConstructionSigned-offFour Boro Enterprise10/24/2023
3 projects · most recent 02/17/2025
Water/Sanitary Gas
FiledStatusContractorScope
02/17/2025Signed-offBruche Mechanical NYGas, Water/Sanitary
11/29/2024——Water/Sanitary
05/01/2023——Gas, Water/Sanitary
2 projects · most recent 02/09/2024
General Wiring
FiledStatusContractorScope
02/09/2024Permit IssuedPower Direct ElectricGeneral Wiring
01/25/2023Permit IssuedPower Direct ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/10/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
03/06/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
03/06/2025HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
03/06/2025Permanent certificateYounes Abouyaalaenergy_progress
03/06/2025HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
03/06/2025Maintenance informationYounes Abouyaalaenergy_progress
03/06/2025HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
03/06/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
11/27/2024Fire-Resistant Penetrations and Joints—special
10/15/2024Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
10/15/2024Air barrier - visual inspectionYounes Abouyaalaenergy_progress
10/15/2024MeteringYounes Abouyaalaenergy_progress
10/15/2024Fenestration air leakageYounes Abouyaalaenergy_progress
10/15/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
10/15/2024FinalNAVEEN KUMARprogress
10/15/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
10/15/2024Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
10/15/2024Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
10/15/2024Insulation placement and R valuesYounes Abouyaalaenergy_progress
10/15/2024Fenestration areasYounes Abouyaalaenergy_progress
09/20/2024Sprinkler Systems—special
12/14/2023Fenestration areas—energy_progress
12/14/2023Insulation placement and R values—energy_progress
12/14/2023Air barrier - visual inspection—energy_progress
12/14/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
12/14/2023Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
Latest 25 of 33.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026B00839334-I1Request digital key ↗
08/24/2026B00915396-P2Request digital key ↗
08/24/2026B00915396-S2Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature15
10/08/2026B00915396-S3Open ↗
10/08/2026B00915396-S3Open ↗
09/02/2026B00915396-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026B00839334-I1Open ↗
08/27/2026B00839334-S1Open ↗
08/24/2026B00915396-S3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
10/08/2026B00915396-S3Open ↗
09/02/2026B00915396-P1Open ↗
09/02/2026B00915396-P1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/27/2026B00839334-I1Open ↗
08/24/2026B00915396-P2Open ↗
08/24/2026B00915396-S2Open ↗
Showing 3 of 8 on file for this type