Predominantly retail with other uses
1020 MADISON AVENUE
MANHATTAN · Upper East Side-Carnegie Hill · BIN 1041867
💬 Discuss this project
1910Year Built
5Stories
K4Building Class
C5-1Zoning
9,567 sfGross Floor Area
4Units
10 Open Violations 7 unresolved · 3 paperwork only ▸
Predominantly retail with other uses · Owner of record: ARYEH REALTY CORP · 1,917 sf lot · 4.99 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Floor 233p · 2 filings · 20 docs
Floor 134p · 2 filings · 20 docs
Cellar33p · 2 filings · 20 docs
Site & exterior2p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ARYEH REALTY6007/08/2026
ARYCH REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEON SKVIRSKY PE403/12/2026
KENNETH PARK ARCHITECTS211/11/2024
AUTOMATED DESIGN ENGINEERING, PLLC208/27/2024
KMB DESIGN GROUP, LLC408/07/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EA DESIGN GROUP1203/21/2026
BUILDING BROTHERS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HIRSCH CONSTRUCTION CORPGeneral Contractor403/21/2026
NATIONAL MAINTENANCE INCGeneral Contractor104/09/2026
PLUMBING WORKS CORPFire Protection107/08/2026
BLUEWATER PLBG& HTG INCPlumbing107/08/2026
NATIONAL SIGN LIGHTINGScaffold107/08/2026
SIGNSTAR NYCScaffold107/08/2026
SIGN STAR NYCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK ENGINEERING PC678611/11/2024
Building Lifecycle
All (93)Filed (12)Permit Issued (8)Signed Off (3)Violation (35)Inspection (5)Special Inspection (30)
03/17/2026
Signed off — Alteration
INSTALL NON-ILLUMINATED COPY ON STOREFRONT AWNINGS FILED UNDER SEPARATE APPLICATION # M00956148. (FLAGSTAR)
M00956135-I1
03/17/2026
Signed off — Alteration
REPLACE EXISTING STOREFRONT AWNINGS. ALL COPY ON AWNINGS FILED UNDER SEPARATE APPLICATION # M00956135. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00956148-I1
03/13/2026
Special inspection requirement — Final
LEON SKVIRSKY
03/12/2026
Filed — Alteration
INSTALL NON-ILLUMINATED COPY ON STOREFRONT AWNINGS FILED UNDER SEPARATE APPLICATION # M00956148. (FLAGSTAR)
M00956135-P1
03/12/2026
Filed — Alteration
REPLACE EXISTING STOREFRONT AWNINGS. ALL COPY ON AWNINGS FILED UNDER SEPARATE APPLICATION # M00956135. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00956148-P1
02/06/2026
Permit issued — Sign
M00956135-I1-SG
02/06/2026
Permit issued — General Construction
M00956148-I1-GC
12/24/2025
Special inspection requirement — Final
LEON SKVIRSKY
12/24/2025
Special inspection requirement — Final
LEON SKVIRSKY
12/04/2024
Signed off — Alteration
Install extension to existing sprinkler system and relocated heads to coordinate with renovated space. There is no significant change to the hydraulic load. There is no change in use, occupancy, or egress.
M01072690-I1
11/12/2024
Special inspection requirement — Final
Kenneth Park
11/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
11/11/2024
Filed — Alteration
APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS IN THE CELLAR, 1ST, & 2ND FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01016795-P3
11/05/2024
Special inspection requirement — Final
Kenneth Park
11/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
09/24/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/13/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/10/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/04/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/27/2024
Filed — Alteration
Install extension to existing sprinkler system and relocated heads to coordinate with renovated space. There is no significant change to the hydraulic load. There is no change in use, occupancy, or egress.
M01072690-P1
08/27/2024
Special inspection requirement — Sprinkler Systems
Ari Kamo
08/17/2024
Special inspection requirement — Sprinkler Systems
Ari Kamo
08/07/2024
Filed — Alteration
APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS IN THE CELLAR, 1ST, & 2ND FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01016795-P1
08/07/2024
Filed — Alteration
APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS IN THE CELLAR, 1ST, & 2ND FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01016795-P2
08/07/2024
Special inspection requirement — Lighting controls
Ari Kamo
08/07/2024
Special inspection requirement — Duct leakage testing, insulation and design
Ari Kamo
08/07/2024
Special inspection requirement — Interior lighting power
Ari Kamo
08/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
Ari Kamo
08/07/2024
Special inspection requirement — Maintenance information
Ari Kamo
08/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Ari Kamo
08/07/2024
Special inspection requirement — Mechanical Systems
Ari Kamo
08/07/2024
Special inspection requirement — Final
Ari Kamo
08/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
08/07/2024
Special inspection requirement — HVAC-R and service water heating system controls
Ari Kamo
08/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
08/01/2024
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
08/01/2024
Special inspection requirement — Final
Ari Kamo
08/01/2024
Special inspection requirement — Duct leakage testing, insulation and design
Ari Kamo
08/01/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Ari Kamo
08/01/2024
Special inspection requirement — HVAC-R and service water heating system controls
Ari Kamo
08/01/2024
Special inspection requirement — Interior lighting power
Ari Kamo
08/01/2024
Special inspection requirement — HVAC-R and service water heating equipment
Ari Kamo
08/01/2024
Special inspection requirement — Lighting controls
Ari Kamo
08/01/2024
Special inspection requirement — Maintenance information
Ari Kamo
08/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
07/05/2024
Permit issued — Sprinklers
M01072690-I1-EW-SP
06/28/2024
Filed — Alteration
Install extension to existing sprinkler system and relocated heads to coordinate with renovated space. There is no significant change to the hydraulic load. There is no change in use, occupancy, or egress.
M01072690-I1
06/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/14/2024
Permit issued — Plumbing
M01016795-S2-PL
04/10/2024
Permit issued — Mechanical Systems
M01016795-S1-MS
04/01/2024
Filed — Alteration
APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS IN THE CELLAR, 1ST, & 2ND FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01016795-S2
04/01/2024
Filed — Alteration
APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS IN THE CELLAR, 1ST, & 2ND FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01016795-S1
03/27/2024
Permit issued — General Construction
M01016795-I1-GC
03/17/2024
Filed — Alteration
APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS IN THE CELLAR, 1ST, & 2ND FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01016795-I1
11/24/2023
Permit issued — Sign
M00956135-I1-SG
11/24/2023
Permit issued — General Construction
M00956148-I1-GC
11/16/2023
Filed — Alteration
INSTALL NON-ILLUMINATED COPY ON STOREFRONT AWNINGS FILED UNDER SEPARATE APPLICATION # M00956148. (FLAGSTAR)
M00956135-I1
11/16/2023
Filed — Alteration
REPLACE EXISTING STOREFRONT AWNINGS. ALL COPY ON AWNINGS FILED UNDER SEPARATE APPLICATION # M00956135. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00956148-I1
08/01/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/11/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC02/06/2026
DOB NOWGeneral ConstructionSigned-offNATIONAL MAINTENANCE INC02/06/2026
DOB NOWSprinklersSigned-offBLUEWATER P&H, INC07/05/2024
DOB NOWPlumbingSigned-offBLUEWATER PLBG& HTG INC05/14/2024
DOB NOWMechanical SystemsSigned-offHIRSCH CONSTRUCTION CORP04/10/2024
DOB NOWGeneral ConstructionPermit IssuedHIRSCH CONSTRUCTION CORP03/27/2024
DOB NOWSignSigned-offSIGNSTAR NYC11/24/2023
DOB NOWGeneral ConstructionSigned-offSIGN STAR NYC11/24/2023
BISSPISSUEDPAR FIRE PROTECTION LLC03/31/2009
BISPLISSUEDPAR PLUMBING CO., INC08/29/2008
BISSPISSUEDCURRENT FIRE PROTECTION INC05/01/2008
BISOTISSUEDCOMMERCIAL CONSTRUCTION M04/03/2008
BISMHISSUEDCOMMERCIAL CONSTRUCTION M04/03/2008
BISMHISSUEDRC. DOLNER CONSTRUCTION (CORP)03/27/2008
BISOTISSUEDRC. DOLNER CONSTRUCTION (CORP)03/27/2008
BISOTISSUEDRC. DOLNER CONSTRUCTION (CORP)01/31/2008
BISMHISSUEDRC. DOLNER CONSTRUCTION (CORP)01/31/2008
BISOTISSUEDTHE GOING SERVICING CO, INC11/29/2006
BISOTISSUEDTHE GOING SERVICING CO, INC11/29/2006
BISOTISSUEDVANGUARD CONSTRUCTION AND06/14/2006
BISMHISSUEDVANGUARD CONSTRUCTION AND06/14/2006
BISPLISSUEDPARAMOUNT PLBG SVCE & ALTERTION04/20/2006
BISOTISSUEDVANGUARD CONSTRUCTION AND03/14/2006
BISMHISSUEDVANGUARD CONSTRUCTION AND03/14/2006
BISOTISSUEDFRANCO REMODELING CORP10/11/2002
1 project · most recent 11/11/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/11/2024Signed-offHIRSCH CONSTRUCTION CORPVentilation Systems
Ventilation
Greenheck SP-A50-90-VG 50 CFM · Exhaust Fan ×3
1 project · most recent 09/25/2024
General Wiring
FiledStatusContractorScope
09/25/2024CompleteGREEN APPLE ELECL SVCS LLGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/13/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/10/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
03/13/2026FinalLEON SKVIRSKYprogress
12/24/2025FinalLEON SKVIRSKYprogress
12/24/2025FinalLEON SKVIRSKYprogress
11/12/2024FinalKenneth Parkprogress
11/12/2024Fire-Resistant Penetrations and JointsAri Kamospecial
11/05/2024FinalKenneth Parkprogress
11/05/2024Fire-Resistant Penetrations and JointsAri Kamospecial
08/27/2024Sprinkler SystemsAri Kamospecial
08/17/2024Sprinkler SystemsAri Kamospecial
08/07/2024Lighting controlsAri Kamoenergy_progress
08/07/2024Duct leakage testing, insulation and designAri Kamoenergy_progress
08/07/2024Interior lighting powerAri Kamoenergy_progress
08/07/2024HVAC-R and service water heating equipmentAri Kamoenergy_progress
08/07/2024Maintenance informationAri Kamoenergy_progress
08/07/2024HVAC-R and service water piping design and insulationAri Kamoenergy_progress
08/07/2024Mechanical SystemsAri Kamospecial
08/07/2024FinalAri Kamoprogress
08/07/2024Energy Code Compliance InspectionsAri Kamoprogress
08/07/2024HVAC-R and service water heating system controlsAri Kamoenergy_progress
08/07/2024Fire-Resistant Penetrations and JointsAri Kamospecial
08/01/2024Energy Code Compliance InspectionsAri Kamoprogress
08/01/2024FinalAri Kamoprogress
08/01/2024Duct leakage testing, insulation and designAri Kamoenergy_progress
08/01/2024HVAC-R and service water piping design and insulationAri Kamoenergy_progress
08/01/2024HVAC-R and service water heating system controlsAri Kamoenergy_progress
Latest 25 of 31.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Flagstar Private BankRetail—
Project M00956135 Alteration · LOC Issued · 11/16/2023
Project M00956148 Alteration · LOC Issued · 11/16/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 159 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/27/2026M01072690-P1Request digital key ↗
08/27/2026M01072690-I1Request digital key ↗
08/25/2026M01016795-S2Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits19
▸BISWORK PERMIT APPLICATION10
12/12/2013121845860Open ↗
03/31/2009110080509Open ↗
08/29/2008110079218Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
11/21/2013121845860Open ↗
09/19/2011120788905Open ↗
09/12/2011110124543Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications62
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION20
01/08/2018104605205Open ↗
01/08/2018104605205Open ↗
01/08/2018104605214Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026M01072690-I1Open ↗
08/25/2026M01016795-S2Open ↗
08/25/2026M01016795-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026M01016795-S1Open ↗
09/15/2026M01016795-I1Open ↗
09/01/2026M00956135-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
11/21/2013121845860Open ↗
10/25/2011110124543Open ↗
09/19/2011120788905Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026M01016795-S1Open ↗
09/15/2026M01016795-I1Open ↗
09/01/2026M01072690-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
09/19/2011120788905Open ↗
03/31/2008110124543Open ↗
03/31/2008110124543Open ↗
Showing 3 of 5 on file for this type
▸BISPC FULL REPORT3
02/04/2008110080509Open ↗
01/31/2008110079218Open ↗
01/31/2008110079218Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/21/2013121845860Open ↗
▸Trade Schedules & Equipment24
▸BISEQUIPMENT USE PERMITS6
12/30/2013121845860Open ↗
12/17/2013121845860Open ↗
01/31/2011110079218Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
09/01/2009110079218Open ↗
04/28/2009110080509Open ↗
09/25/2008110079218Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING5
09/19/2011120788905Open ↗
03/27/2009110080509Open ↗
03/09/2009110080509Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
12/30/2013121845860Open ↗
01/31/2011110079218Open ↗
11/05/2010110124543Open ↗
Showing 3 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
04/28/2009110080509Open ↗
07/18/2008110124543Open ↗
06/02/2008110124543Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/27/2026M01072690-I1Open ↗
08/25/2026M01016795-P1Open ↗
08/25/2026M01016795-S2Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
03/31/2008110124543Open ↗
03/31/2008110124543Open ↗
02/04/2008110080509Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
12/30/2013121845860Open ↗
12/12/2013121845860Open ↗
11/21/2013121845860Open ↗
▸BISTECHNICAL REPORT: ENERGY1
09/19/2011120788905Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/30/2013121845860Open ↗
▸Approvals, Objections & Sign-offs9
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
01/08/2018104605205Open ↗
01/08/2018104605214Open ↗
12/30/2013121845860Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
09/19/2011120788905Open ↗
03/31/2008110124543Open ↗
02/04/2008110080509Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/28/2011110124543Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
01/08/2018104605205Open ↗
01/08/2018104605214Open ↗
12/30/2013121845860Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET4
11/21/2013121845860Open ↗
09/19/2011120788905Open ↗
03/31/2008110124543Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
01/08/2018104605205Open ↗
01/08/2018104605214Open ↗