← Back
Primarily 4 family with 1 store or office
1020 RUTLAND ROAD
BROOKLYN · BIN 3099987
💬 Discuss this project
1931Year Built
3Stories
S4Building Class
R6Zoning
3,432 sfGross Floor Area
5Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Primarily 4 family with 1 store or office · Owner of record: RUTLAND 1020 LLC · 2,000 sf lot · 1.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Floor 331p · 1 filing · 20 docs
Floor 229p · 1 filing · 20 docs
Floor 129p · 1 filing · 20 docs
Cellar35p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REVAMP NYC603/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/05/2024$1.0M—Private party → RUTLAND 1020 LLC$291/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AG ENGINEERING PLLC810/23/2025
VASILIOS ARTEMIOU PE405/21/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC1203/21/2026
BMG GROUP USA603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REVAMP NYC CORPGeneral Contractor307/08/2026
PIPE SOLUTIONS ADVIS INCPlumbing207/08/2026
ARCO PLBG AND HTG INCFire Protection107/08/2026
FLINT MECHANICAL CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524610/23/2025
HRF SERVICES CORP5616605/22/2025
Building Lifecycle
All (148)Filed (12)Permit Issued (7)Signed Off (4)Violation (17)Inspection (12)Objection (66)Special Inspection (30)
05/05/2026
Violation issued (HPD, closed)
A
04/20/2026
Violation issued (HPD, closed)
C
04/20/2026
Violation issued (HPD, closed)
C
04/06/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/25/2026
Inspection — Certified Storm Drainage-ST-Piping-Water Test
Certified
View inspection ↗
02/08/2026
Violation issued (HPD, open)
B
02/08/2026
Violation issued (HPD, closed)
C
02/08/2026
Violation issued (HPD, closed)
C
02/08/2026
Violation issued (HPD, open)
B
02/08/2026
Violation issued (HPD, open)
B
12/02/2025
Violation issued (HPD, closed)
C
11/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
11/24/2025
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
11/24/2025
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
11/24/2025
Special inspection requirement — Interior lighting power
Shahrish Shuvo
11/24/2025
Special inspection requirement — Metering
Shahrish Shuvo
11/24/2025
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
11/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
11/24/2025
Special inspection requirement — Permanent certificate
Shahrish Shuvo
11/24/2025
Special inspection requirement — Fenestration areas
Shahrish Shuvo
11/24/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
11/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
11/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
11/24/2025
Special inspection requirement — Maintenance information
Shahrish Shuvo
11/08/2025
Signed off — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01125060-I1
B01125060-S2
10/23/2025
Filed — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01125060-I1
B01125060-P7
10/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
10/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
10/23/2025
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
10/23/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
10/23/2025
Special inspection requirement — Interior lighting power
Shahrish Shuvo
10/23/2025
Special inspection requirement — Metering
Shahrish Shuvo
10/23/2025
Special inspection requirement — Maintenance information
Shahrish Shuvo
10/23/2025
Special inspection requirement — Permanent certificate
Shahrish Shuvo
10/23/2025
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
10/23/2025
Special inspection requirement — Fenestration areas
Shahrish Shuvo
10/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
10/23/2025
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
10/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
09/16/2025
Signed off — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01125060-I1
B01125060-S5
08/21/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/14/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/01/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/29/2025
Special inspection requirement — Maintenance information
Shahrish Shuvo
07/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
07/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
07/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
07/24/2025
Signed off — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01125060-I1
B01125060-S1
07/22/2025
Objection resolved — Addressed
07/14/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/10/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/30/2025
Signed off — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01125060-I1
B01125060-S3
06/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/24/2025
Objection raised — Cost
06/12/2025
Objection resolved — Addressed
06/03/2025
Objection raised — Scope
05/22/2025
Filed — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01125060-I1
B01125060-P5
05/21/2025
Filed — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01125060-I1
B01125060-P6
05/15/2025
Permit issued — Sprinklers
B01125060-S1-EW-SP
Latest 60 of 148 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offARCO PLBG AND HTG INC05/15/2025
DOB NOWPlumbingSigned-offPIPE SOLUTIONS ADVIS INC04/25/2025
DOB NOWGeneral ConstructionPermit IssuedREVAMP NYC CORP04/23/2025
DOB NOWBoiler EquipmentSigned-offPIPE SOLUTIONS ADVIS INC03/19/2025
DOB NOWSprinklersSigned-offBLETSAS P&H CORP03/14/2025
DOB NOWMechanical SystemsSigned-offREVAMP NYC CORP03/10/2025
DOB NOWGeneral ConstructionPermit IssuedREVAMP NYC CORP03/05/2025
1 project · most recent 10/23/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/23/2025Permit IssuedREVAMP NYC CORPVentilation Systems
Ventilation
Delta Breeze ITG100 100 CFM · Exhaust Fan ×9
SLM50 50 CFM · Exhaust Fan ×9
1 project · most recent 10/23/2025
Sprinkler System
FiledStatusContractorScope
10/23/2025Signed-offARCO PLBG AND HTG INCSprinkler System
1 project · most recent 10/23/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/23/2025Signed-offDOUBLE SOLUTIONS INCGas, Water/Sanitary
1 project · most recent 08/18/2025
General Wiring
FiledStatusContractorScope
08/18/2025CompleteWIRED RIGHT ELECTRICAL INGeneral Wiring
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
04/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/25/2026Certified Storm Drainage-ST-Piping-Water TestCertifiedView ↗
08/21/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/14/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/01/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/14/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/13/2025Fail-Final Boiler Equipment InspectionFailView ↗
05/12/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/07/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 90
DateRequirementInspectorRole
11/24/2025Permanent certificateShahrish Shuvoenergy_progress
11/24/2025MeteringShahrish Shuvoenergy_progress
11/24/2025Energy Code Compliance InspectionsShahrish Shuvoprogress
11/24/2025Fire-Resistance Rated ConstructionShahrish Shuvoprogress
11/24/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
11/24/2025Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
11/24/2025Interior lighting powerShahrish Shuvoenergy_progress
11/24/2025Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
11/24/2025Fenestration air leakageShahrish Shuvoenergy_progress
11/24/2025Maintenance informationShahrish Shuvoenergy_progress
11/24/2025Insulation placement and R valuesShahrish Shuvoenergy_progress
11/24/2025Air barrier - visual inspectionShahrish Shuvoenergy_progress
11/24/2025Fenestration areasShahrish Shuvoenergy_progress
10/23/2025Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
10/23/2025MeteringShahrish Shuvoenergy_progress
10/23/2025Maintenance informationShahrish Shuvoenergy_progress
10/23/2025Interior lighting powerShahrish Shuvoenergy_progress
10/23/2025Fenestration air leakageShahrish Shuvoenergy_progress
10/23/2025Fenestration areasShahrish Shuvoenergy_progress
10/23/2025Air barrier - visual inspectionShahrish Shuvoenergy_progress
10/23/2025Insulation placement and R valuesShahrish Shuvoenergy_progress
10/23/2025Permanent certificateShahrish Shuvoenergy_progress
10/23/2025Fire-Resistance Rated ConstructionShahrish Shuvoprogress
10/23/2025Energy Code Compliance InspectionsShahrish Shuvoprogress
10/23/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
Latest 25 of 90.
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/22/2026B01125060-P4Request digital key ↗
08/22/2026B01125060-P3Request digital key ↗
08/22/2026B01125060-P7Request digital key ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications40
▸DOB NOWProgress Inspector Seal & Signature17
09/28/2026B01125060-S2Open ↗
09/28/2026B01125060-S2Open ↗
09/23/2026B01125060-S5Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/13/2026B01125060-P5Open ↗
08/13/2026B01125060-I1Open ↗
08/13/2026B01125060-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/28/2026B01125060-S2Open ↗
09/23/2026B01125060-S5Open ↗
08/29/2026B01125060-P3Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/13/2026B01125060-I1Open ↗
08/13/2026B01125060-P7Open ↗
08/13/2026B01125060-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/13/2026B01125060-P7Open ↗
08/13/2026B01125060-P1Open ↗
08/13/2026B01125060-P6Open ↗
Showing 3 of 12 on file for this type
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/13/2026B01125060-P1Open ↗
08/13/2026B01125060-P7Open ↗
08/13/2026B01125060-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B01125060-I1Open ↗