← Back
Factory, heavy manufacturing, fireproof
10203 AVENUE D
BROOKLYN · BIN 3083084
💬 Discuss this project
1968Year Built
1Stories
F1Building Class
M1-1Zoning
195,000 sfGross Floor Area
2Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Factory, heavy manufacturing, fireproof · Owner of record: CENTERPOINT FLATLANDS LLC · 316,350 sf lot · 0.62 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Roof6p · 4 filings · 20 docs
Floor 18p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CENTERPOINT PROPERTIES2108/26/2026
RENTAR DEVELOPMENT907/08/2026
CENTERPOINT FLATLANDS LLC103/22/2026
LAURA REALTY CO. RENTAR D203/22/2026
LAURA REALTY6703/22/2026
REMSEN REALTY ASSOC403/21/2026
CBRE203/21/2026
SETCO203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WEST AZE803/21/2026
MICHAEL MUROFF ARCHITECT LLC203/21/2026
CONVERSANO ASSOCIATES, INC.603/21/2026
BURNHAM NATIONWIDE INC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRENDLINE CONSTRUCTION C*General Contractor603/21/2026
RENTAR DEVELOPMENT CORPGeneral Contractor507/08/2026
N Y SIGN ARTScaffold407/08/2026
STEFENO BUSCARNERAElectrical203/21/2026
A.D. WINSTON SERVICE INCGeneral Contractor108/26/2026
CASE PLUMBING LLCFire Protection107/08/2026
MICHAEL MUROFFElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851107/21/2026
RYAN SPECIAL ENGINEERING2018103/13/2026
MEP INSPECTIONS, INC1102202/02/2026
GREGORY V. PEROTTO, P.E.947202/02/2026
METRIC CONSULTING AND INS1803101/30/2026
ARCHITECTURAL CONCEPT3642401/30/2022
PRAINITO ARCHITECT P.C.7432401/30/2022
PSI AGENCY INC.254107/09/2021
BUILDTECH ENGINEERING6369102/12/2020
DANNY'S SUPER DOLLAR INC.6586102/11/2020
Building Lifecycle
All (147)Filed (16)Permit Issued (10)Signed Off (7)Violation (50)Objection (34)Special Inspection (30)
08/18/2026
Permit issued — Mechanical Systems
B01427290-I1-MS
07/21/2026
Filed — Alteration
REPLACE TWO HVAC UNITS.
B01427290-I1
07/08/2026
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
07/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
07/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
07/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
07/08/2026
Special inspection requirement — Maintenance information
LOUIS ARENA
07/07/2026
Special inspection requirement — Mechanical Systems
LOUIS ARENA
07/07/2026
Special inspection requirement — Final
LOUIS ARENA
05/13/2026
Special inspection requirement — Air barrier - visual inspection
William Ryan
04/20/2026
Objection resolved — Resolved
04/17/2026
Objection raised — Cost
04/07/2026
Objection resolved — Addressed
04/07/2026
Objection resolved — Addressed
04/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Ryan
04/01/2026
Objection resolved — Addressed
03/31/2026
Objection resolved — Addressed
03/27/2026
Objection resolved — Addressed
03/26/2026
Objection raised — Mechanical
03/26/2026
Objection raised — Admin
03/26/2026
Objection raised — Structural
03/26/2026
Objection raised — Cost
03/26/2026
Objection raised — Energy
03/26/2026
Objection raised — Inspections
03/26/2026
Objection raised — Electrical
03/19/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/13/2026
Filed — Alteration
B01359180-I1
02/12/2026
Objection raised — Scope
02/12/2026
Objection raised — Structural
02/12/2026
Objection raised — Admin
02/12/2026
Objection raised — Fire_Protection
02/12/2026
Objection raised — Structural
02/12/2026
Objection raised — Admin
02/12/2026
Objection raised — Structural
02/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
02/12/2026
Special inspection requirement — Final
William Ryan
02/12/2026
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
02/11/2026
Objection raised — Cost
02/11/2026
Objection raised — Admin
02/11/2026
Objection raised — Other
02/11/2026
Objection raised — Admin
02/11/2026
Objection raised — Cost
02/02/2026
Filed — Alteration
INTERIOR RENOVATIONS AND ADDITION OF AN EXTERIOR ACCESSIBLE RAMP AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01346334-S1
02/02/2026
Filed — Alteration
INTERIOR RENOVATIONS AND ADDITION OF AN EXTERIOR ACCESSIBLE RAMP AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01346334-S2
01/30/2026
Filed — Alteration
INTERIOR RENOVATIONS AND ADDITION OF AN EXTERIOR ACCESSIBLE RAMP AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01346334-I1
01/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
01/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Gregory Perotto
01/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Gregory Perotto
01/20/2026
Special inspection requirement — Ventilation and air distribution system
Gregory Perotto
01/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
01/19/2026
Special inspection requirement — Post-installed Anchors
Nicolas Crosetto
01/19/2026
Special inspection requirement — Post-installed Anchors
Nicolas Crosetto
01/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
Latest 60 of 147 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedA.D. WINSTON SERVICE INC08/18/2026
DOB NOWSignSigned-offSKANSKA BUILDING INC10/28/2022
DOB NOWSignSigned-offSKANSKA BUILDING INC10/27/2022
DOB NOWMechanical SystemsSigned-offRENTAR DEVELOPMENT CORP05/02/2022
DOB NOWSignSigned-offSKANSKA BUILDING INC12/27/2021
DOB NOWSignSigned-offSKANSKA BUILDING INC12/27/2021
DOB NOWStructuralSigned-offTRENDLINE CONSTRUCTION C*07/19/2021
DOB NOWMechanical SystemsSigned-offTRENDLINE CONSTRUCTION C*05/26/2021
DOB NOWMechanical SystemsSigned-offRENTAR DEVELOPMENT CORP06/18/2020
DOB NOWSprinklersSigned-offS & L PLUMBING INC03/20/2020
BIS—ISSUEDRENTAR DEVELOPMENT CORP10/16/2020
BISOTISSUEDRENTAR DEVELOPMENT CORP09/17/2020
BISOTISSUEDRENTAR DEVELOPMENT CORP02/19/2020
BISPLISSUEDDRILON PLBG & HTG INC04/17/2019
BISOTISSUEDRENTAR DEVELOPMENT CORP03/18/2019
BISPLISSUEDCITY/SUBURBAN PLBG CORP05/04/2018
BISMHISSUEDRENTAR DEVELOPMENT CORP09/21/2015
BISMHISSUEDBEN'S HOME IMPROVEMENT IN09/10/2015
BISMHISSUEDRENTAR DEVELOPMENT CORP06/02/2015
BISPLISSUEDCITY/SUBURBAN PLBG CORP05/14/2015
BISPLISSUEDACE-ATLAS PLBING & HTG11/28/2014
BISBLISSUEDACE-ATLAS PLBING & HTG11/28/2014
BISOTISSUEDPAL ENVIRONMENTAL SAFETY10/27/2014
BISOTISSUEDRENTAR DEVELOPMENT CORP09/19/2014
BISOTISSUEDRENTAR DEVELOPMENT CORP06/09/2014
BISOTISSUEDCARE ENTERPRISES, INC02/26/2014
BISPLISSUEDJD MASTERS PLBG & HTG11/24/2010
BISPLISSUEDN KOFSKY & SON INC11/15/2010
BISFBISSUEDN KOFSKY & SON INC11/15/2010
BISSPISSUEDPAT SEMENTA P&H CO INC11/05/2010
BISBLISSUEDKOFSKY & SON, INC11/17/2009
BISPLISSUEDPAT SEMENTA P & H CO INC09/30/2009
BISSPISSUEDPAT SEMENTA P&H CO INC06/18/2009
BISOTISSUEDCOGENERATION CONTRACTORS05/21/2009
BISOTISSUEDCOGENERATION CONTRACTORS05/14/2009
BISPLISSUEDPAT SEMENTA P & H CO INC03/27/2009
BISSPISSUEDPAT SEMENTA P&H CO INC03/27/2009
BISPLISSUEDVARSITY PLBG & HTG INC03/18/2009
BISMHISSUEDASTORIA MECH CORP02/19/2009
BISSPISSUEDPAT SEMENTA P&H CO INC04/28/2008
+ 20 more permits on file
2 projects · most recent 07/21/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/21/2026Permit IssuedA.D. WINSTON SERVICE INCAir Conditioning Systems, Heating Systems
Cooling
Goodman AMST60DU1300 60,000 BTU · Ahu ×2
GLXS4BA6010 60,000 BTU · Condensing Unit ×2
Heating
Goodman HKTSD20DB 68,200 BTU · Furnace ×2
02/02/2026——Air Conditioning Systems
Cooling
Goodman GLXS5BN60 60,000 BTU · Furnace ×2
8 projects · most recent 02/17/2022
General Wiring
FiledStatusContractorScope
02/17/2022CancelledALL PRO ELEC. OF N.Y. INC—
02/17/2022CancelledALL PRO ELEC. OF N.Y. INC—
11/01/2021CompleteRAINBOW ELECTRIC CO., INCGeneral Wiring
11/01/2021CompleteRAINBOW ELECTRIC CO., INCGeneral Wiring
11/01/2021CompleteRAINBOW ELECTRIC CO., INCGeneral Wiring
01/13/2021CompleteMAC ELECT'L CONTR. INC.General Wiring
10/01/2020CompleteRAINBOW ELECTRIC CO., INCGeneral Wiring
12/26/2017CompleteELECTROTEC OF NY ELECL IN—
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
07/08/2026Energy Code Compliance InspectionsLOUIS ARENAprogress
07/08/2026HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
07/08/2026HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
07/08/2026HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
07/08/2026Maintenance informationLOUIS ARENAenergy_progress
07/07/2026Mechanical SystemsLOUIS ARENAspecial
07/07/2026FinalLOUIS ARENAprogress
05/13/2026Air barrier - visual inspectionWilliam Ryanenergy_progress
04/02/2026Structural Stability – Alterations of existing buildingsWilliam Ryanspecial
02/12/2026Fire-Resistant Penetrations and JointsWilliam Ryanspecial
02/12/2026FinalWilliam Ryanprogress
02/12/2026Energy Code Compliance InspectionsWilliam Ryanprogress
01/20/2026HVAC-R and service water heating equipmentGregory Perottoenergy_progress
01/20/2026Energy Code Compliance InspectionsGregory Perottoprogress
01/20/2026HVAC-R and service water piping design and insulationGregory Perottoenergy_progress
01/20/2026Ventilation and air distribution systemGregory Perottoenergy_progress
01/20/2026HVAC-R and service water heating system controlsGregory Perottoenergy_progress
01/19/2026Post-installed AnchorsNicolas Crosettospecial
01/19/2026Post-installed AnchorsNicolas Crosettospecial
01/19/2026Fire-Resistant Penetrations and JointsGregory Perottospecial
01/19/2026Fire-Resistant Penetrations and JointsGregory Perottospecial
01/14/2026Sprinkler SystemsGregory Perottospecial
01/14/2026Mechanical SystemsGregory Perottospecial
01/14/2026FinalGregory Perottoprogress
10/26/2022FinalDAMIR RAHMANprogress
Latest 25 of 37.
▾Documents — 440 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch14
09/01/2026B00489155-P3Request digital key ↗
09/01/2026B00489155-P2Request digital key ↗
09/01/2026B00489155-S1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00302387-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00304504-I1Request digital key ↗
▸Applications & Permits90
▸BISPLAN / WORK APPROVAL APPLICATION52
03/24/2023321589517Open ↗
03/10/2023321589517Open ↗
03/08/2023321589517Open ↗
Showing 3 of 52 on file for this type
▸BISWORK PERMIT APPLICATION33
10/16/2020321589517Open ↗
02/26/2020340710886Open ↗
02/22/2020340710886Open ↗
Showing 3 of 33 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
11/27/2019321928731Open ↗
06/15/2018320960448Open ↗
▸BISApplication Withdrawal/Address Change Form OP-1131
09/29/2021301524232Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/21/2020321589517Open ↗
▸BISREQUEST FOR CERTIFICATE OF OCCUPANCY WITH OPEN APPLICATION(S)1
03/30/2023321589517Open ↗
▸Seals & Professional Certifications96
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION37
02/26/2020340710886Open ↗
02/21/2020321928731Open ↗
02/21/2020321928731Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/01/2026B00489155-I1Open ↗
09/01/2026B00489155-P3Open ↗
09/01/2026B00489155-S1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026B00489155-I1Open ↗
09/01/2026B00489155-I1Open ↗
09/01/2026B00585168-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/02/2026B01346334-S2Open ↗
09/02/2026B01346334-S2Open ↗
09/01/2026B00489155-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
04/26/2018321743501Open ↗
08/07/2015321171913Open ↗
05/12/2015321019367Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
04/26/2018321743501Open ↗
08/07/2015321171913Open ↗
05/12/2015321019367Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISProfessional and Owner Certification (POC3)2
12/02/2014321034929Open ↗
12/02/2014321034929Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/23/2019340710886Open ↗
▸Trade Schedules & Equipment40
▸BISSCHEDULE B - PLUMBING13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSELF-CERT PLUMBING NOTICE9
06/15/2015321019367Open ↗
Showing 1 of 9 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT7
06/06/2016321171913Open ↗
08/07/2015321171913Open ↗
04/24/2015321115850Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
03/06/2019321928731Open ↗
04/26/2018321743501Open ↗
05/12/2015321019367Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
08/20/2015321034929Open ↗
12/02/2014321034929Open ↗
Showing 2 of 3 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS2
06/06/2016321171913Open ↗
Showing 1 of 2 on file for this type
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
08/28/2020321589517Open ↗
08/14/2020321589517Open ↗
▸Environmental & Asbestos27
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/01/2026B00489155-I1Open ↗
09/01/2026B00489155-P2Open ↗
09/01/2026B00489155-P1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
03/06/2019321928731Open ↗
04/27/2018321743501Open ↗
08/07/2015321171913Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
12/23/2019340710886Open ↗
▸Energy Compliance28
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
02/26/2020340710886Open ↗
02/21/2020321928731Open ↗
02/21/2020321928731Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
11/04/2020340710886Open ↗
02/21/2020321928731Open ↗
01/11/2019321743501Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
11/04/2020340710886Open ↗
02/22/2020340710886Open ↗
12/23/2019340710886Open ↗
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/23/2023321589517Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00489155-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
05/20/2021340200099Open ↗
05/20/2021340200099Open ↗
11/04/2020340710886Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs56
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST19
07/07/2021340200099Open ↗
01/27/2021321589517Open ↗
12/04/2020321589517Open ↗
Showing 3 of 19 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
08/07/2015321171913Open ↗
05/12/2015321019367Open ↗
12/02/2014321034929Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)9
08/13/2026B00585168-I1Open ↗
08/13/2026B00489155-P1Open ↗
08/13/2026B00489155-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)6
08/13/2026B01346334-I1Open ↗
08/13/2026B00302387-I1Open ↗
08/13/2026B00489155-S1Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
03/24/2023321589517Open ↗
03/10/2023321589517Open ↗
03/08/2023321589517Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
03/30/2023321589517Open ↗
03/30/2023321589517Open ↗
08/14/2020321589517Open ↗
Showing 3 of 5 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)2
02/11/2020340710886Open ↗
10/27/2014340200099Open ↗
▸Cost, Insurance & Ownership41
▸BISCOST AFFIDAVIT40
05/20/2021340200099Open ↗
11/17/2020340710886Open ↗
02/28/2020321928731Open ↗
Showing 3 of 40 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/18/2023321589517Open ↗
▸Filing & Intake Forms34
▸BISEFILING COVER SHEET14
03/06/2019321928731Open ↗
04/27/2018321743501Open ↗
08/07/2015321171913Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION10
09/22/2020321589517Open ↗
08/28/2020321589517Open ↗
02/14/2020321928731Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM7
02/28/2020321928731Open ↗
02/21/2020321928731Open ↗
01/11/2019321743501Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
12/23/2019340710886Open ↗
Showing 1 of 3 on file for this type
▸Other Documents4
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
09/29/2021301524232Open ↗
08/14/2020321589517Open ↗
▸BISTCO - Supporting Documents1
03/10/2023321589517Open ↗
▸BISLAA - Supporting Documentation1
01/12/2018320960448Open ↗