ECB11/25/2025Failure to maintain building in code-compliant manner. Noted: facade at exp-1 in state of disrepair with loose stones and masonry finishes hanging over 1ST floor and basement entrances., repair and/replace$6K due
ECB11/25/2025Unlawful acts. Failure to comply with commissioner's order for summons # 39084377Y., comply with commissioner's order$2K due
ECB11/25/2025Unlawful acts. Failure to comply with commissioner's order for summons # 39128271H., comply with commissioner's order$2K due
ECB11/25/2025Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for summons #39103444X., file a certificate of correction$1K due
ECB11/25/2025Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for summons # 39155295X., file a certificate of correction$1K due
ECB11/25/2025Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for summons # 39089146J., file a certificate of correction$1K due
ECB11/25/2025Failure to maintain building in code-compliant manner. Noted: facade at exp-1 in state of dispepair with loose masonry finished hanging over 1ST floor and basement entrances. Previous vio #39155044L., repair an$2K due
ECB07/29/2025Failure to maintain building wall (s) or appurtenances. Noted: at time of inspection obderved at exposure 2 of premises defective and loose parapet wall coping bricks and missing motar joints, maintain exterior$25K due
ECB10/23/2024Work without a permit. At time of inspection, observed a metal balcony attached to the facade of the building at exposure #1. Balcony protrudes out above the main entrance of the building. However, no permit on$12K due
ECB01/11/2024Unlawfully continued work while on notice of a stop work order; noted: observed at time of re-inspection that work was 100% complete on all floors & occupied except for 1ST floor vs when full stop work order wa$5K due
ECB06/26/2023Unlawfully continued work while on notice of a stop work order; noted: observed 3 workers on site where 2 workers were installing a new ac unit at the cellar level. Full stop work order was issued on 04-21-23 a$5K due
ECB05/08/2023Work with-out permit at time of inspection observed 4 story building at the rear of the property exposure. # 3 erected 2 metal balcony approx. 10 w x 5' d on the exterior of 3RD floor & 4TH floor level. No reco$2K due
ECB04/21/2023At time of inspection, observed ongoing gut-out interior renovation work on the entire 4 story building without a permit. Obesrved 4 male workers on site. No permit issued or application filed per DOB record ex$2K due
ECB04/19/2023Failure to maintain building in code compliant manner.noted:exp 1 facade in state of severe disrepair.several large loose stone finishes have been removed,but there are still several loose concrete pieces loose$1K due
HPD02/25/2021§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY
HPD02/25/2021§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY
HPD12/30/2011§ 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. LOCATED AT APT 2, 2nd STORY
ECB11/25/2025Unlawful acts. Failure to comply with commissioner's order for summons# 39085798R., comply with commissioner's orderHearing held — result not yet published$2K proposed
ECB07/26/2025At time of inspection observed crack, bulging and displaced stucco in danger of falling at multiple locations of exp.1 (front of building)., repair and/replaceHearing held — result not yet published$6K proposed