← Back
Over six families without stores
1023 SUMMIT AVENUE
BRONX · BIN 2130724
💬 Discuss this project
2022Year Built
4Stories
C1Building Class
R7-1Zoning
4,565 sfGross Floor Area
7Units
Rent Stabilized10 Open Violations ▸
Over six families without stores · Owner of record: 1023 SUMMIT LLC · 2,188 sf lot · 2.09 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof65p · 2 filings · 20 docs
Floor 462p · 1 filing · 20 docs
Floor 360p · 1 filing · 20 docs
Floor 261p · 1 filing · 20 docs
Floor 162p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1023 SUMMIT AVENUE2007/08/2026
ACE GROUP NY407/08/2026
1023 SUMMIT LLC103/22/2026
DURGAJ PROPERTIES103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/22/2021$475K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KCE CONSULTING ENGINEERING PLLC609/05/2024
FL&M ENGINEERING DESIGN &INSPECTION101/03/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KC EXPEDITING INC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DURGAJ PROPERTIES CORPGeneral Contractor1407/08/2026
GO PRO FIRE PROTECTION CFire Protection207/08/2026
ACE GROUP NY CORPGeneral Contractor107/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KCE CONSULTING ENGINEERIN3712509/05/2024
Building Lifecycle
All (113)Filed (7)Permit Issued (13)Signed Off (4)Violation (1)Inspection (9)Objection (46)Special Inspection (30)Tax Incentive (3)
04/29/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/02/2025
Signed off — Alteration
Provide new plumbing and sprinkler system in conjunction with NB #X00685796.
X00773326-I1
01/13/2025
Signed off — New Building
New apartment building
X00685796-S1
09/10/2024
Special inspection requirement — Mechanical Systems
Kemba Walcott
09/10/2024
Special inspection requirement — HVAC-R and service water heating equipment
Kemba Walcott
09/10/2024
Special inspection requirement — Footing and Foundation
Kemba Walcott
09/10/2024
Special inspection requirement — Final
Kemba Walcott
09/10/2024
Special inspection requirement — Air barrier — testing
Kemba Walcott
09/10/2024
Special inspection requirement — Structural Cold-Formed Steel
Kemba Walcott
09/10/2024
Special inspection requirement — Fenestration air leakage
Kemba Walcott
09/10/2024
Special inspection requirement — Fenestration areas
Kemba Walcott
09/10/2024
Special inspection requirement — Vestibules
Kemba Walcott
09/10/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Kemba Walcott
09/10/2024
Special inspection requirement — Insulation placement and R values
Kemba Walcott
09/10/2024
Special inspection requirement — Structural Steel - Details
Kemba Walcott
09/10/2024
Special inspection requirement — Interior lighting power
Kemba Walcott
09/10/2024
Special inspection requirement — Exterior lighting power
Kemba Walcott
09/10/2024
Special inspection requirement — HVAC-R and service water heating system controls
Kemba Walcott
09/10/2024
Special inspection requirement — Shutoff dampers
Kemba Walcott
09/10/2024
Special inspection requirement — Metering
Kemba Walcott
09/10/2024
Special inspection requirement — Maintenance information
Kemba Walcott
09/10/2024
Special inspection requirement — Electrical motors and elevators
Kemba Walcott
09/10/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Kemba Walcott
09/10/2024
Special inspection requirement — Duct leakage testing, insulation and design
Kemba Walcott
09/10/2024
Special inspection requirement — Air barrier - visual inspection
Kemba Walcott
09/10/2024
Special inspection requirement — Lighting in dwelling units
Kemba Walcott
09/10/2024
Special inspection requirement — Lighting controls
Kemba Walcott
09/05/2024
Filed — New Building
New apartment building
X00685796-P5
09/05/2024
Special inspection requirement — Structural Cold-Formed Steel
Kemba Walcott
09/05/2024
Special inspection requirement — Mechanical Systems
Kemba Walcott
09/05/2024
Special inspection requirement — Structural Steel - Details
Kemba Walcott
09/05/2024
Special inspection requirement — Vestibules
Kemba Walcott
09/05/2024
Special inspection requirement — Final
Kemba Walcott
09/05/2024
Special inspection requirement — Footing and Foundation
Kemba Walcott
09/01/2024
485-x construction completed
08/28/2024
Permit issued — Mechanical Systems
X00685796-I1-GC-CX
08/13/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/09/2024
Permit issued — Support of Excavation
X00685796-S1-SE
07/31/2024
Filed — New Building
New apartment building
X00685796-P1
07/19/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/16/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/15/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/04/2024
485-x registration filed
07/03/2024
Signed off — Alteration
X00748850-I1
07/03/2024
Permit issued — Plumbing
X00773326-I1-EW-SP
08/28/2023
Permit issued — General Construction
X00685796-I1-GC-CX
08/09/2023
Permit issued — Construction Fence
X00748850-I1-FN
08/08/2023
Permit issued — General Construction
X00685796-I1-GC-CX
06/27/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/31/2023
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00802344-I1
04/06/2023
Violation issued (ECB, closed)
Construction
03/31/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/31/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/20/2023
Permit issued — Sprinklers
X00773326-I1-EW-SP
03/20/2023
Permit issued — Sprinklers
X00773326-I1-PL
01/03/2023
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00802344-I1
01/03/2023
Permit issued — Sidewalk Shed
X00802344-I1-SH
11/16/2022
Permit issued — Foundation
X00685796-I1-GC-CX
09/23/2022
485-x construction commenced
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedDURGAJ PROPERTIES08/28/2024
DOB NOWSupport of ExcavationSigned-offDURGAJ PROPERTIES08/09/2024
DOB NOWPlumbingSigned-offGO PRO FIRE PROTECTION C07/03/2024
DOB NOWGeneral ConstructionPermit IssuedDURGAJ PROPERTIES08/28/2023
DOB NOWConstruction FenceSigned-offDURGAJ PROPERTIES08/09/2023
DOB NOWGeneral ConstructionPermit IssuedDURGAJ PROPERTIES08/08/2023
DOB NOWSprinklersSigned-offGO PRO FIRE PROTECTION C03/20/2023
DOB NOWSprinklersSigned-offINFINITI ESC PLUMBING COR03/20/2023
DOB NOWSidewalk ShedSigned-offACE GROUP NY CORP01/03/2023
DOB NOWFoundationPermit IssuedDURGAJ PROPERTIES11/16/2022
DOB NOWFoundationPermit IssuedDURGAJ PROPERTIES09/03/2022
DOB NOWSupport of ExcavationSigned-offDURGAJ PROPERTIES08/30/2022
DOB NOWConstruction FenceSigned-offDURGAJ PROPERTIES08/08/2022
1 project · most recent 09/05/2024
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/05/2024Permit IssuedDURGAJ PROPERTIES CORPAssociated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Friedrich WET12A33A-C WET12A33A-D 83,300 BTU · Ptac ×20
Trane GPHM32441AA 24,600 BTU · Rooftop Unit ×2
4wcc4024a1000a 24,600 BTU · Condensing Unit ×1
Amana PTC 123G***XXX 83,300 BTU · Ptac ×7
PTC 093G***XXX 27,600 BTU · Ptac ×3
Ventilation
Trane GPHM32441AA 8,000 CFM · Rooftop Unit ×16
Ducts & Piping
Friedrich WET12A33A-C WET12A33A-D 8,000 CFM · Ductwork ×20
2 projects · most recent 05/11/2025
General Wiring
FiledStatusContractorScope
05/11/2025Permit IssuedACCURATE ELEC'L CORP.General Wiring
04/05/2023Permit IssuedICON ELECTRIC INCGeneral Wiring
1 project · most recent 09/05/2024
Steel
FiledStatusContractorScope
09/05/2024Permit IssuedDURGAJ PROPERTIES CORPSteel
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/29/2025Fail-Final General Construction Non-Directive 14FailView ↗
08/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/19/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/16/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/15/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/27/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/31/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/31/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 80
DateRequirementInspectorRole
09/10/2024Structural Steel - DetailsKemba Walcottspecial
09/10/2024Mechanical SystemsKemba Walcottspecial
09/10/2024Structural Cold-Formed SteelKemba Walcottspecial
09/10/2024Footing and FoundationKemba Walcottprogress
09/10/2024FinalKemba Walcottprogress
09/10/2024Insulation placement and R valuesKemba Walcottenergy_progress
09/10/2024Interior lighting powerKemba Walcottenergy_progress
09/10/2024Fenestration air leakageKemba Walcottenergy_progress
09/10/2024Fenestration areasKemba Walcottenergy_progress
09/10/2024VestibulesKemba Walcottenergy_progress
09/10/2024HVAC-R and service water piping design and insulationKemba Walcottenergy_progress
09/10/2024Lighting controlsKemba Walcottenergy_progress
09/10/2024HVAC-R and service water heating equipmentKemba Walcottenergy_progress
09/10/2024Exterior lighting powerKemba Walcottenergy_progress
09/10/2024Air barrier — testing Kemba Walcottenergy_progress
09/10/2024HVAC-R and service water heating system controlsKemba Walcottenergy_progress
09/10/2024Shutoff dampersKemba Walcottenergy_progress
09/10/2024MeteringKemba Walcottenergy_progress
09/10/2024Maintenance informationKemba Walcottenergy_progress
09/10/2024Electrical motors and elevatorsKemba Walcottenergy_progress
09/10/2024Fenestration and door U-factor and product ratingsKemba Walcottenergy_progress
09/10/2024Duct leakage testing, insulation and designKemba Walcottenergy_progress
09/10/2024Air barrier - visual inspectionKemba Walcottenergy_progress
09/10/2024Lighting in dwelling unitsKemba Walcottenergy_progress
09/05/2024Maintenance informationKemba Walcottenergy_progress
Latest 25 of 80.
▾Documents — 132 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026X00748850-I1Request digital key ↗
08/24/2026X00773326-I1Request digital key ↗
08/23/2026X00802344-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
01/26/2024240359009Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026X00685796-P1Open ↗
08/13/2026X00685796-I1Open ↗
08/13/2026X00685796-P5Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026X00685796-P1Open ↗
08/13/2026X00685796-I1Open ↗
08/13/2026X00685796-P5Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00685796-I1Open ↗
▸Seals & Professional Certifications88
▸DOB NOWProgress Inspector Seal & Signature64
08/29/2026X00685796-I1Open ↗
08/29/2026X00685796-I1Open ↗
08/29/2026X00685796-I1Open ↗
Showing 3 of 64 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/02/2026X00685796-S1Open ↗
09/02/2026X00685796-S1Open ↗
08/29/2026X00685796-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026X00748850-I1Open ↗
08/24/2026X00773326-I1Open ↗
08/21/2026X00685796-S1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/26/2024240359009Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026X00685796-P5Open ↗
08/13/2026X00685796-I1Open ↗
08/13/2026X00685796-P1Open ↗
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist3
08/13/2026X00685796-I1Open ↗
08/13/2026X00685796-P1Open ↗
08/13/2026X00685796-P5Open ↗
▸BISBPP: STREET TREES SITE PLAN1
04/26/2024240359009Open ↗
▸BISSTREET TREE CHECKLIST1
04/26/2024240359009Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00685796-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00685796-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00685796-I1Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026X00685796-I1Open ↗
08/13/2026X00773326-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00773326-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/26/2024240359009Open ↗
▸Other Documents14
▸DOB NOWSite Survey: Initial3
08/13/2026X00685796-I1Open ↗
08/13/2026X00685796-P5Open ↗
08/13/2026X00685796-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026X00685796-P1Open ↗
08/13/2026X00685796-P5Open ↗
08/13/2026X00685796-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/21/2026X00685796-P1Open ↗
08/21/2026X00685796-P5Open ↗
08/15/2026X00685796-I1Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
04/26/2024240359009Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
01/26/2024240359009Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00685796-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00685796-S1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026X00685796-I1Open ↗