New Bridges Elementary
1025 EASTERN PARKWAY · BIN 3037303
💬 Discuss this project
1907Year Built
5Stories
W1Building Class
R6Zoning
65,742 sfGross Floor Area
2Units
LL97 Covered10 Active Violations 5 unresolved · 5 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 44,000 sf lot · 1.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofP.S. 167-brooklynUnder Construction36p · 2 filings · 17 docs
Floor 4P.S. 167-brooklynUnder Construction31p · 3 filings · 18 docs
Floor 3P.S. 167-brooklynUnder Construction40p · 4 filings · 18 docs
Floor 2P.S. 167-brooklynUnder Construction30p · 3 filings · 18 docs
Floor 1P.S. 167-brooklynUnder Construction30p · 3 filings · 18 docs
CellarP.S. 167-brooklynUnder Construction32p · 1 filing · 17 docs
BasementProposed temporary egress for existing school building1p · 1 filing · 12 docs
Sub-BasementP.S. 167-brooklynUnder Construction31p · 4 filings · 18 docs
Site & exteriorP.S. 167-brooklyn, P.S. 167-brooklyncovidUnder Construction18p · 6 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority9508/13/2026
NYC Department of Education203/22/2026
NYC School103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STV604/16/2026
360 Engineering105/22/2025
AK Consulting Services911/20/2024
Loci Architecture209/16/2024
MD Szerbaty Associates Architecture311/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV Associates603/21/2026
AK Consulting Services1803/21/2026
STV1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dean Energy SolutionsScaffold2208/13/2026
Innovax-PillarGeneral Contractor1207/08/2026
Dean Energy SolutionsGeneral Contractor707/08/2026
Skyline Electrical ContractingElectrical203/21/2026
Lambo MechanicalScaffold203/21/2026
Charan Electrical Enterp'sElectrical203/22/2026
Acg Electrical ContractorsElectrical103/21/2026
Shriji CreationsGeneral Contractor104/11/2026
Ajit One Mechanical & General ContractingPlumbing107/08/2026
Pulsar ElectricElectrical103/21/2026
Christ Gatzonis Electric ConElectrical103/21/2026
Silver City LightingElectrical103/21/2026
E.N.E.L. ElectricalElectrical103/21/2026
Eldor ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Future Tech Consultants O589611/20/2024
Twin Peaks317209/16/2024
Socotec Engineering4983103/11/2021
Building Lifecycle
All (163)Filed (21)Permit Issued (29)Signed Off (3)Violation (60)Inspection (2)Objection (18)Special Inspection (30)
09/16/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/16/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/12/2026
Permit issued — Sidewalk Shed
B00808012-I1-SH
06/05/2026
Permit issued — General Construction
B01264714-I1-GC
04/17/2026
Permit issued — Sidewalk Shed
B00808012-I1-SH
04/16/2026
Filed — Alteration
K167_Temporary Egress Plans for LLW# 124513.
B01264714-P1
04/14/2026
Permit issued — Plumbing
B01101106-S1-PL
04/09/2026
Permit issued — General Construction
B01101106-I1-GC
04/02/2026
Permit issued — Supported Scaffold
B00806116-I1-SF
04/02/2026
Permit issued — Construction Fence
B00806111-I1-FN
03/23/2026
Violation issued (ECB, open)
Construction
03/23/2026
Violation issued (ECB, open)
Construction
03/23/2026
Violation issued (ECB, open)
Construction
03/23/2026
Violation issued (ECB, open)
Construction
03/20/2026
Permit issued — General Construction
B00482104-I1-GC-CX
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/08/2025
Violation issued (FDNY_ORDER, closed)
10/08/2025
Violation issued (FDNY_ORDER, closed)
10/08/2025
Violation issued (FDNY_ORDER, closed)
09/11/2025
Violation issued (FDNY_ORDER, closed)
09/11/2025
Violation issued (FDNY_ORDER, closed)
08/21/2025
Objection resolved — Addressed
08/13/2025
Objection raised — Other
08/05/2025
Filed — Alteration
K167_Temporary Egress Plans for LLW# 124513.
B01264714-I1
07/17/2025
Signed off — Alteration
P.S. 167-K: PROPOSED TEMPORARY EGRESS FOR AN EXISTING SCHOOL BUILDING.
B00673041-I1
07/15/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/26/2025
Objection resolved — Addressed
06/04/2025
Permit issued — General Construction
B00673041-I1-GC
06/03/2025
Signed off — Alteration
P.S. 167K: Proposing patching and repairing the existing masonry ramp walls and install new guardrails and handrails for an existing school building.
B00596309-I1
06/02/2025
Objection raised — Other
05/29/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/22/2025
Filed — Alteration
Scaffold mounted material hoists.
B01222787-I1
04/02/2025
Violation issued (ECB, open)
Construction
03/21/2025
Permit issued — Sidewalk Shed
B00808012-I1-SH
03/14/2025
Permit issued — General Construction
B00482104-I1-GC-CX
03/14/2025
Permit issued — Construction Fence
B00806111-I1-FN
03/14/2025
Permit issued — Supported Scaffold
B00806116-I1-SF
11/26/2024
Special inspection requirement — Post-installed Anchors
Noel Tolentino
11/20/2024
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD FOR PS 167K AT 1025 EASTERN PARKWAY, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00806116-P2
11/08/2024
Violation issued (FDNY_ORDER, closed)
11/08/2024
Violation issued (FDNY_ORDER, closed)
11/04/2024
Special inspection requirement — Post-installed Anchors
Noel Tolentino
09/16/2024
Filed — Alteration
B01101106-S1
09/16/2024
Filed — Alteration
B01101106-I1
08/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAXIM KORNGOLD
08/12/2024
Permit issued — Protection and Mechanical Methods
B01062252-I1-PMM
07/07/2024
Filed — Alteration
INSTALLATION OF DEBRIS CHUTE FOR PS 167K AT 1025 EASTERN PARKWAY, BROOKLYN AS PER INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01062252-I1
06/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2024
Permit issued — General Construction
B00673041-I1-GC
04/30/2024
Permit issued — General Construction
B00596309-I1-GC
04/25/2024
Permit issued — Sidewalk Shed
B00808012-I1-SH
04/25/2024
Permit issued — Supported Scaffold
B00806116-I1-SF
04/25/2024
Permit issued — Construction Fence
B00806111-I1-FN
03/20/2024
Permit issued — Structural
B00482104-I1-GC-CX
03/08/2024
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED FOR PS 167K AT 1025 EASTERN PARKWAY, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00808012-P1
03/08/2024
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 167K AT 1025 EASTERN PARKWAY, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00806111-P1
03/08/2024
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD FOR PS 167K AT 1025 EASTERN PARKWAY, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00806116-P1
05/02/2023
Permit issued — General Construction
B00673041-I1-GC
05/02/2023
Permit issued — General Construction
B00596309-I1-GC
Latest 60 of 163 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedDean Energy Solutions08/12/2026
DOB NOWGeneral ConstructionPermit IssuedDean Energy Solutions06/05/2026
DOB NOWSidewalk ShedPermit IssuedDean Energy Solutions04/17/2026
DOB NOWPlumbingPermit IssuedAjit One Mechanical & General Contracting04/14/2026
DOB NOWGeneral ConstructionPermit IssuedShriji Creations04/09/2026
DOB NOWSupported ScaffoldPermit IssuedDean Energy Solutions04/02/2026
DOB NOWConstruction FencePermit IssuedDean Energy Solutions04/02/2026
DOB NOWGeneral ConstructionPermit IssuedDean Energy Solutions03/20/2026
DOB NOWGeneral ConstructionSigned-offInnovax-Pillar06/04/2025
DOB NOWSidewalk ShedPermit IssuedDean Energy Solutions03/21/2025
DOB NOWGeneral ConstructionPermit IssuedDean Energy Solutions03/14/2025
DOB NOWConstruction FencePermit IssuedDean Energy Solutions03/14/2025
DOB NOWSupported ScaffoldPermit IssuedDean Energy Solutions03/14/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedDean Energy Solutions08/12/2024
DOB NOWGeneral ConstructionSigned-offInnovax-Pillar05/02/2024
DOB NOWGeneral ConstructionSigned-offInnovax-Pillar04/30/2024
DOB NOWSidewalk ShedPermit IssuedDean Energy Solutions04/25/2024
DOB NOWSupported ScaffoldPermit IssuedDean Energy Solutions04/25/2024
DOB NOWConstruction FencePermit IssuedDean Energy Solutions04/25/2024
DOB NOWStructuralPermit IssuedDean Energy Solutions03/20/2024
DOB NOWGeneral ConstructionSigned-offInnovax-Pillar05/02/2023
DOB NOWGeneral ConstructionSigned-offInnovax-Pillar05/02/2023
DOB NOWGeneral ConstructionPermit IssuedDean Energy Solutions05/01/2023
DOB NOWConstruction FencePermit IssuedDean Energy Solutions04/28/2023
DOB NOWSupported ScaffoldPermit IssuedDean Energy Solutions04/25/2023
DOB NOWSidewalk ShedPermit IssuedDean Energy Solutions04/18/2023
DOB NOWGeneral ConstructionSigned-offInnovax-Pillar01/12/2023
DOB NOWGeneral ConstructionSigned-offInnovax-Pillar12/07/2022
DOB NOWConstruction FenceSigned-offLambo Mechanical07/27/2021
BISOTISSUEDLambo Mechanical03/21/2023
BISMHISSUEDTameer08/31/2022
BISMHISSUEDLambo Mechanical05/24/2022
BISOTISSUEDLambo Mechanical05/19/2022
BISOTISSUEDM.S.T. General Contracting12/29/2021
BISOTISSUEDM.S.T. General Contracting12/29/2021
BISPLISSUEDFranco Belli PLMG & Heating Son12/23/2021
BISMHISSUEDLambo Mechanical07/27/2021
BISMHISSUEDTameer01/19/2021
BISOTISSUEDM.S.T. General Contracting11/05/2020
BISOTISSUEDM.S.T. General Contracting11/05/2020
+ 39 more permits on file
1 project · most recent 03/10/2023
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/10/2023Permit IssuedDean Energy SolutionsVentilation Systems
Ventilation
Trane CSAA050 25,000 CFM · Erv ×28
CSAA021 10,000 CFM · Ahu ×7
CSAA030 10,000 CFM · Erv ×7
Greenheck GB-100HP-5 500 CFM · Exhaust Fan ×14
18 projects · most recent 04/13/2026
General Wiring
FiledStatusContractorScope
04/13/2026Permit IssuedApex ElectricGeneral Wiring
06/27/2025CompleteEverest Electric—
02/07/2025CompleteEldor Electric—
10/15/2024Permit IssuedSkyline Electrical Contracting—
03/30/2023Permit IssuedSkyline Electrical ContractingGeneral Wiring
05/09/2022CompleteCharan Electrical Enterp's—
02/16/2022CompleteUrban ElectricalGeneral Wiring
01/18/2022CompleteTribeca ElectricalGeneral Wiring
08/17/2021CompleteAnco Electl ContctngGeneral Wiring
02/08/2021CompleteTribeca ElectricalGeneral Wiring
12/09/2019CompletePacific Electrical Contracting—
11/12/2018CompleteCharan Electrical Enterp'sGeneral Wiring
11/06/2018CompleteCharan Electrical Enterp'sGeneral Wiring
10/03/2018CompletePacific Electrical Contracting—
08/30/2018CancelledCharan Electrical Enterp'sGeneral Wiring
1 project · most recent 03/10/2023
Steel Concrete
FiledStatusContractorScope
03/10/2023Permit IssuedDean Energy SolutionsSteel, Concrete
3 projects · most recent 11/20/2024
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
11/20/2024Permit IssuedDean Energy SolutionsScaffold
03/08/2024Permit IssuedDean Energy SolutionsSidewalk Shed
03/08/2024Permit IssuedDean Energy SolutionsFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/15/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/29/2025Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
11/26/2024Post-installed AnchorsNoel Tolentinospecial
11/04/2024Post-installed AnchorsNoel Tolentinospecial
08/27/2024Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
03/14/2023HVAC-R and service water piping design and insulationNoel Tolentinoenergy_progress
03/14/2023HVAC-R and service water heating system controlsNoel Tolentinoenergy_progress
03/14/2023Maintenance informationNoel Tolentinoenergy_progress
03/14/2023FinalNoel Tolentinoprogress
03/14/2023Fire-Resistance Rated ConstructionNoel Tolentinoprogress
03/14/2023Energy Code Compliance InspectionsNoel Tolentinoprogress
03/14/2023Concrete - Cast-In-PlaceNoel Tolentinospecial
03/14/2023MasonryNoel Tolentinospecial
03/14/2023Structural Stability – Alterations of existing buildingsNoel Tolentinospecial
03/14/2023Structural Steel - WeldingNoel Tolentinospecial
03/14/2023Fire-Resistant Penetrations and JointsNoel Tolentinospecial
03/14/2023Structural Steel - DetailsNoel Tolentinospecial
03/14/2023Post-installed AnchorsNoel Tolentinospecial
03/14/2023Mechanical SystemsNoel Tolentinospecial
03/14/2023Structural Steel - High Strength BoltingNoel Tolentinospecial
03/14/2023Shutoff dampersNoel Tolentinoenergy_progress
03/14/2023Duct leakage testing, insulation and designNoel Tolentinoenergy_progress
03/09/2023FinalMichael Marcheseprogress
03/09/2023Concrete - Cast-In-PlaceNoel Tolentinospecial
03/09/2023Fire-Resistant Penetrations and JointsNoel Tolentinospecial
03/09/2023MasonryNoel Tolentinospecial
03/09/2023Mechanical SystemsNoel Tolentinospecial
Latest 25 of 71.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 167-brooklyncovidEducation—
Project B01062252 Alteration · Permit Entire · 07/07/2024
P.S. 167-brooklynEducationCellar, Sub-basement, Floors 1–4, Roof
Project B00806116 Alteration · Permit Entire · 01/16/2023
Project B00808012 Alteration · Permit Entire · 01/16/2023
Project B00806111 Alteration · Permit Entire · 01/14/2023
Project B01101106 Alteration · Permit Entire · 09/16/2024
Project B00552887 Alteration · LOC Issued · 07/14/2021
Project B00482104 Alteration · Permit Entire · 03/11/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 169 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
09/01/2026B00552887-I1Request digital key ↗
08/31/2026B00673041-I1Request digital key ↗
08/31/2026B00673041-P1Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION2
09/06/2012320548920Open ↗
08/07/2012320510452Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
09/06/2012320548920Open ↗
08/07/2012320510452Open ↗
▸Seals & Professional Certifications47
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/01/2026B00552887-I1Open ↗
09/01/2026B00596309-I1Open ↗
08/31/2026B00673041-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026B00482104-P2Open ↗
09/23/2026B00482104-P2Open ↗
08/28/2026B00482104-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
10/03/2026B00806116-P2Open ↗
09/23/2026B00482104-P2Open ↗
08/28/2026B00482104-P3Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
09/25/2017320510452Open ↗
09/25/2017320510452Open ↗
09/25/2017320548920Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
09/06/2012320548920Open ↗
08/07/2012320510452Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
09/06/2012320548920Open ↗
08/07/2012320510452Open ↗
▸Safety & Tenant Protection9
▸DOB NOWNYCSCA - Approved Site Safety Plans9
08/25/2026B00806116-I1Open ↗
08/25/2026B00806116-P1Open ↗
08/25/2026B00806116-P2Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/31/2026B00673041-P1Open ↗
08/31/2026B00673041-I1Open ↗
08/17/2026B01264714-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/14/2026B00596309-I1Open ↗
▸Approvals, Objections & Sign-offs53
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter22
09/01/2026B00552887-I1Open ↗
08/31/2026B00673041-I1Open ↗
08/31/2026B00673041-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)22
08/31/2026B00673041-P1Open ↗
08/31/2026B00673041-I1Open ↗
08/25/2026B00806116-P2Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/28/2026B00482104-I1Open ↗
08/13/2026B01101106-S1Open ↗
08/13/2026B01101106-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
09/25/2017320510452Open ↗
09/25/2017320548920Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
09/06/2012320548920Open ↗
08/07/2012320510452Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/31/2026B00673041-I1Open ↗
08/14/2026B00596309-I1Open ↗
▸Filing & Intake Forms5
▸BISBOROUGH INTAKE FORM2
09/25/2017320510452Open ↗
09/25/2017320548920Open ↗
▸BISEFILING COVER SHEET2
09/06/2012320548920Open ↗
08/07/2012320510452Open ↗
▸DOB NOWAI1 Form1
08/28/2026B00482104-I1Open ↗
▸Other Documents24
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal21
08/31/2026B00673041-P1Open ↗
08/31/2026B00673041-I1Open ↗
08/25/2026B00806116-P2Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWNYCSCA Exhibit 23
08/31/2026B00673041-I1Open ↗
08/14/2026B00596309-I1Open ↗
08/13/2026B00552887-I1Open ↗