← Back
BuildNYC
Walk-up cooperative
1025 LEGGETT AVENUE
BRONX · BIN 2005724
💬 Discuss this project
1924Year Built
6Stories
C6Building Class
R7-1Zoning
41,010 sfGross Floor Area
54Units
LL97 CoveredRent Stabilized5 Active Violations ▸
Walk-up cooperative · Owner of record: 1025-1027 Leggett Avenue HDFC · 10,124 sf lot · 4.05 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 51 filing · 2 docs
Floor 41 filing · 2 docs
Floor 31 filing · 2 docs
Floor 21 filing · 2 docs
Floor 11 filing · 2 docs
Cellar4p · 1 filing · 9 docs
Site & exteriorBronx sidewalk shed6p · 3 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1025-1027 Leggett Ave HDFC1003/22/2026
HDFC903/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Leder-Luis Architectural Design107/20/2023
Joel Phagoo P.E.103/23/2021
New York & Company106/03/2020
Ashraf207/10/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company203/21/2026
A1 Expediting Service203/21/2026
Danico Services403/21/2026
Leder-Luis Architectural Design103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Gul & G ContractingScaffold903/21/2026
Valentis ElectricElectrical603/21/2026
Builders-R-US ConstructionGeneral Contractor403/21/2026
BHB ConstructionGeneral Contractor103/21/2026
F T MechanicalPlumbing103/21/2026
Yarks NYCScaffold107/08/2026
WCK ElectricElectrical103/22/2026
Data WaterproofingGeneral Contractor105/07/2018
H.K. Mechanical ServicePlumbing210/16/2021
IronboGeneral Contractor204/28/2015
L.e.c.incGeneral Contractor107/03/2019
Polgano PlumbingPlumbing109/11/2019
Squan Construction ServicesGeneral Contractor106/22/2016
Unique Fire SystemsFire Protection110/21/2015
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851106/03/2020
Building Lifecycle
05/18/2026
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD violation · closed
04/17/2026
Boiler inspection report filed
Initial · no defects · Accepted
03/15/2026
§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT…
HPD violation · closed
03/15/2026
§ 27-2005 ADM code fire escape defective. Adjust the dropladder so that it will slide easily in the guide rods brick wall erected under drop ladder…
HPD violation · closed
03/15/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES AT VESTIBULE AT PUBLIC HALL, 1st STORY
HPD violation · closed
251 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offLeder-Luis Architectural Design08/29/2023
DOB NOWSupported ScaffoldSigned-offYarks NYC03/24/2021
DOB NOWSidewalk ShedSigned-offGul & G Contracting03/15/2021
DOB NOWBoiler EquipmentSigned-offApproved Oil Co of Brooklyn06/05/2020
DOB NOWSupported ScaffoldSigned-offGul & G Contracting07/11/2019
DOB NOWSidewalk ShedSigned-offGul & G Contracting07/09/2019
BISOTISSUEDBuilders-R-US Construction03/28/2023
BISOTISSUEDBuilders-R-US Construction04/06/2022
BISPLISSUEDH.K. Mechanical Service10/16/2021
BISOTISSUEDBuilders-R-US Construction04/05/2021
BISPLISSUEDH.K. Mechanical Service09/22/2020
BISOTISSUEDBuilders-R-US Construction03/27/2020
BISPLISSUEDPolgano Plumbing09/11/2019
BISOTISSUEDBuilders-R-US Construction08/20/2019
BISOTISSUEDL.e.c.inc07/03/2019
BISOTISSUEDData Waterproofing05/07/2018
BISPLISSUEDAura Plumbing02/14/2017
BISOTISSUEDSquan Construction Services06/22/2016
BISFPISSUEDUnique Fire Systems10/21/2015
BISPLISSUEDAura Plumbing05/29/2015
BISOTISSUEDIronbo04/28/2015
BISMHISSUEDIronbo04/28/2015
BISEQISSUEDB H & B Construction04/25/2014
BISFBISSUEDApproved Oil Co of Brooklyn02/14/2014
6 projects · most recent 12/16/2022
General Wiring Boiler Controls
FiledStatusContractorScope
12/16/2022CompleteValentis ElectricGeneral Wiring
12/16/2022CompleteValentis ElectricGeneral Wiring
05/10/2022CompleteDemand Electric—
12/15/2020CompleteDemand ElectricBoiler Controls
02/12/2020CompleteValentis ElectricGeneral Wiring
07/03/2019CompleteWCK Electric—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/06/2023Pass-Final General Construction Non-Directive 14PassView ↗
12/01/2023Fail-Final General Construction Non-Directive 14FailView ↗
11/15/2023Fail-Final General Construction Non-Directive 14FailView ↗
10/31/2023Fail-Final General Construction Non-Directive 14FailView ↗
10/23/2023Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
05/27/2020Heating SystemsLOUIS ARENAspecial
05/27/2020Maintenance informationLOUIS ARENAenergy_progress
05/27/2020HVAC and service water heating equipment LOUIS ARENAenergy_progress
05/27/2020HVAC and service water heating system controls LOUIS ARENAenergy_progress
07/01/2019FinalEric Fosterprogress
06/25/2019FinalEric Fosterprogress
206 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account