← Back
Miscellaneous two family
1026 BEDFORD AVENUE
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3055445
💬 Discuss this project
1901Year Built
4Stories
B9Building Class
R7AZoning
5,502 sfGross Floor Area
2Units
Rent Stabilized23 Open Violations ▸FDNY Report ↗
Miscellaneous two family · Owner of record: 1026 BEDFORD NY LLC · 2,000 sf lot · 2.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof24p · 1 filing · 20 docs
Penthouse23p · 1 filing · 20 docs
Floor 321p · 1 filing · 20 docs
Floor 221p · 1 filing · 20 docs
Floor 125p · 1 filing · 20 docs
Cellar26p · 1 filing · 20 docs
Basement21p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP907/08/2026
1026 BEDFORD NY LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/09/2023$2.7M—Private party → 1026 BEDFORD NY LLC$491/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PRAMODRAY SHAH, P.E.206/08/2026
VASILIOS ARTEMIOU PE604/15/2026
LESTER KATZ, NCARB405/29/2025
R & O ENGINEERING901/07/2025
PAUL PERDEK, PROF. ENG. PLLC410/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION803/21/2026
XPDITE GROUP LLC (104)1703/21/2026
XPDITE GROUP 1031303/21/2026
XPDITE GROUP LLC 104403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREENCO REMODELING & DESGeneral Contractor1907/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor607/08/2026
TARGET PIPING NY LLCFire Protection207/08/2026
B&B MECH PLBG & HTG LLCPlumbing207/08/2026
ABZ ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161706/08/2026
Building Lifecycle
All (182)Filed (24)Permit Issued (21)Signed Off (10)Violation (28)Inspection (5)Objection (64)Special Inspection (30)
06/30/2026
Violation issued (ECB, open)
Unknown
06/30/2026
Violation issued (ECB, open)
Cranes and Derricks
06/18/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL APPLICATION FILED HEREWITH TO ALT-CO APPLICATION #B00825011-I1
B00825011-I1
06/09/2026
Signed off — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION TO AN EXISTING THREE (3) STORY + CELLAR AND BASEMENT RESIDENTIAL BUILIDNG
B00832643-I1
06/08/2026
Filed — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION TO AN EXISTING THREE (3) STORY + CELLAR AND BASEMENT RESIDENTIAL BUILIDNG
B00832643-P1
06/08/2026
Special inspection requirement — Final
FAHAD FATEH
06/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
06/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/05/2026
Special inspection requirement — Final
06/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
06/03/2026
Permit issued — General Construction
B00832643-I1-GC
06/01/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL APPLICATION FILED HEREWITH TO ALT-CO APPLICATION #B00825011-I1
B00825011-S3
05/14/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL APPLICATION FILED HEREWITH TO ALT-CO APPLICATION #B00825011-I1
B00825011-S5
05/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
05/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
05/12/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
05/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/12/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
05/12/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
05/01/2026
Violation issued (HPD, open)
A
04/30/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL APPLICATION FILED HEREWITH TO ALT-CO APPLICATION #B00825011-I1
B00825011-S1
04/30/2026
Objection resolved — Resolved
04/29/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL APPLICATION FILED HEREWITH TO ALT-CO APPLICATION #B00825011-I1
B00825011-S2
04/29/2026
Objection raised — Admin
04/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
04/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
04/28/2026
Special inspection requirement — Shutoff dampers
FAHAD FATEH
04/28/2026
Special inspection requirement — Final
FAHAD FATEH
04/28/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/28/2026
Special inspection requirement — Mechanical Systems
FAHAD FATEH
04/28/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
04/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
04/28/2026
Special inspection requirement — Heating Systems
FAHAD FATEH
04/23/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL APPLICATION FILED HEREWITH TO ALT-CO APPLICATION #B00825011-I1
B00825011-S4
04/15/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL APPLICATION FILED HEREWITH TO ALT-CO APPLICATION #B00825011-I1
B00825011-P9
04/14/2026
Objection resolved — Resolved
04/08/2026
Objection raised — Admin
03/31/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/31/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/26/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/25/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/24/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL APPLICATION FILED HEREWITH TO ALT-CO APPLICATION #B00825011-I1
B00825011-P8
03/23/2026
Special inspection requirement — Final
FAHAD FATEH
03/23/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
03/23/2026
Special inspection requirement — Heating Systems
FAHAD FATEH
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/23/2026
Special inspection requirement — Mechanical Systems
FAHAD FATEH
03/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
03/19/2026
Signed off — Alteration
APPLICATION FILED HEREWITH FOR THE INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE
B00980386-I1
03/13/2026
Violation issued (ECB, closed)
Construction
03/13/2026
Violation issued (ECB, closed)
Construction
02/20/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01077180-I1
02/20/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01077170-I1
02/17/2026
Permit issued — Plumbing
B00825011-S3-PL
02/17/2026
Permit issued — Sprinklers
B00825011-S5-EW-SP
01/22/2026
Permit issued — General Construction
B00825011-I1-GC
Latest 60 of 182 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGREENCO REMODELING & DES06/03/2026
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC02/17/2026
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC02/17/2026
DOB NOWGeneral ConstructionPermit IssuedGREENCO REMODELING & DES01/22/2026
DOB NOWConstruction FenceSigned-offGREENCO REMODELING & DES01/20/2026
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC07/07/2025
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC06/27/2025
DOB NOWStructuralSigned-offGREENCO REMODELING & DES04/08/2025
DOB NOWEarth WorkSigned-offGREENCO REMODELING & DES04/03/2025
DOB NOWMechanical SystemsSigned-offGREENCO REMODELING & DES04/03/2025
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC02/11/2025
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC02/11/2025
DOB NOWGeneral ConstructionPermit IssuedGREENCO REMODELING & DES01/22/2025
DOB NOWConstruction FenceSigned-offGREENCO REMODELING & DES01/17/2025
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC07/09/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC07/09/2024
DOB NOWFoundationSigned-offGREENCO REMODELING & DES04/15/2024
DOB NOWStructuralSigned-offGREENCO REMODELING & DES04/08/2024
DOB NOWMechanical SystemsSigned-offGREENCO REMODELING & DES04/05/2024
DOB NOWConstruction FenceSigned-offGREENCO REMODELING & DES01/19/2024
DOB NOWGeneral ConstructionPermit IssuedGREENCO REMODELING & DES01/17/2024
1 project · most recent 04/15/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/15/2026Permit IssuedGREENCO REMODELING & DESHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NAM2 50,000 BTU · Heat Pump Outdoor ×8
MXZ-SM60NAM2 66,000 BTU · Heat Pump Outdoor ×2
PUZ-HA24NH 24,000 BTU · Heat Pump Outdoor ×2
Daikin RXSQ24TAVJU 51,000 BTU · Vrf Outdoor ×2
RXSQ48TAVJU 100,000 BTU · Vrf Outdoor ×2
RXSQ60TAVJU 114,500 BTU · Vrf Outdoor ×2
1 project · most recent 04/15/2026
Sprinkler System
FiledStatusContractorScope
04/15/2026Signed-offTARGET PIPING NY LLCSprinkler System
1 project · most recent 04/15/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/15/2026Signed-offB&B MECH PLBG & HTG LLCGas, Storm, Water/Sanitary
3 projects · most recent 06/17/2025
General Wiring
FiledStatusContractorScope
06/17/2025CompleteABZ ELECTRIC INCGeneral Wiring
07/11/2024CompleteSOLAS ELECTRICAL CORP—
01/25/2024CompleteABZ ELECTRIC INC—
1 project · most recent 04/15/2026
Steel Masonry
FiledStatusContractorScope
04/15/2026Signed-offB&B MECH PLBG & HTG LLCSteel, Masonry
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/31/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/31/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/26/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/25/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/02/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 86
DateRequirementInspectorRole
06/08/2026FinalFAHAD FATEHprogress
06/08/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/08/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
06/05/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/05/2026Final—progress
06/05/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
05/12/2026HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
05/12/2026HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/12/2026HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
05/12/2026Maintenance informationFAHAD FATEHenergy_progress
05/12/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/12/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
05/12/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
04/28/2026HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
04/28/2026HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
04/28/2026HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
04/28/2026Maintenance informationFAHAD FATEHenergy_progress
04/28/2026Heating SystemsFAHAD FATEHspecial
04/28/2026Mechanical SystemsFAHAD FATEHspecial
04/28/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/28/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
04/28/2026FinalFAHAD FATEHprogress
04/28/2026Shutoff dampersFAHAD FATEHenergy_progress
03/23/2026HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
03/23/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
Latest 25 of 86.
▾Documents — 145 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch24
08/27/2026B00825011-S3Request digital key ↗
08/27/2026B00825011-S2Request digital key ↗
08/27/2026B00825011-S1Request digital key ↗
Showing 3 of 24 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
07/07/2025340907460Open ↗
12/12/2023340907460Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
12/12/2023340907460Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00825011-I1Open ↗
08/13/2026B00825011-P5Open ↗
08/13/2026B00825011-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00825011-P1Open ↗
08/13/2026B00825011-P5Open ↗
08/13/2026B00825011-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00825011-I1Open ↗
▸Seals & Professional Certifications69
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/27/2026B00825011-S3Open ↗
08/27/2026B00825011-S2Open ↗
08/27/2026B00825011-S1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
09/26/2026B00825011-S7Open ↗
09/01/2026B00825011-P7Open ↗
09/01/2026B00825011-P7Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/26/2026B00825011-S7Open ↗
09/01/2026B00825011-P7Open ↗
09/01/2026B00825011-S1Open ↗
Showing 3 of 20 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/12/2023340907460Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B00825011-P1Open ↗
08/13/2026B00825011-I1Open ↗
08/13/2026B00825011-P5Open ↗
▸Safety & Tenant Protection5
▸BISBPP: STREET TREES SITE PLAN1
07/07/2025340907460Open ↗
▸BISSTREET TREE CHECKLIST1
12/12/2023340907460Open ↗
▸DOB NOWStreet Trees Site Plan1
08/27/2026B00825011-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/27/2026B00825011-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00825011-I1Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/27/2026B00825011-I1Open ↗
08/27/2026B00825011-S2Open ↗
08/27/2026B00825011-S1Open ↗
Showing 3 of 15 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026B00825011-P3Open ↗
08/13/2026B00825011-S8Open ↗
08/13/2026B00825011-S4Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00825011-S8Open ↗
08/13/2026B00825011-S4Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
12/12/2023340907460Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial3
08/13/2026B00825011-I1Open ↗
08/13/2026B00825011-P1Open ↗
08/13/2026B00825011-P5Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00825011-P1Open ↗
08/13/2026B00825011-I1Open ↗
08/13/2026B00825011-P5Open ↗
▸DOB NOWProperty Ownership Certification3
08/27/2026B00825011-I1Open ↗
08/27/2026B00825011-P5Open ↗
08/27/2026B00825011-P1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
07/07/2025340907460Open ↗
12/12/2023340907460Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00825011-S4Open ↗
▸DOB NOWFinal Survey1
08/27/2026B00825011-I1Open ↗