← Back
BuildNYC
Three families
1026 LELAND AVENUE
BRONX · BIN 2130447
💬 Discuss this project
2020Year Built
3Stories
C0Building Class
R5Zoning
3,363 sfGross Floor Area
3Units
4 Active Violations ▸FDNY Report ↗
Three families · Owner of record: Royal TP Group · 2,700 sf lot · 1.25 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire ProtectionCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 18 docs
Floor 3Sprinkler work, cellar and 1st floor12p · 3 filings · 20 docs
Floor 2Sprinkler work, cellar and 1st floor12p · 3 filings · 20 docs
Floor 1Sprinkler work, cellar and 1st floor15p · 4 filings · 20 docs
CellarSprinkler work, cellar and 1st floor15p · 3 filings · 20 docs
Site & exterior10p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Royal T&E3707/08/2026
Royal TP Group103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/15/2020$520K—Private party → ROYAL TP GROUP LLC— not available
02/20/2014$270K—PATMOS FELLOWSHIP INC. → Private party— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Pirooz Engineering809/08/2022
Arc Consulting Engineers102/27/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Preparer103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tan DevelopmentScaffold707/08/2026
Catman PlumbingPlumbing707/08/2026
Case PlumbingFire Protection307/08/2026
Tan DevelopmentGeneral Contractor303/22/2026
S S PlumbingPlumbing103/22/2026
Pirooz SoltanizadehElectrical103/21/2026
Tan Developmentspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Pirooz Engineering7177709/08/2022
Building Lifecycle
05/11/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
11/18/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
06/16/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
11/25/2024
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
09/16/2022
Signed off — Alteration
PLUMBING WORK TYPE FILED IN CONJUNCTION WITH APPLICATION JOB# 220724633
X00331729-I1
60 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offS & L Plumbing07/27/2022
DOB NOWSprinklersSigned-offS & L Plumbing07/12/2022
DOB NOWPlumbingSigned-offCatman Plumbing07/06/2022
DOB NOWCurb CutSigned-offTan Development10/30/2021
DOB NOWMechanical SystemsSigned-offTan Development10/29/2021
DOB NOWConstruction FenceSigned-offTan Development09/28/2021
DOB NOWConstruction FenceSigned-offTan Development08/25/2021
DOB NOWSprinklersSigned-offS & L Plumbing01/13/2021
DOB NOWPlumbingSigned-offCatman Plumbing01/11/2021
DOB NOWConstruction FenceSigned-offTan Development12/22/2020
DOB NOWConstruction FenceSigned-offTan Development09/18/2020
BIS—ISSUEDTan Development08/25/2021
BIS—ISSUEDTan Development09/29/2020
BIS—ISSUEDTan Development09/29/2020
1 project · most recent 06/15/2022
General Wiring
FiledStatusContractorScope
06/15/2022CompleteSKY ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/29/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
09/14/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
09/14/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesPIROOZ SOLTANIZADEHspecial
09/14/2022HVAC insulation and sealing PIROOZ SOLTANIZADEHenergy_progress
09/14/2022HVAC and service water heating equipment PIROOZ SOLTANIZADEHenergy_progress
09/14/2022HVAC and service water heating system controls PIROOZ SOLTANIZADEHenergy_progress
09/08/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
09/08/2022HVAC and service water heating equipment PIROOZ SOLTANIZADEHenergy_progress
09/08/2022HVAC insulation and sealing PIROOZ SOLTANIZADEHenergy_progress
09/08/2022HVAC and service water heating system controls PIROOZ SOLTANIZADEHenergy_progress
09/08/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesPIROOZ SOLTANIZADEHspecial
08/15/2022HVAC insulation and sealing PIROOZ SOLTANIZADEHenergy_progress
08/15/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
08/15/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesPIROOZ SOLTANIZADEHspecial
08/15/2022HVAC and service water heating system controls PIROOZ SOLTANIZADEHenergy_progress
08/15/2022HVAC and service water heating equipment PIROOZ SOLTANIZADEHenergy_progress
04/02/2021Sprinkler SystemsPIROOZ SOLTANIZADEHspecial
03/08/2021HVAC insulation and sealing PIROOZ SOLTANIZADEHenergy_progress
03/08/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesPIROOZ SOLTANIZADEHspecial
03/08/2021Sprinkler SystemsPIROOZ SOLTANIZADEHspecial
03/08/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
03/08/2021HVAC and service water heating equipment PIROOZ SOLTANIZADEHenergy_progress
03/08/2021HVAC and service water heating system controls PIROOZ SOLTANIZADEHenergy_progress
04/01/2020Shutoff dampersPIROOZ SOLTANIZADEHenergy_progress
04/01/2020Heating SystemsPIROOZ SOLTANIZADEHspecial
04/01/2020HVAC and service water heating equipment PIROOZ SOLTANIZADEHenergy_progress
Latest 25 of 30.
118 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account