Building facts
- Borough
- Brooklyn
- Year built
- 1929
- Stories
- 5
- Zoning
- C4-2
- Building class
- J2
Contractors and firms on permits
| Business | Jobs at this building |
|---|
| J & G Construction Svcs | 1 |
| Structual Presv System | 1 |
Work permits
| Issued | Work type | Status | Business | Description |
|---|
| 2026-05-21 | Supported Scaffold | Permit Issued | J & G Construction Svcs | PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS U… |
| 2025-06-05 | Suspended Scaffold | Signed-off | Structual Presv System | FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola |
Job filings
| Job | Filed | Type | Status |
|---|
| B01403433 | 2026-05-20 | Alteration | Permit Entire |
| B01229824 | 2025-06-04 | Alteration | LOC Issued |
Open violations
| Issued | Source | Type | Description |
|---|
| 2019-05-20 | dob | V-DOB VIOLATION - ACTIVE | FAILURE TO PERFORM CATEGORY 5 INSPECTION |
| 2019-04-05 | dob | V-DOB VIOLATION - ACTIVE | 2017 VIOS ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS (1 OR 2 FAMILY DWELLINGS) |
| 2017-05-01 | ecb | Boilers | 5B,38,50. 50-WIRES EXPOSED AT CIRCULATOR ON HWH. |
| 2017-02-24 | dob | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| 1997-01-13 | dob | V-DOB VIOLATION - ACTIVE | |
Source: NYC Department of Buildings filings, permits and violations. Sign in to BuildNYC for plans on file, inspections and the full building record.