← Back
BuildNYC
One story retail building
1028 BEACH 20TH STREET
QUEENS · BIN 4298257
💬 Discuss this project
1931Year Built
1Stories
K1Building Class
R6Zoning
5,300 sfGross Floor Area
4Units
0 Active ViolationsFDNY Report ↗
One story retail building · Owner of record: 6902 LLC · 6,829 sf lot · 0.78 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofDlenny Restaurant2p · 1 filing · 20 docs
Floor 1Dlenny Restaurant13p · 6 filings · 20 docs
CellarDlenny Restaurant12p · 3 filings · 20 docs
Site & exteriorDlenny Restaurant1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Postman Realty103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/05/2025$1.4M—POSTMAN REALTY, LLC → 6902 LLC$268/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kenny Lee Architect210/11/2024
Piro Studio806/19/2024
Nyron Hall Engineering103/31/2024
Franklyn Estrella Architect102/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Korman Design & Build403/21/2026
Jca & Associates1203/21/2026
Franklyn Estrella Architect303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Doval Plumbing & HeatingPlumbing407/08/2026
RR & VH PropertiesGeneral Contractor303/21/2026
Symmetrical ConstructionGeneral Contractor207/08/2026
Symmetrical ConstructionScaffold107/08/2026
DPH Plumbing & HeatingPlumbing107/08/2026
James Lewis Elect'lElectrical103/22/2026
L&J PLG & Heating Co of NYPlumbing107/08/2026
Morell BuildersGeneral Contractor104/09/2026
SJ EmpireGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection1519210/11/2024
Piro Studio7503806/19/2024
Building Lifecycle
All (82)Filed (12)Permit Issued (12)Signed Off (4)Violation (10)Inspection (6)Objection (8)Special Inspection (30)
09/09/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/06/2025
Permit issued — Plumbing
Q86697866-S1-PL
10/15/2025
Permit issued — General Construction
Q01102711-I1-GC
03/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/24/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/31/2025
Permit issued — General Construction
Q01102711-I1-GC
01/30/2025
Permit issued — Plumbing
Q01102711-S1-PL
12/23/2024
Violation issued (FDNY_ORDER, closed)
12/09/2024
Signed off — Alteration
PLUMBING APPLICATION TO INSTALL NEW COOKING EQUIPMENT (BROILER), NEW STEAM TABLE, NEW SINKS, NEW FLOOR DRAINS & RELOCATE STOVE & DEEP FRYER RELOC. TOILET IN THE FIRST FLOOR, RELOC. GT AND REPLACE HWH IN CEL. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRES
Q00457559-I1
12/06/2024
Objection resolved — Addressed
12/06/2024
Objection resolved — Addressed
10/16/2024
Objection raised — Other
10/15/2024
Objection raised — Other
10/11/2024
Filed — Alteration CO
INSTALLATION OF PLUMBING FIXTURES FOR 3 NEW RESTROOMS AT 2ND SPACE TO OBTAIN CHILDREN'S DAYCARE CO
Q01102711-S1
10/11/2024
Filed — Alteration CO
INSTALLATION OF PLUMBING FIXTURES FOR 3 NEW RESTROOMS AT 2ND SPACE TO OBTAIN CHILDREN'S DAYCARE CO
Q01102711-I1
08/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/28/2024
Special inspection requirement — Lighting controls
Andrew Inga
08/28/2024
Special inspection requirement — Interior lighting power
Andrew Inga
08/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/28/2024
Special inspection requirement — Energy Code Compliance Inspections
Andrew Inga
07/12/2024
Permit issued — Plumbing
Q00457559-I1-PL
06/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
06/21/2024
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
06/19/2024
Filed — Alteration
PLUMBING APPLICATION TO INSTALL NEW COOKING EQUIPMENT (BROILER), NEW STEAM TABLE, NEW SINKS, NEW FLOOR DRAINS & RELOCATE STOVE & DEEP FRYER RELOC. TOILET IN THE FIRST FLOOR, RELOC. GT AND REPLACE HWH IN CEL. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRES
Q00457559-P3
06/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
06/04/2024
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
05/29/2024
Objection raised — Other
05/21/2024
Signed off — Alteration
MECHANICAL APPLICATION TO INSTALL NEW HVAC SPLIT SYSTEM IN EXISTING EATING AND DRINKING ESTABLISHMENT. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS.
Q00467659-I1
04/08/2024
Objection raised — Other
03/31/2024
Filed — Alteration
Q01024825-I1
10/22/2023
Signed off — Alteration
INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH APPLICATION # Q00457283
Q00673721-I1
09/29/2023
Signed off — Alteration
INTERIOR RENOVATION FOR EXISTING EATING AND DRINKING ESTABLISHMENT. MODIFIED EXISTING COUNTER TO ACCOMMODATE NEW STEAM TABLE AND SINKS. INSTALL NEW COOKING EQUIPMENT, RELOCATION OF TOILET TO BE ADAPTABLE FOR HANDICAP... SEE SCOPE OF WORK ON PLANS.
Q00457283-I1
09/29/2023
Permit issued — Construction Fence
Q00673721-I1-FN
06/26/2023
Permit issued — Plumbing
Q00457559-I1-PL
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/12/2023
Filed — Alteration
PLUMBING APPLICATION TO INSTALL NEW COOKING EQUIPMENT (BROILER), NEW STEAM TABLE, NEW SINKS, NEW FLOOR DRAINS & RELOCATE STOVE & DEEP FRYER RELOC. TOILET IN THE FIRST FLOOR, RELOC. GT AND REPLACE HWH IN CEL. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRES
Q00457559-P2
03/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
03/28/2023
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
03/10/2023
Permit issued — Plumbing
Q00457559-I1-PL
03/10/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/15/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/19/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/15/2022
Special inspection requirement — Mechanical Systems
PIETRO ROSATO
03/15/2022
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
03/15/2022
Special inspection requirement — HVAC-R and service water heating equipment
PIETRO ROSATO
03/15/2022
Special inspection requirement — Duct leakage testing, insulation and design
PIETRO ROSATO
03/15/2022
Special inspection requirement — Maintenance information
PIETRO ROSATO
03/15/2022
Special inspection requirement — HVAC-R and service water heating system controls
PIETRO ROSATO
03/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
03/15/2022
Special inspection requirement — Final
PIETRO ROSATO
03/10/2022
Filed — Alteration
MECHANICAL APPLICATION TO INSTALL NEW HVAC SPLIT SYSTEM IN EXISTING EATING AND DRINKING ESTABLISHMENT. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS.
Q00467659-P1
03/09/2022
Filed — Alteration
PLUMBING APPLICATION TO INSTALL NEW COOKING EQUIPMENT (BROILER), NEW STEAM TABLE, NEW SINKS, NEW FLOOR DRAINS & RELOCATE STOVE & DEEP FRYER RELOC. TOILET IN THE FIRST FLOOR, RELOC. GT AND REPLACE HWH IN CEL. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRES
Q00457559-P1
03/09/2022
Special inspection requirement — Final
PIETRO ROSATO
03/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
03/09/2022
Special inspection requirement — Mechanical Systems
PIETRO ROSATO
03/09/2022
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
03/09/2022
Special inspection requirement — Maintenance information
PIETRO ROSATO
03/09/2022
Special inspection requirement — Duct leakage testing, insulation and design
PIETRO ROSATO
03/09/2022
Special inspection requirement — HVAC-R and service water heating equipment
PIETRO ROSATO
03/09/2022
Special inspection requirement — HVAC-R and service water heating system controls
PIETRO ROSATO
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offL&J PLG & Heating Co of NY11/06/2025
DOB NOWGeneral ConstructionPermit IssuedMorell Builders10/15/2025
DOB NOWGeneral ConstructionPermit IssuedRR & VH Properties01/31/2025
DOB NOWPlumbingPermit IssuedDPH Plumbing & Heating01/30/2025
DOB NOWPlumbingSigned-offDoval Plumbing & Heating07/12/2024
DOB NOWConstruction FenceSigned-offSymmetrical Construction09/29/2023
DOB NOWPlumbingSigned-offDoval Plumbing & Heating06/26/2023
DOB NOWPlumbingSigned-offDoval Plumbing & Heating03/10/2023
DOB NOWMechanical SystemsSigned-offSymmetrical Construction10/13/2021
DOB NOWGeneral ConstructionSigned-offSymmetrical Construction10/08/2021
DOB NOWPlumbingSigned-offDoval Plumbing & Heating07/21/2021
DOB NOWGeneral ConstructionSigned-offSJ Empire05/05/2021
BISFPISSUEDAll Bnoro Fire & Safety12/09/2005
BISPLISSUEDKamar Mechanical PLG08/15/2001
BISMHISSUEDAll Boro Fire & Safety07/23/2001
BISFPISSUEDAll-Boro Fire & Safety Equipment08/08/1995
1 project · most recent 10/11/2024
Water/Sanitary
FiledStatusContractorScope
10/11/2024Permit IssuedDPH Plumbing & HeatingWater/Sanitary
1 project · most recent 12/08/2025
General Wiring
FiledStatusContractorScope
12/08/2025CompleteJames Lewis Elect'lGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/09/2026Fail-Final CND-Occupancy InspectionFailView ↗
03/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/10/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
08/28/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/28/2024Lighting controlsAndrew Ingaenergy_progress
08/28/2024Interior lighting powerAndrew Ingaenergy_progress
08/28/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/28/2024Energy Code Compliance InspectionsAndrew Ingaprogress
06/21/2024Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
06/21/2024Energy Code Compliance InspectionsPIETRO ROSATOprogress
06/04/2024Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
06/04/2024Energy Code Compliance InspectionsPIETRO ROSATOprogress
03/28/2023Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
03/28/2023Energy Code Compliance InspectionsPIETRO ROSATOprogress
03/15/2022Mechanical SystemsPIETRO ROSATOspecial
03/15/2022Energy Code Compliance InspectionsPIETRO ROSATOprogress
03/15/2022HVAC-R and service water heating equipmentPIETRO ROSATOenergy_progress
03/15/2022Duct leakage testing, insulation and designPIETRO ROSATOenergy_progress
03/15/2022Maintenance informationPIETRO ROSATOenergy_progress
03/15/2022HVAC-R and service water heating system controlsPIETRO ROSATOenergy_progress
03/15/2022Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
03/15/2022FinalPIETRO ROSATOprogress
03/09/2022FinalPIETRO ROSATOprogress
03/09/2022Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
03/09/2022Mechanical SystemsPIETRO ROSATOspecial
03/09/2022Energy Code Compliance InspectionsPIETRO ROSATOprogress
03/09/2022Maintenance informationPIETRO ROSATOenergy_progress
03/09/2022Duct leakage testing, insulation and designPIETRO ROSATOenergy_progress
Latest 25 of 41.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Dlenny RestaurantRestaurant / Food ServiceCellar, Floor 1, Roof
Project Q00467659 Alteration · LOC Issued · 02/11/2021
Project Q00457559 Alteration · LOC Issued · 01/28/2021
Project Q00457283 Alteration · LOC Issued · 01/26/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 79 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch - Plumbing4
08/27/2026Q00457559-I1Request digital key ↗
08/27/2026Q00457559-P3Request digital key ↗
08/27/2026Q00457559-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch4
08/23/2026Q01024825-I1Request digital key ↗
08/21/2026Q01102711-S1Request digital key ↗
08/15/2026Q01102711-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
08/27/2026Q00457283-I1Request digital key ↗
08/27/2026Q00457283-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/27/2026Q00467659-I1Request digital key ↗
08/27/2026Q00467659-P1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01102711-I1Open ↗
▸Seals & Professional Certifications52
▸DOB NOWProgress Inspector Seal & Signature28
10/09/2026Q00457559-P3Open ↗
09/01/2026Q00467659-I1Open ↗
09/01/2026Q00467659-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/27/2026Q00457283-I1Open ↗
08/27/2026Q00457559-P2Open ↗
08/27/2026Q00457559-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
10/09/2026Q00457559-P3Open ↗
09/01/2026Q00467659-I1Open ↗
09/01/2026Q00467659-I1Open ↗
Showing 3 of 12 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/15/2026Q01102711-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/27/2026Q00457283-I1Open ↗
08/27/2026Q00457559-I1Open ↗
08/27/2026Q00457559-P2Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00467659-I1Open ↗
08/13/2026Q00457283-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/15/2026Q01102711-I1Open ↗