← Back
Elevator apt, miscellaneous
West Farms
1029 FREEMAN STREET · Crotona Park East · BIN 2010903
💬 Discuss this project
1931Year Built
6Stories
D9Building Class
R7-1Zoning
107,444 sfGross Floor Area
122Units
LL97 CoveredRent Stabilized2 Open Violations 1 unresolved · 1 paperwork only ▸FISP: SAFE
Elevator apt, miscellaneous · Owner of record: WEST FARMS ESTATES HOUSING DEVELOPMENT F UND CORPOR · 23,853 sf lot · 4.5 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WEST FARMS ESTATES HOUSING DEVELOPMENT F UND CORPOR303/22/2026
WEST FARMS ESTATES2003/22/2026
WEST FARM ESTATE COMPANY103/22/2026
METROPLITAN REALTY LLC503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM ENGINEERING SERVICES, PLLC105/07/2024
PVE ENGINEERING108/17/2022
CORNERSTONE ARCHITECTS107/05/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NORTHEAST EXPEDITING403/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LAWRENCE EXTERIOR RESTORATIONGeneral Contractor507/08/2026
KINGS BAY CONSTRUCTION*General Contractor307/08/2026
TRISTAR PLBG & HTG INCPlumbing303/22/2026
TRISTAR PLUMBING & HTG INPlumbing203/22/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor204/09/2026
VAN VASSELLElectrical103/21/2026
ROOPNARINE, RAULElectrical103/21/2026
RJ RUSSO ELECTRIC CO.Electrical103/22/2026
ANTOINE, JETHROElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LEO Y LEE ASSOCIATES2481108/17/2022
Building Lifecycle
All (91)Filed (4)Permit Issued (10)Signed Off (4)Facade (FISP) (6)Violation (60)Special Inspection (7)
04/30/2026
Violation issued (HPD, closed)
A
01/12/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01047074-I1
11/17/2025
Signed off — Alteration
Renewal of SR22/2142
X00971136-I1
10/14/2025
Cycle 10 facade report signed — SAFE
10/06/2025
Cycle 10 facade inspection completed
06/20/2025
Violation issued (ECB, closed)
Construction
06/11/2025
Cycle 10 facade report submitted
05/21/2025
Signed off — Alteration
EXTERIOR FACADE RESTORATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00741226-I1
05/06/2025
Permit issued — Sidewalk Shed
X01047074-I1-SH
04/19/2025
Violation issued (ECB, closed)
Construction
03/20/2025
Cycle 10 facade report submitted
03/20/2025
Cycle 10 facade report signed — UNSAFE
01/23/2025
Cycle 10 facade inspection completed
01/14/2025
Permit issued — Suspended Scaffold
X00971136-I1-SC
12/03/2024
Permit issued — Suspended Scaffold
X00971136-I1-SC
07/10/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/07/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01047074-I1
05/07/2024
Permit issued — Sidewalk Shed
X01047074-I1-SH
05/01/2024
Violation issued (ECB, open)
Construction
05/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2024
Permit issued — General Construction
X00741226-I1-GC
01/26/2024
Signed off — Alteration
MINOR APT RENOVATIONS TO INCL, EXIST'G CABINET & COUNTER RPLMT, NEW FLOORING OVER EXIST'G, AND INSTALL TRIM-STRIP AT EDGE WITH EXIST'G FLOORING AS PER PLANS. NO PARTITION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00741184-I1
01/24/2024
Permit issued — General Construction
X00741184-I1-GC
01/10/2024
Permit issued — Suspended Scaffold
X00971136-I1-SC
12/04/2023
Filed — Alteration
Renewal of SR22/2142
X00971136-I1
03/17/2023
Violation issued (HPD, closed)
A
01/18/2023
Permit issued — General Construction
X00741226-I1-GC
11/03/2022
Violation issued (HPD, closed)
I
08/22/2022
Permit issued — General Construction
X00741226-I1-GC
08/17/2022
Filed — Alteration
EXTERIOR FACADE RESTORATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00741226-I1
08/03/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2022
Permit issued — General Construction
X00741184-I1-GC
07/05/2022
Filed — Alteration
MINOR APT RENOVATIONS TO INCL, EXIST'G CABINET & COUNTER RPLMT, NEW FLOORING OVER EXIST'G, AND INSTALL TRIM-STRIP AT EDGE WITH EXIST'G FLOORING AS PER PLANS. NO PARTITION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00741184-I1
06/29/2022
Violation issued (HPD, closed)
B
06/29/2022
Violation issued (HPD, closed)
A
06/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/18/2022
Special inspection requirement — Masonry
Leo Lee
05/18/2022
Special inspection requirement — Post-installed Anchors
Leo Lee
05/18/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Leo Lee
05/18/2022
Special inspection requirement — Energy Code Compliance Inspections
ALAN DUDLEY
05/18/2022
Special inspection requirement — Final
ALAN DUDLEY
05/18/2022
Special inspection requirement — Air barrier - visual inspection
ALAN DUDLEY
05/18/2022
Special inspection requirement — Final
Mark Ellis
07/14/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/14/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/14/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/14/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/02/2021
Violation issued (HPD, closed)
A
01/08/2021
Violation issued (HPD, closed)
A
01/08/2021
Violation issued (HPD, closed)
A
05/20/2020
Violation issued (ECB, closed)
Boilers
05/20/2020
Violation issued (ECB, closed)
Boilers
02/16/2020
Violation issued (HPD, closed)
C
02/16/2020
Violation issued (HPD, closed)
B
02/16/2020
Violation issued (HPD, closed)
B
07/03/2019
Violation issued (HPD, closed)
B
07/03/2019
Violation issued (HPD, closed)
B
05/10/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/10/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/10/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC05/06/2025
DOB NOWSuspended ScaffoldSigned-offLAWRENCE EXTERIOR REST CO01/14/2025
DOB NOWSuspended ScaffoldSigned-offLAWRENCE EXTERIOR REST CO12/03/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC05/07/2024
DOB NOWGeneral ConstructionSigned-offLAWRENCE EXTERIOR RESTORA03/01/2024
DOB NOWGeneral ConstructionSigned-offKINGS BAY CONSTRUCTION*01/24/2024
DOB NOWSuspended ScaffoldSigned-offLAWRENCE EXTERIOR REST CO01/10/2024
DOB NOWGeneral ConstructionSigned-offLAWRENCE EXTERIOR RESTORA01/18/2023
DOB NOWGeneral ConstructionSigned-offLAWRENCE EXTERIOR RESTORA08/22/2022
DOB NOWGeneral ConstructionSigned-offKINGS BAY CONSTRUCTION*08/02/2022
BISPLISSUEDLAZERSHARP PLBG & HTG INC09/22/2021
BISOTISSUEDTHREE GUYS MAINTENANCE IN08/13/2021
BISOTISSUEDBEST ENERGY POWER 2015 LL08/17/2019
BISPLISSUEDLAZERSHARP PLBG & HTG INC09/20/2018
BISOTISSUEDTHREE GUYS MAINTENANCE IN07/18/2018
BISOTISSUEDCOURT RESTORATION INC08/26/2016
BISPLISSUEDORION PLUMBING & HTG CORP08/26/2016
BISEQISSUEDREPUBLIC SCAFFOLD&HOIST C06/10/2016
BISOTISSUEDLAWRENCE EXTERIOR RESTORATION05/17/2016
BISEQISSUEDREPUBLIC SCAFFOLD&HOIST C06/08/2015
BISOTISSUEDLAWRENCE EXTERIOR RESTORATION05/15/2015
BISOTISSUEDLAWRENCE EXTERIOR RESTORATION04/23/2015
BISBLISSUEDEAST COAST MECHANICAL LLC07/16/2014
BISPLISSUEDEAST COAST MECHANICAL LLC07/16/2014
BISEQISSUEDREPUBLIC SCAFFOLD&HOIST C06/02/2014
BISBLISSUEDEAST COAST PETROLEUM05/29/2002
BISPLISSUEDEAST COAST MECHANICAL LLC05/29/2002
BISPLISSUEDEAST COAST MECHANICAL LLC12/18/2001
BISBLISSUEDEAST COAST PETROLEUM12/15/2001
BISOTISSUEDHORAN CONSTRUCTION12/14/1999
2 projects · most recent 05/10/2024
FiledStatusContractorScope
05/10/2024CompleteBOROWIDE ELECT'L CONTR'S—
10/20/2019CompleteRJ RUSSO ELECTRIC CO.—
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
05/18/2022MasonryLeo Leespecial
05/18/2022Post-installed AnchorsLeo Leespecial
05/18/2022Structural Stability – Alterations of existing buildingsLeo Leespecial
05/18/2022Energy Code Compliance InspectionsALAN DUDLEYprogress
05/18/2022FinalALAN DUDLEYprogress
05/18/2022Air barrier - visual inspectionALAN DUDLEYenergy_progress
05/18/2022FinalMark Ellisprogress
▾Documents — 133 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026X00741184-I1Request digital key ↗
08/24/2026X00741226-I1Request digital key ↗
08/22/2026X00971136-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION14
06/17/2025220368947Open ↗
05/09/2025220368947Open ↗
02/16/2024220453006Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION13
09/23/2021220482305Open ↗
08/18/2021220482305Open ↗
08/17/2019240258154Open ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications22
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
08/24/2017240064540Open ↗
06/09/2016220482305Open ↗
06/09/2016220482305Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026X00741184-I1Open ↗
08/28/2026X00741226-I1Open ↗
08/28/2026X00741226-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
04/24/2015220453006Open ↗
07/15/2014240064540Open ↗
06/10/2014220368947Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/24/2026X00741226-I1Open ↗
08/13/2026X00741184-I1Open ↗
08/13/2026X01047074-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/24/2015220453006Open ↗
06/10/2014220368947Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/15/2014240064540Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/11/2019240258154Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/15/2014240064540Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026X00741226-I1Open ↗
▸Trade Schedules & Equipment10
▸BISPLUMBING - SUPPORTING DOCUMENTATION3
03/20/2015240064540Open ↗
03/20/2015240064540Open ↗
03/02/2015240064540Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
03/20/2015240064540Open ↗
03/02/2015240064540Open ↗
▸BISSCHEDULE B - PLUMBING1
07/15/2014240064540Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/09/2016220482305Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
03/20/2015240064540Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
07/11/2019240258154Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
07/15/2014240064540Open ↗
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES2
10/22/2021220482305Open ↗
07/11/2019240258154Open ↗
▸BISSTREET TREE CHECKLIST1
10/14/2015220482305Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
07/11/2019240258154Open ↗
08/26/2016220482305Open ↗
10/14/2015220482305Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026X00741226-I1Open ↗
08/13/2026X00741184-I1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
04/24/2015220453006Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
08/24/2017240064540Open ↗
08/26/2016220482305Open ↗
06/09/2016220482305Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
07/24/2023220482305Open ↗
01/14/2020240258154Open ↗
07/11/2019240258154Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
01/14/2020240258154Open ↗
08/24/2017240064540Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
07/11/2019240258154Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
01/14/2020240258154Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/15/2024220453006Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/15/2014240064540Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00741226-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
02/15/2024220453006Open ↗
07/24/2023220482305Open ↗
01/14/2020240258154Open ↗
Showing 3 of 5 on file for this type
▸BISBORINGS / TEST PITS (TR-4) 27-7201
08/04/2016220482305Open ↗
▸Approvals, Objections & Sign-offs13
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
08/05/2025220368947Open ↗
06/09/2025220368947Open ↗
03/05/2024220453006Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/14/2020240258154Open ↗
08/14/2019240258154Open ↗
08/24/2017240064540Open ↗
▸BISSHED LETTER2
06/24/2016220368947Open ↗
06/12/2015220368947Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
01/14/2020240258154Open ↗
▸BISFINAL1
02/15/2024220453006Open ↗
▸BISSUPERSEDING LETTER1
09/21/2018220482305Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT7
01/14/2020240258154Open ↗
08/14/2019240258154Open ↗
08/24/2017240064540Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/15/2024220453006Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION5
10/22/2021220482305Open ↗
01/07/2020240258154Open ↗
08/14/2019240258154Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET4
06/09/2016220482305Open ↗
10/14/2015220482305Open ↗
04/24/2015220453006Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
07/11/2019240258154Open ↗
07/15/2014240064540Open ↗
▸BISBOROUGH INTAKE FORM2
09/23/2021220482305Open ↗
08/18/2021220482305Open ↗
▸Other Documents4
▸BISPLOT DIAGRAM1
10/14/2015220482305Open ↗
▸BISTax Abatement Miscellaneous1
01/14/2020240258154Open ↗
▸DOB NOWCalculations1
08/13/2026X00971136-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X00971136-I1Open ↗