← Back
Two family frame
103-04 97 AVENUE
QUEENS · Ozone Park (North) · BIN 4197707
💬 Discuss this project
1910Year Built
2Stories
B2Building Class
R4-1Zoning
2,000 sfGross Floor Area
2Units
Two family frame · 2,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 25p · 2 filings · 19 docs
Floor 14p · 1 filing · 13 docs
Cellar4p · 2 filings · 19 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/31/2025$790K—Private party → Private party$395/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FARHAD BASSIRI-TEHRANI506/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor303/21/2026
KJK ELECTRIC INCElectrical103/22/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394306/23/2025
Building Lifecycle
All (21)Filed (5)Permit Issued (2)Signed Off (2)Inspection (6)Special Inspection (6)
07/17/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01179787-I1
07/15/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01179785-I1
07/14/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
06/26/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
06/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
06/23/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01179785-P2
06/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
06/23/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
06/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
06/10/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/05/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/30/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01179787-P1
05/30/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01179785-P1
04/24/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/13/2025
Permit issued — Plumbing
Q01179787-I1-PL
02/13/2025
Permit issued — General Construction
Q01179785-I1-GC
02/12/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01179787-I1
02/12/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01179785-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC02/13/2025
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC02/13/2025
1 project · most recent 02/14/2025
General Wiring
FiledStatusContractorScope
02/14/2025CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/14/2025Pass-Final General Construction Non-Directive 14PassView ↗
06/10/2025Fail-Final General Construction Non-Directive 14FailView ↗
06/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/24/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/24/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
06/26/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
06/26/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
06/26/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
06/23/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
06/23/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
06/23/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026Q01179787-P1Request digital key ↗
08/20/2026Q01179787-I1Request digital key ↗
08/19/2026Q01179785-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWRestrictive Declaration/Easement 15
08/13/2026Q01179787-I1Open ↗
08/13/2026Q01179785-P2Open ↗
08/13/2026Q01179787-P1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026Q01179787-P1Open ↗
08/20/2026Q01179787-I1Open ↗
08/13/2026Q01179785-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026Q01179785-P2Open ↗
08/24/2026Q01179785-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026Q01179785-P2Open ↗
08/24/2026Q01179785-I1Open ↗