← Back
Four families
103-06 35 AVENUE
QUEENS · BIN 4043378
💬 Discuss this project
1999Year Built
3Stories
C3Building Class
R5Zoning
3,277 sfGross Floor Area
4Units
Rent Stabilized0 Open Violations
Four families · 2,506 sf lot · 1.31 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Floor 3Under Construction3p · 1 filing · 15 docs
Floor 2Under Construction3p · 1 filing · 15 docs
Floor 1Under Construction3p · 1 filing · 15 docs
CellarUnder Construction4p · 1 filing · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YOU GAO112/04/2025
FANG ARCHITECT108/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INDESIGN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREAT ONE CONSTRUCTION LLGeneral Contractor204/09/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YOU GAO9407112/04/2025
FANG ARCHITECT5513108/18/2025
Building Lifecycle
All (32)Filed (2)Permit Issued (3)Signed Off (2)Violation (10)Inspection (8)Special Inspection (7)
05/07/2026
Signed off — Alteration CO
CAP/REMOVE (1)GAS METER & (1)BOILER AT CELLAR, CAP/REMOVE (1)STOVE & (1)KITCHEN SINK AT 3RD FLOOR.
Q01250721-I1
04/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/17/2026
Signed off — Alteration CO
CAP/REMOVE (1)GAS METER & (1)BOILER AT CELLAR, CAP/REMOVE (1)STOVE & (1)KITCHEN SINK AT 3RD FLOOR.
Q01250721-S1
04/17/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/07/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/23/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/18/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/20/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
01/07/2026
Permit issued — General Construction
Q01250721-I1-GC
12/12/2025
Permit issued — General Construction
Q01250721-I1-GC
12/08/2025
Permit issued — Plumbing
Q01250721-S1-PL
12/04/2025
Filed — Alteration CO
CAP/REMOVE (1)GAS METER & (1)BOILER AT CELLAR, CAP/REMOVE (1)STOVE & (1)KITCHEN SINK AT 3RD FLOOR.
Q01250721-S1
11/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
You Gao
11/25/2025
Special inspection requirement — Energy Code Compliance Inspections
You Gao
11/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
You Gao
08/18/2025
Filed — Alteration CO
CAP/REMOVE (1)GAS METER & (1)BOILER AT CELLAR, CAP/REMOVE (1)STOVE & (1)KITCHEN SINK AT 3RD FLOOR.
Q01250721-I1
07/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
07/03/2025
Special inspection requirement — Interior lighting power
DEZHANG FANG
07/03/2025
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
07/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
06/13/2025
Violation issued (HPD, closed)
A
03/30/2023
Violation issued (HPD, closed)
A
11/15/2022
Violation issued (HPD, closed)
I
03/08/2022
Violation issued (HPD, closed)
A
03/08/2022
Violation issued (HPD, closed)
I
04/16/2021
Violation issued (HPD, closed)
A
10/25/2018
Violation issued (HPD, closed)
I
11/25/2016
Violation issued (HPD, closed)
I
03/03/2015
Violation issued (HPD, closed)
I
02/26/2004
Violation issued (ECB, closed)
Zoning
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedGREAT ONE CONSTRUCTION LL01/07/2026
DOB NOWGeneral ConstructionPermit IssuedGREAT ONE CONSTRUCTION LL12/12/2025
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC12/08/2025
BIS—ISSUEDMERED PROPERTIES INC07/11/2000
BISEQISSUEDMERED PROPERTIES INC03/14/2000
BIS—ISSUEDMERED PROPERTIES INC03/14/2000
BISPLISSUEDCATMAN PLUMBING INC02/18/2000
BISEQISSUEDMERED PROPERTIES INC12/01/1999
BIS—ISSUEDMERED PROPERTIES INC12/01/1999
BIS—ISSUEDSANO CONSTRUCTION OCRP.09/20/1999
1 project · most recent 12/04/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/04/2025Signed-offCATMAN PLUMBING INCGas, Water/Sanitary
1 project · most recent 12/19/2025
General Wiring
FiledStatusContractorScope
12/19/2025CompleteR & T ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/17/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/07/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/23/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/18/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/20/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
11/25/2025Fire-Resistant Penetrations and JointsYou Gaospecial
11/25/2025Energy Code Compliance InspectionsYou Gaoprogress
11/25/2025HVAC-R and service water piping design and insulationYou Gaoenergy_progress
07/03/2025Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
07/03/2025Interior lighting powerDEZHANG FANGenergy_progress
07/03/2025Energy Code Compliance InspectionsDEZHANG FANGprogress
07/03/2025Fire-Resistance Rated ConstructionDEZHANG FANGprogress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/18/2026Q01250721-I1Request digital key ↗
08/18/2026Q01250721-S1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01250721-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026Q01250721-I1Open ↗
09/01/2026Q01250721-I1Open ↗
09/01/2026Q01250721-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/18/2026Q01250721-S1Open ↗
08/18/2026Q01250721-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q01250721-I1Open ↗
08/23/2026Q01250721-S1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/18/2026Q01250721-I1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/18/2026Q01250721-I1Open ↗
▸DOB NOWFinal Survey1
08/18/2026Q01250721-I1Open ↗