← Back
Walk-up apt, over six families with stores
103-18 39 AVENUE
QUEENS · BIN 4044382
💬 Discuss this project
1928Year Built
4Stories
C7Building Class
R6BZoning
—Gross Floor Area
24Units
34 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: 103-18 INC. · 3.39 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
103-18 INC.303/22/2026
3902 NUEVO MILLENIUM GROC203/22/2026
LIDO REALTY COMPANY1003/22/2026
LIDO REALTY CD.103/22/2026
W & S BEDDING CORP203/22/2026
OWNER OF 39-06 104 ST103/22/2026
SLOPE REALTY303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.111/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BERGER CARLOSElectrical203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851111/10/2021
Building Lifecycle
All (65)Filed (1)Permit Issued (1)Signed Off (1)Violation (60)Inspection (1)Special Inspection (1)
09/12/2025
Violation issued (HPD, closed)
C
09/12/2025
Violation issued (HPD, open)
A
09/12/2025
Violation issued (HPD, closed)
C
10/25/2024
Violation issued (ECB, closed)
Construction
04/27/2022
Signed off — Alteration
Q00625285-I1
03/07/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/03/2022
Violation issued (HPD, closed)
A
01/27/2022
Violation issued (HPD, closed)
B
01/27/2022
Violation issued (HPD, closed)
A
11/18/2021
Permit issued — Boiler Equipment
Q00625285-I1-BE
11/10/2021
Filed — Alteration
Q00625285-I1
11/04/2021
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
LOUIS ARENA
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/27/2018
Violation issued (HPD, closed)
C
10/27/2018
Violation issued (HPD, open)
B
10/27/2018
Violation issued (HPD, closed)
B
10/27/2018
Violation issued (HPD, closed)
A
10/04/2018
Violation issued (HPD, open)
C
10/02/2018
Violation issued (HPD, closed)
A
10/02/2018
Violation issued (HPD, closed)
B
10/02/2018
Violation issued (HPD, closed)
A
08/26/2018
Violation issued (HPD, closed)
C
08/26/2018
Violation issued (HPD, open)
B
08/26/2018
Violation issued (HPD, closed)
B
08/26/2018
Violation issued (HPD, open)
C
08/26/2018
Violation issued (HPD, closed)
B
08/26/2018
Violation issued (HPD, closed)
B
08/26/2018
Violation issued (HPD, closed)
B
08/26/2018
Violation issued (HPD, closed)
B
08/17/2018
Violation issued (HPD, closed)
B
08/17/2018
Violation issued (HPD, closed)
B
08/17/2018
Violation issued (HPD, closed)
A
08/17/2018
Violation issued (HPD, closed)
B
08/17/2018
Violation issued (HPD, closed)
A
08/17/2018
Violation issued (HPD, open)
B
08/14/2018
Violation issued (HPD, closed)
A
08/14/2018
Violation issued (HPD, closed)
A
08/14/2018
Violation issued (HPD, closed)
B
06/19/2018
Violation issued (HPD, open)
B
06/19/2018
Violation issued (HPD, closed)
A
04/23/2018
Violation issued (ECB, closed)
Construction
07/31/2017
Violation issued (HPD, closed)
A
07/31/2017
Violation issued (HPD, closed)
A
07/31/2017
Violation issued (HPD, closed)
A
07/31/2017
Violation issued (HPD, open)
B
02/26/2015
Violation issued (HPD, closed)
I
01/15/2015
Violation issued (HPD, closed)
C
01/15/2015
Violation issued (HPD, open)
C
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/15/2014
Violation issued (HPD, open)
A
01/15/2014
Violation issued (HPD, open)
B
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/30/2008
Violation issued (HPD, open)
C
12/21/2008
Violation issued (HPD, open)
A
12/21/2008
Violation issued (HPD, open)
A
12/21/2008
Violation issued (HPD, open)
B
12/21/2008
Violation issued (HPD, open)
B
12/11/2008
Violation issued (HPD, open)
C
05/12/2007
Violation issued (HPD, open)
A
05/12/2007
Violation issued (HPD, open)
B
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offNEW YORK HEATING CORP11/18/2021
BISEQISSUEDM.S.S. CONSTRUCTION CORP10/19/2006
BISOTISSUEDRS CONSTRUCTION05/08/2006
BISOTISSUEDSTH ASSOCIATES11/17/2004
BISOTISSUEDSTH ASSOCIATES11/16/2004
BIS—ISSUEDNEW YORK SIGN CITY INC11/10/2004
BISFBISSUEDJACK PICCINI, INC04/17/2002
BISMHISSUEDSTONWALL CONTRACTING CORP.01/18/2002
BISOTRE-ISSUEDNIWINSKI ACOUSTICS INC05/02/1995
BISEQRE-ISSUEDNIWINSKI ACOUSTICS INC05/02/1995
2 projects · most recent 12/06/2024
General Wiring
FiledStatusContractorScope
12/06/2024Permit IssuedJECO ELEC'L SERVICE CORP.General Wiring
09/08/2021CompleteN.Z. PILGRIM ELECTRIC INC—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/07/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
11/04/2021Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/27/2026Q00625285-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q00625285-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026Q00625285-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00625285-I1Open ↗