← Back
Three families
103 GARFIELD PLACE
BROOKLYN · BIN 3020487
💬 Discuss this project
1901Year Built
3Stories
C0Building Class
R6BZoning
3,840 sfGross Floor Area
3Units
Three families · 2,035 sf lot · 1.89 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction13p · 1 filing · 20 docs
Floor 2Under Construction12p · 1 filing · 20 docs
Floor 1Under Construction12p · 1 filing · 20 docs
CellarUnder Construction13p · 2 filings · 20 docs
Sub-BasementUnder Construction12p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/05/2025$3.7M—— → —$964/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GTA ARCHITECTURE, PLLC305/15/2026
STRUCTURAL ENGINEERING TECHNOLOGIES103/20/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WSCONSULTANT & EXPEDITING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CLAIRMONT ELEC'L CONTR'GElectrical203/22/2026
CHATEL CONSTRUCTION CORPGeneral Contractor207/17/2026
ARCO PLBG AND HTG INCPlumbing109/18/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738203/20/2026
Building Lifecycle
All (61)Filed (4)Permit Issued (3)Objection (33)Special Inspection (21)
09/17/2026
Permit issued — Plumbing
B01350494-S2-PL
07/16/2026
Permit issued — Structural
B01350494-S1-ST
07/09/2026
Permit issued — General Construction
B01350494-I1-GC
06/25/2026
Objection resolved — Addressed
06/25/2026
Objection resolved — Addressed
06/25/2026
Objection resolved — Addressed
06/25/2026
Objection resolved — Addressed
06/24/2026
Objection raised — Scope
06/24/2026
Objection raised — Zoning
06/24/2026
Objection raised — Zoning
06/24/2026
Objection raised — Structural
06/10/2026
Special inspection requirement — Air barrier - visual inspection
George Argiris
06/10/2026
Special inspection requirement — Interior lighting power
George Argiris
06/10/2026
Special inspection requirement — Fenestration areas
George Argiris
06/10/2026
Special inspection requirement — Fenestration air leakage
George Argiris
06/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
George Argiris
06/08/2026
Special inspection requirement — Air barrier - visual inspection
06/08/2026
Special inspection requirement — Interior lighting power
05/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
05/26/2026
Special inspection requirement — Fenestration areas
05/26/2026
Special inspection requirement — Fenestration air leakage
05/15/2026
Filed — Alteration CO
Application filed for change of Occupancy configuration of existing 2 family dwelling. Basement floor comprises of 1 dwelling. 1st, 2nd and 3rd floors comprise of one dwelling, cellar is accessory use with storage, boiler room, meter room and recreation.
B01386881-I1
04/15/2026
Objection resolved — Resolved
04/15/2026
Objection resolved — Resolved
04/15/2026
Objection resolved — Resolved
04/07/2026
Objection resolved — Resolved
04/07/2026
Objection resolved — Resolved
04/07/2026
Objection resolved — Resolved
04/01/2026
Objection resolved — Resolved
04/01/2026
Objection resolved — Resolved
04/01/2026
Objection resolved — Resolved
04/01/2026
Objection resolved — Resolved
03/31/2026
Objection raised — Admin
03/31/2026
Objection raised — Structural
03/26/2026
Objection raised — Admin
03/25/2026
Objection raised — Scope
03/25/2026
Objection raised — Plumbing
03/25/2026
Objection raised — Scope
03/25/2026
Objection raised — Structural
03/25/2026
Objection raised — Fire_Protection
03/25/2026
Objection raised — Fire_Protection
03/25/2026
Objection raised — Structural
03/25/2026
Objection raised — Zoning
03/25/2026
Objection raised — Mechanical
03/25/2026
Objection raised — Electrical
03/20/2026
Filed — Alteration
Interior renovation of existing 2 family, work includes structural work and deck as per plans filed. No change in use, egress or occupancy
B01350494-S1
03/16/2026
Filed — Alteration
Interior renovation of existing 2 family, work includes structural work and deck as per plans filed. No change in use, egress or occupancy
B01350494-S2
03/16/2026
Objection resolved — Addressed
03/13/2026
Objection raised — Admin
03/05/2026
Special inspection requirement — Structural Steel - Details
anthony santoro
03/05/2026
Special inspection requirement — Subgrade Inspections
anthony santoro
03/05/2026
Special inspection requirement — Structural Steel - Welding
anthony santoro
03/05/2026
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
03/05/2026
Special inspection requirement — Post-installed Anchors
anthony santoro
03/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
anthony santoro
03/05/2026
Special inspection requirement — Structural Steel - High Strength Bolting
anthony santoro
02/28/2026
Filed — Alteration
Interior renovation of existing 2 family, work includes structural work and deck as per plans filed. No change in use, egress or occupancy
B01350494-I1
02/11/2026
Special inspection requirement — Final
anthony santoro
01/23/2026
Special inspection requirement — Energy Code Compliance Inspections
George Argiris
01/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedARCO PLBG AND HTG INC09/17/2026
DOB NOWStructuralPermit IssuedCHATEL CONSTRUCTION CORP07/16/2026
DOB NOWGeneral ConstructionPermit IssuedCHATEL CONSTRUCTION CORP07/09/2026
1 project · most recent 03/20/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/20/2026Permit IssuedAPPROVED PLUMBING AND FIRGas, Water/Sanitary
3 projects · most recent 01/13/2026
General Wiring
FiledStatusContractorScope
01/13/2026Permit Issued2AK LIGHT ELECTRIC CORPGeneral Wiring
10/22/2025CompleteCLAIRMONT ELEC'L CONTR'GGeneral Wiring
07/14/2025CompleteCLAIRMONT ELEC'L CONTR'GGeneral Wiring
1 project · most recent 03/20/2026
Steel Concrete
FiledStatusContractorScope
03/20/2026Permit IssuedAPPROVED PLUMBING AND FIRSteel, Concrete
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
06/10/2026Air barrier - visual inspectionGeorge Argirisenergy_progress
06/10/2026Interior lighting powerGeorge Argirisenergy_progress
06/10/2026Fenestration areasGeorge Argirisenergy_progress
06/10/2026Fenestration air leakageGeorge Argirisenergy_progress
06/10/2026Fenestration and door U-factor and product ratingsGeorge Argirisenergy_progress
06/08/2026Air barrier - visual inspection—energy_progress
06/08/2026Interior lighting power—energy_progress
05/26/2026Fenestration and door U-factor and product ratings—energy_progress
05/26/2026Fenestration areas—energy_progress
05/26/2026Fenestration air leakage—energy_progress
03/05/2026Structural Steel - Detailsanthony santorospecial
03/05/2026Subgrade Inspectionsanthony santorospecial
03/05/2026Structural Steel - Weldinganthony santorospecial
03/05/2026Concrete - Cast-In-Placeanthony santorospecial
03/05/2026Post-installed Anchorsanthony santorospecial
03/05/2026Structural Stability – Alterations of existing buildingsanthony santorospecial
03/05/2026Structural Steel - High Strength Boltinganthony santorospecial
02/11/2026Finalanthony santoroprogress
01/23/2026Energy Code Compliance InspectionsGeorge Argirisprogress
01/23/2026Fire-Resistant Penetrations and Jointsanthony santorospecial
01/22/2026FinalGeorge Argirisprogress
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/18/2026B01350494-S2Request digital key ↗
08/18/2026B01350494-S1Request digital key ↗
08/18/2026B01350494-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature8
08/28/2026B01350494-I1Open ↗
08/28/2026B01350494-I1Open ↗
08/28/2026B01350494-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/18/2026B01350494-S2Open ↗
08/18/2026B01350494-S1Open ↗
08/17/2026B01386881-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026B01350494-I1Open ↗
08/23/2026B01350494-S1Open ↗
08/23/2026B01350494-S1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/14/2026B01386881-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/18/2026B01350494-S2Open ↗
08/18/2026B01350494-S1Open ↗
08/14/2026B01386881-I1Open ↗
Showing 3 of 6 on file for this type
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/14/2026B01386881-I1Open ↗