Primarily 5-6 family with 1 store or office
103 MOORE STREET
BROOKLYN · BIN 3325959
💬 Discuss this project
1931Year Built
4Stories
S5Building Class
R6Zoning
6,600 sfGross Floor Area
7Units
0 Open ViolationsFDNY Report ↗
Primarily 5-6 family with 1 store or office · 1,875 sf lot · 3.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Bulkhead2p · 2 filings · 4 docs
Penthouse27p · 1 filing · 20 docs
Floor 431p · 4 filings · 20 docs
Floor 330p · 4 filings · 20 docs
Floor 228p · 4 filings · 20 docs
Floor 128p · 4 filings · 20 docs
Cellar31p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS504/09/2026
ADOR BUILDERS803/22/2026
MOORE & MOORE LLC303/22/2026
BUILDERS LLC ADOR103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIKOLAI KATZ ARCHITECT804/20/2026
VASILIOS ARTEMIOU PE412/08/2025
KMA DESIGNS LLC108/13/2025
STEEL CORE ENGINEERING PLLC405/30/2025
RIKE TECH ASSOCIATES LLC302/21/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUNARD RAMAH303/21/2026
EXPRESS FILING INC2803/21/2026
PINE RE CONSULTING103/21/2026
KMA DESIGNS LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ADOR BUILDERS LLCGeneral Contractor1607/08/2026
ABRAHAM GELBElectrical303/21/2026
B CONTRACTORS GROUP LLCGeneral Contractor303/21/2026
J & G CONSTRUCTION SVCSGeneral Contractor204/09/2026
QUALITY PIPING, INCFire Protection107/08/2026
NESS MECHANICAL P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161404/20/2026
MOHAMMAD AHEAD - PROFESSI9286108/13/2025
Building Lifecycle
All (176)Filed (20)Permit Issued (17)Signed Off (8)Violation (15)Inspection (7)Objection (79)Special Inspection (30)
07/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/04/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
05/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
05/04/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
05/04/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
05/04/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
05/04/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/04/2026
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
05/04/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
05/04/2026
Special inspection requirement — Metering
FAHAD FATEH
05/04/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
05/04/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
05/04/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
05/04/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
05/04/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/28/2026
Objection resolved — Addressed
04/22/2026
Objection raised — Cost
04/20/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01035956-I1.
B01035956-P9
03/11/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01035956-I1.
B01035956-P8
03/11/2026
Special inspection requirement — Metering
FAHAD FATEH
03/11/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
03/11/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
03/11/2026
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
03/11/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
03/11/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
03/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
03/11/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
03/11/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
03/11/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
03/11/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
03/11/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
03/11/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
02/04/2026
Objection resolved — Addressed
02/04/2026
Objection resolved — Addressed
01/21/2026
Objection raised — Other
01/21/2026
Objection raised — Other
01/15/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01035956-I1.
B01035956-S4
01/14/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01035956-I1.
B01035956-S2
01/14/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01035956-I1.
B01035956-P7
01/14/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01035956-I1.
B01035956-S3
01/13/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01035956-I1.
B01035956-S8
01/12/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01035956-I1.
B01035956-Z1
01/09/2026
Permit issued — Structural
B01035956-Z1-ST
01/07/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01035956-I1.
B01035956-S9
12/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/17/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/15/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/12/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/11/2025
Permit issued — Mechanical Systems
B01035956-S2-MS
12/08/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01035956-I1.
B01035956-P6
12/03/2025
Permit issued — Foundation
B01035956-S9-FO-EA
12/01/2025
Permit issued — General Construction
B01035956-I1-GC
11/28/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01035956-I1.
B01035956-S1
11/07/2025
Signed off — Alteration
B01258714-I1
11/05/2025
Objection raised — Other
10/24/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01035956-I1.
B01035956-P4
09/30/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 176 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offADOR BUILDERS LLC01/09/2026
DOB NOWMechanical SystemsSigned-offADOR BUILDERS LLC12/11/2025
DOB NOWFoundationSigned-offADOR BUILDERS LLC12/03/2025
DOB NOWGeneral ConstructionPermit IssuedADOR BUILDERS LLC12/01/2025
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS08/14/2025
DOB NOWSupported ScaffoldSigned-offJ & G CONSTRUCTION SVCS08/14/2025
DOB NOWGeneral ConstructionPermit IssuedADOR BUILDERS LLC08/01/2025
DOB NOWStructuralSigned-offADOR BUILDERS LLC06/12/2025
DOB NOWSprinklersSigned-offQUALITY PIPING, INC05/19/2025
DOB NOWMechanical SystemsSigned-offADOR BUILDERS LLC05/13/2025
DOB NOWConstruction FenceSigned-offADOR BUILDERS LLC05/12/2025
DOB NOWPlumbingSigned-offNESS MECHANICAL P & H INC02/10/2025
DOB NOWGeneral ConstructionPermit IssuedADOR BUILDERS LLC02/04/2025
DOB NOWStructuralSigned-offADOR BUILDERS LLC01/31/2025
DOB NOWMechanical SystemsSigned-offADOR BUILDERS LLC01/22/2025
DOB NOWMechanical SystemsSigned-offB CONTRACTORS GROUP LLC01/14/2025
DOB NOWConstruction FenceSigned-offADOR BUILDERS LLC01/03/2025
1 project · most recent 04/20/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/20/2026Signed-offADOR BUILDERS LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin 4MXS36WMVJU9 36,000 BTU · Condensing Unit ×3
5MXS48WMVJU9 18,500 BTU · Condensing Unit ×3
2MXM18AVJU9 21,600 BTU · Condensing Unit ×1
RXF18AXVJU 24,000 BTU · Condensing Unit ×1
1 project · most recent 04/20/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/20/2026Signed-offNESS MECHANICAL P & H INCGas, Storm, Water/Sanitary
5 projects · most recent 01/21/2026
General Wiring
FiledStatusContractorScope
01/21/2026CompleteBROOKLYN POWER ELECTRIC CGeneral Wiring
07/21/2025CompleteRICHARD NEU—
02/11/2025CompleteFRIED ELECTRIC CO.—
07/17/2019CompleteWILLDAN ELECTRICAL OF NY—
05/04/2018CompleteWILLDAN ELECTRICAL OF NY—
1 project · most recent 04/20/2026
Steel Wood
FiledStatusContractorScope
04/20/2026Signed-offADOR BUILDERS LLCSteel, Wood
1 project · most recent 04/20/2026
Fence
FiledStatusContractorScope
04/20/2026Signed-offADOR BUILDERS LLCFence
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/17/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/15/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/12/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/30/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 111
DateRequirementInspectorRole
05/04/2026Protection of exposed foundation insulationFAHAD FATEHenergy_progress
05/04/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/04/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
05/04/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
05/04/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
05/04/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
05/04/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
05/04/2026Interior lighting powerFAHAD FATEHenergy_progress
05/04/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
05/04/2026Lighting controlsFAHAD FATEHenergy_progress
05/04/2026Fenestration areasFAHAD FATEHenergy_progress
05/04/2026Exterior lighting powerFAHAD FATEHenergy_progress
05/04/2026MeteringFAHAD FATEHenergy_progress
05/04/2026Fenestration air leakageFAHAD FATEHenergy_progress
05/04/2026Maintenance informationFAHAD FATEHenergy_progress
03/11/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
03/11/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
03/11/2026Exterior lighting powerFAHAD FATEHenergy_progress
03/11/2026Interior lighting powerFAHAD FATEHenergy_progress
03/11/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
03/11/2026Fenestration air leakageFAHAD FATEHenergy_progress
03/11/2026Maintenance informationFAHAD FATEHenergy_progress
03/11/2026Protection of exposed foundation insulationFAHAD FATEHenergy_progress
03/11/2026Fenestration areasFAHAD FATEHenergy_progress
03/11/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
Latest 25 of 111.
▾Documents — 159 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch21
08/21/2026B01258714-I1Request digital key ↗
08/17/2026B01035956-I1Request digital key ↗
08/17/2026B01035956-P6Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00319391-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00319253-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00319997-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00319997-I1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION8
01/05/2026322086764Open ↗
12/11/2025322086764Open ↗
12/04/2025322039414Open ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records15
▸DOB NOWZD1: DOB Zoning Diagram7
08/17/2026B01035956-P8Open ↗
08/17/2026B01035956-I1Open ↗
08/15/2026B01035956-P9Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
08/17/2026B01035956-P8Open ↗
08/17/2026B01035956-I1Open ↗
08/15/2026B01035956-P9Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
02/14/2020322039414Open ↗
▸BISZONING DIAGRAM1
03/01/2021322039414Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
02/26/2021322039414Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/26/2021322039414Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026B01035956-I1Open ↗
▸Seals & Professional Certifications47
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/21/2026B01258714-I1Open ↗
08/17/2026B01035956-P9Open ↗
08/17/2026B01035956-P6Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/10/2026B01035956-S4Open ↗
09/02/2026B01035956-S9Open ↗
09/01/2026B01035956-S2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/10/2026B01035956-S4Open ↗
09/02/2026B01035956-S9Open ↗
09/02/2026B01035956-S9Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/06/2020322039414Open ↗
▸Trade Schedules & Equipment1
▸BISDEP STORMWATER/SEWER CERTIFICATION (HCP/SCP)1
02/26/2021322039414Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST1
02/06/2020322039414Open ↗
▸DOB NOWStreet Trees Site Plan1
08/17/2026B01035956-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/17/2026B01035956-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/17/2026B01035956-I1Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/17/2026B01035956-P6Open ↗
08/17/2026B01035956-P8Open ↗
08/17/2026B01035956-P3Open ↗
Showing 3 of 15 on file for this type
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/06/2020322039414Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/03/2020322039414Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: SOIL INSPECTION2
08/03/2020322039414Open ↗
08/03/2020322039414Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/15/2026B01035956-S9Open ↗
▸DOB NOWSOIL REPORT1
08/15/2026B01035956-S9Open ↗
▸Approvals, Objections & Sign-offs10
▸BISLETTERS - SUPPORTING DOCUMENTATION8
02/26/2021322039414Open ↗
02/26/2021322039414Open ↗
02/26/2021322039414Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
02/22/2021322039414Open ↗
02/06/2020322039414Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET4
05/29/2020322086764Open ↗
02/22/2020322039414Open ↗
02/22/2020322039414Open ↗
Showing 3 of 4 on file for this type
▸Other Documents24
▸DOB NOWSite Survey: Initial7
08/17/2026B01035956-P8Open ↗
08/17/2026B01035956-I1Open ↗
08/15/2026B01035956-P9Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/17/2026B01035956-P8Open ↗
08/17/2026B01035956-I1Open ↗
08/15/2026B01035956-P9Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProperty Ownership Certification7
08/17/2026B01035956-I1Open ↗
08/17/2026B01035956-P8Open ↗
08/15/2026B01035956-P9Open ↗
Showing 3 of 7 on file for this type
▸BISPLOT DIAGRAM1
02/14/2020322039414Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
02/26/2021322039414Open ↗
▸DOB NOWAdjoining Owners Notification1
08/15/2026B01035956-S9Open ↗