DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB06/22/2018VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB05/31/2018FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB12/16/2016VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB12/16/2016VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB12/16/2016VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB01/31/2013FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/01/2009V-DOB VIOLATION - ACTIVE
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB02/13/2004V-DOB VIOLATION - ACTIVE
DOB03/21/2003V-DOB VIOLATION - ACTIVE
DOB03/19/2003V-DOB VIOLATION - ACTIVE
DOB08/08/2002V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB02/07/2000V-DOB VIOLATION - ACTIVE
DOB03/16/1999V-DOB VIOLATION - ACTIVE
DOB05/04/1998V-DOB VIOLATION - ACTIVE
DOB07/01/1997V-DOB VIOLATION - ACTIVE
DOB08/29/1995V-DOB VIOLATION - ACTIVE
DOB04/20/1989VP-VIOLATION UNSERVED ECB-ACTIVE
DOB04/18/1989VP-VIOLATION UNSERVED ECB-ACTIVE
ECB10/23/2017FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000004962 HASBEEN INSPECTED,TESTED,AND DISINFECTED AND THAT A MAINTENANCE PLAN HAS BEEN DEVELOPED AND IMPLEMENTED BY NOVEMBER,1,2016.REM:FILE ANNUAL CERTNothing owed — awaiting certificate of correction
ECB10/23/2017FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000004972 HASBEEN INSPECTED,TESTED,AND DISINFECTED AND THAT A MAINTENANCE PLAN HAS BEEN DEVELOPED AND IMPLEMENTED BY NOVEMBER,1,2016.REM:FILE ANNUAL CERTNothing owed — awaiting certificate of correction
ECB08/07/2009ALTERED/CHANGED BLDG OCCUPIED W/O A VALID C/O AS PER 28-118.3.1-28-118.3.2. NOTED: THE FOLLOWING CONDITIONS: FINAL C/O #96798 DATED 8.20.90 INDICATES 3RD FLR AS MANUFACTURING. EXISTING CONDITIONS ARE OFFICES &Nothing owed — awaiting certificate of correction
ECB07/16/200350A,50B,50C,48AB. 50A)WATER COLUMN NOT ALIGNED WITH VERTICAL BOILER. 50B)SECONDARY BLOW DOWN VALVE NOT SLOW-CLOSING TYPE. 50C)NO DISCHARGE PIPE ON THE SAFETY VALVENothing owed — awaiting certificate of correction
ECB12/29/199749-BOILER CANT BE INSPECTED ON LEFT SIDE, DUE TO BOILER ROOM WALL TOO CLOSE TO BOILER.Nothing owed — awaiting certificate of correction
ECB04/12/19963A CORRODED SECTION OF FLUE PIPE IN THE WINDOW BE REPLACED BY NEW ONE ALONG WITH T CONNECTION OUTSIDE.Nothing owed — awaiting certificate of correction
ECB05/18/199449, (1) VACUUM TANK TOO CLOSE TO THE BLR (2) HAND & HOLES DIRTY TO REPLACE GASKETS (3) G. GLASS TO TIT WITH STOP VALVE & DRAIN PIPE (3) FOOD LAID ON TOP OF THE BLR IN SAFETY HAZARD FOR EMPLOYEES, EQUIPMENT ANDNothing owed — awaiting certificate of correction