Elevator apt, converted
103 NORTH 3 STREET
BROOKLYN · BIN 3335727
💬 Discuss this project
1920Year Built
1Stories
D5Building Class
M1-2/R6AZoning
101,358 sfGross Floor Area
52Units
LL97 CoveredRent Stabilized32 Open Violations 27 unresolved · 5 paperwork only ▸FDNY Report ↗
Elevator apt, converted · Owner of record: 190 BERRY (BROOKLYN) OWNER, LLC · 36,511 sf lot · 2.78 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 20 docs
Floor 21p · 1 filing · 10 docs
Floor 1Under Construction45p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LENY BERRY HOLDINGS603/22/2026
BERRY ENTERPRISES USA3803/21/2026
LENY EQUITIES1103/21/2026
EXTERIOR EALL SYSTEMS203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/30/2025$55.7M—— → —$550/sf building
04/30/2015$92.2M—BERRY ENTERPRISES USA, LLC → WB BERRY STREET LLC$910/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CROWN DESIGN CONSULTING603/21/2026
A1 EXPEDITING SERVICE CORP.803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKENDER & BENJAMIN INCGeneral Contractor407/08/2026
ECKINGER CONSTRUCTION COGeneral Contractor307/08/2026
NICHOLAS BLASONEElectrical203/21/2026
ZORAN VUJICICElectrical203/21/2026
EMPIRE STATE FIRE SPRINKLFire Protection207/08/2026
BNH ELECTRICAL CORPElectrical103/22/2026
NATIONAL SIGN LIGHTINGScaffold108/16/2026
FARELLA MICHAELElectrical103/21/2026
MICHAEL FARELLAElectrical103/21/2026
TRIBECA CONSTR MANGEMENT*General Contractor109/16/2026
FULTON PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILROSE CONSULTANTS LLC2003608/21/2026
AVCON ENGINEERING PC548205/16/2023
DOMANI INSPECTION SERVICE843105/10/2022
Building Lifecycle
All (124)Filed (13)Permit Issued (10)Signed Off (2)Violation (60)Inspection (5)Objection (4)Special Inspection (30)
09/15/2026
Permit issued — General Construction
B01453800-I1-GC
09/03/2026
Filed — Alteration
INTERIOR RENOVATION OF APPROXIMATELY 1,600 SF. WORKINCLUDED, BUT IS NOT LIMITED TO, CONSTRUCTION OF INTERIOR NON-BEARING WALLS/PARTITIONS, WALL FIXTURES,FLOORING, CEILING, LIGHT FIXTURES. NO CHANGE IN USE, EGRESS, AND/OR OCCUPANCY
B01453800-I1
09/02/2026
Special inspection requirement — Energy Code Compliance Inspections
ANDREW OJAMAA
08/31/2026
Special inspection requirement — Final
ANDREW OJAMAA
08/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/21/2026
Filed — Alteration
Modification to Mechanical systems as per plans filed herewith.
B01354204-P2
08/21/2026
Filed — Alteration
Modification to Plumbing systems as per plans filed herewith.
B01366583-P1
08/21/2026
Special inspection requirement — Ventilation and air distribution system
Christopher Drutjons
08/21/2026
Special inspection requirement — Final
Christopher Drutjons
08/21/2026
Special inspection requirement — Mechanical Systems
Christopher Drutjons
08/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Drutjons
08/21/2026
Special inspection requirement — Heating Systems
Christopher Drutjons
08/21/2026
Special inspection requirement — Duct leakage testing, insulation and design
Christopher Drutjons
08/21/2026
Special inspection requirement — Shutoff dampers
Christopher Drutjons
08/20/2026
Filed — Alteration
Interior renovation as as per plans filed herewith.
B01354201-P1
08/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
08/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Drutjons
08/20/2026
Special inspection requirement — Final
Stephen Furnstahl
08/14/2026
Permit issued — Sign
B01384111-I1-SG
08/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Drutjons
08/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
08/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/14/2026
Special inspection requirement — Final
Stephen Furnstahl
08/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/14/2026
Special inspection requirement — Heating Systems
Christopher Drutjons
08/14/2026
Special inspection requirement — Mechanical Systems
Christopher Drutjons
08/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/14/2026
Special inspection requirement — Final
Christopher Drutjons
08/14/2026
Special inspection requirement — Duct leakage testing, insulation and design
Christopher Drutjons
08/14/2026
Special inspection requirement — Shutoff dampers
Christopher Drutjons
08/14/2026
Special inspection requirement — Ventilation and air distribution system
Christopher Drutjons
08/10/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/06/2026
Filed — Alteration
ERECT 1 NON-ILLUM SIGN ON EXISTING CANOPY AND 1 ILLUMINATED D/F BLADE SIGN. SIGNS ARE ACCESSORY TO WEST ELM.
B01384111-I1
07/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/30/2026
Violation issued (HPD, open)
A
06/30/2026
Violation issued (HPD, open)
C
06/30/2026
Violation issued (HPD, closed)
C
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
A
05/05/2026
Violation issued (HPD, closed)
A
04/30/2026
Permit issued — Structural
B01364379-I1-ST
04/13/2026
Filed — Alteration
Modification to Mechanical systems as per plans filed herewith.
B01354204-P1
04/07/2026
Special inspection requirement — Shutoff dampers
Christopher Drutjons
04/07/2026
Special inspection requirement — Mechanical Systems
Christopher Drutjons
04/07/2026
Special inspection requirement — Heating Systems
Christopher Drutjons
04/07/2026
Special inspection requirement — Final
JERE MURDOCH
04/01/2026
Permit issued — Mechanical Systems
B01354204-I1-MS
04/01/2026
Permit issued — General Construction
B01354201-I1-GC
03/27/2026
Permit issued — Plumbing
B01366583-I1-PL
03/11/2026
Filed — Alteration
Structural Modifications as per plans filed herewith.
B01364379-I1
03/11/2026
Filed — Alteration
Modification to Plumbing systems as per plans filed herewith.
B01366583-I1
03/06/2026
Filed — Alteration
Modification to Mechanical systems as per plans filed herewith.
B01354204-I1
03/05/2026
Filed — Alteration
Interior renovation as as per plans filed herewith.
B01354201-I1
07/18/2025
Violation issued (HPD, open)
A
07/18/2025
Violation issued (HPD, closed)
C
07/18/2025
Violation issued (HPD, closed)
C
07/18/2025
Violation issued (HPD, closed)
C
07/18/2025
Violation issued (HPD, open)
A
07/18/2025
Violation issued (HPD, open)
A
Latest 60 of 124 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTRIBECA CONSTR MANGEMENT*09/15/2026
DOB NOWSignPermit IssuedNATIONAL MAINTENANCE, INC08/14/2026
DOB NOWStructuralSigned-offECKINGER CONSTRUCTION CO04/30/2026
DOB NOWMechanical SystemsPermit IssuedECKINGER CONSTRUCTION04/01/2026
DOB NOWGeneral ConstructionPermit IssuedECKINGER CONSTRUCTION04/01/2026
DOB NOWPlumbingSigned-offFULTON PLBG & HTG CORP03/27/2026
DOB NOWSprinklersSigned-offEMPIRE STATE FIRE SPRINKL04/24/2023
DOB NOWSprinklersSigned-offEMPIRE STATE FIRE SPRINKL10/11/2022
DOB NOWGeneral ConstructionSigned-offSKENDER & BENJAMIN INC08/01/2022
DOB NOWGeneral ConstructionSigned-offSKENDER & BENJAMIN INC06/02/2022
BISSPISSUEDPLUMBING NYC, INC10/18/2019
BISPLISSUEDAL PLUMBING & CONT. INC07/18/2019
BISOTISSUEDAPB CONSULTING & CONSTRUC04/16/2018
BISFPISSUEDWILLIAM HIRD & CO INC04/12/2018
BISPLISSUEDPARAMOUNT PLBG & HTG CORP03/05/2018
BISSPISSUEDPRECISION PLBG SVCS., INC05/18/2017
BISEQISSUEDAPB CONSULTING & CONSTRUC05/16/2017
BISOTISSUEDAPB CONSULTING & CONSTRUC04/13/2017
BISPLISSUEDPARAMOUNT PLBG & HTG CORP03/21/2017
BISOTISSUEDAPB CONSULTING & CONSTRUC03/08/2017
BISPLISSUEDFLYTIGER P & H LTD05/20/2014
BISMHISSUEDLIN MAINTENANCE INC05/12/2014
BISEQISSUEDLIN MAINTENANCE INC05/12/2014
BISPLISSUEDR. BARONE PLUMBING11/20/2012
BISOTISSUEDL & Q SERVICES INC05/03/2012
BISFPISSUEDFIRE ZONE VENT & SUPP INC04/20/2012
BISPLISSUEDQUEENS MAINTENANCE CO INC03/21/2012
BISOTISSUEDL & Q SERVICES INC10/18/2011
BISPLISSUEDORION PLUMBING & HTG CORP07/11/2011
BISPLISSUEDORION PLUMBING & HTG CORP07/11/2011
BISPLISSUEDFLYTIGER P & H LTD04/08/2011
BISEQISSUEDL & Q SERVICES INC04/01/2011
BISOTISSUEDL & Q SERVICES INC04/01/2011
BISFPISSUEDMEGA FIRE PROTECTION INC11/22/2010
BISFPISSUEDIDEAL FIRE SAFETY SYS. IN07/27/2010
BISPLISSUEDORION PLUMBING & HTG CORP04/12/2010
BISOTISSUEDTRIPLE 8 CONSTRUCTION INC04/09/2010
BISOTISSUEDTRIPLE 8 CONSTRUCTION INC03/22/2010
BISPLISSUEDTHE PLUMBING COMPANY INC11/17/2009
BISOTISSUEDSUNSET REST. MAINT. CORP11/17/2009
+ 15 more permits on file
2 projects · most recent 09/03/2026
Heating and Air Conditioning Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/03/2026Permit IssuedTRIBECA CONSTR MANGEMENT*Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric SUZ-AA36NL 36,000 BTU · Heat Pump Outdoor ×1
08/21/2026Permit IssuedECKINGER CONSTRUCTION COAir Conditioning Systems
Cooling
Daikin Reya480aatja 40 tons · Vrf Outdoor ×2
1 project · most recent 08/21/2026
Water/Sanitary
FiledStatusContractorScope
08/21/2026Signed-offFULTON PLBG & HTG CORPWater/Sanitary
9 projects · most recent 09/15/2026
General Wiring
FiledStatusContractorScope
09/15/2026Permit IssuedPROFF ELECTRICAL LLC—
08/04/2026Permit IssuedAMOR ELECTRIC CORP28 meters
04/17/2026Permit IssuedAMOR ELECTRIC CORPGeneral Wiring
04/17/2026Permit IssuedAMOR ELECTRIC CORPGeneral Wiring
04/17/2026Permit IssuedAMOR ELECTRIC CORPGeneral Wiring
04/08/2026Permit IssuedAMOR ELECTRIC CORPGeneral Wiring
03/30/2026Pending Payment VerificationMETROPOLITAN ELECTRIC COGeneral Wiring
10/26/2022CompleteBNH ELECTRICAL CORPGeneral Wiring
12/14/2017CompleteLTC ELEC'L CONTR'G LLCGeneral Wiring
1 project · most recent 03/11/2026
Steel
FiledStatusContractorScope
03/11/2026Signed-offECKINGER CONSTRUCTION COSteel
2 projects · most recent 09/03/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
09/03/2026Permit IssuedTRIBECA CONSTR MANGEMENT*Tenant Protection Plan 72 Hour
08/20/2026Permit IssuedECKINGER CONSTRUCTION COTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/10/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/12/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/05/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/06/2023Certification Failed Sprinkler-SP-Fixtures-FinishCertification FailedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
09/02/2026Energy Code Compliance InspectionsANDREW OJAMAAprogress
08/31/2026FinalANDREW OJAMAAprogress
08/24/2026Tenant Protection Plan Compliance—special
08/21/2026Ventilation and air distribution systemChristopher Drutjonsenergy_progress
08/21/2026FinalChristopher Drutjonsprogress
08/21/2026Mechanical SystemsChristopher Drutjonsspecial
08/21/2026Tenant Protection Plan ComplianceChristopher Drutjonsspecial
08/21/2026Heating SystemsChristopher Drutjonsspecial
08/21/2026Duct leakage testing, insulation and designChristopher Drutjonsenergy_progress
08/21/2026Shutoff dampersChristopher Drutjonsenergy_progress
08/20/2026Tenant Protection Plan Compliance—special
08/20/2026Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
08/20/2026Fire-Resistance Rated ConstructionChristopher Drutjonsprogress
08/20/2026FinalStephen Furnstahlprogress
08/14/2026Fire-Resistance Rated ConstructionChristopher Drutjonsprogress
08/14/2026Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
08/14/2026Tenant Protection Plan Compliance—special
08/14/2026FinalStephen Furnstahlprogress
08/14/2026Tenant Protection Plan Compliance—special
08/14/2026Heating SystemsChristopher Drutjonsspecial
08/14/2026Mechanical SystemsChristopher Drutjonsspecial
08/14/2026Tenant Protection Plan Compliance—special
08/14/2026FinalChristopher Drutjonsprogress
08/14/2026Duct leakage testing, insulation and designChristopher Drutjonsenergy_progress
08/14/2026Shutoff dampersChristopher Drutjonsenergy_progress
Latest 25 of 42.
▾Documents — 527 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
09/15/2026B01453800-S1Request digital key ↗
09/15/2026B01453800-I1Request digital key ↗
08/29/2026B00675135-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits106
▸BISWORK PERMIT APPLICATION46
10/21/2019321472599Open ↗
07/22/2019321472599Open ↗
04/16/2018321472599Open ↗
Showing 3 of 46 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION44
05/23/2019321484149Open ↗
09/11/2018321627414Open ↗
08/21/2018321826119Open ↗
Showing 3 of 44 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION12
02/25/2020321472599Open ↗
02/25/2020321472599Open ↗
11/20/2018321472599Open ↗
Showing 3 of 12 on file for this type
▸BISPLACE OF ASSEMBLY2
12/06/2013320897053Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit2
08/18/2026B01354201-P1Open ↗
08/13/2026B01354201-I1Open ↗
▸Seals & Professional Certifications107
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION48
04/13/2018321779802Open ↗
04/03/2018321472599Open ↗
04/03/2018321472599Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/15/2026B01453800-I1Open ↗
09/15/2026B01453800-S1Open ↗
08/29/2026B00675135-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/23/2026B01453800-I1Open ↗
09/23/2026B01453800-I1Open ↗
09/23/2026B01354204-P2Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
05/17/2017321574710Open ↗
06/05/2014320850824Open ↗
Showing 2 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026B01354204-P2Open ↗
09/23/2026B01354204-I1Open ↗
09/23/2026B01354204-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/17/2017321574710Open ↗
06/05/2014320850824Open ↗
▸Trade Schedules & Equipment46
▸BISSELF-CERT PLUMBING NOTICE15
05/27/2015320850824Open ↗
12/18/2014320850824Open ↗
07/22/2014320850824Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING14
10/27/2011320230665Open ↗
Showing 1 of 14 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT10
01/10/2013320043644Open ↗
01/10/2013320043644Open ↗
01/10/2013320043644Open ↗
Showing 3 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS4
04/26/2012320138436Open ↗
Showing 1 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
11/01/2016321472599Open ↗
06/20/2014320850824Open ↗
06/05/2014320850824Open ↗
▸Safety & Tenant Protection31
▸DOB NOWHPD-1: Anti-Harassment Area Checklist14
08/18/2026B01354201-P1Open ↗
08/18/2026B01364379-P1Open ↗
08/18/2026B01366583-P1Open ↗
Showing 3 of 14 on file for this type
▸BISANTI-HARASSMENT CHECKLIST8
02/14/2018321779802Open ↗
07/25/2017321627414Open ↗
05/17/2017321574710Open ↗
Showing 3 of 8 on file for this type
▸BISTenant Protection Plan and Notes4
02/14/2018321779802Open ↗
07/25/2017321627414Open ↗
05/17/2017321574710Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCertificate of No Harassment2
08/18/2026B01354201-P1Open ↗
08/13/2026B01354201-I1Open ↗
▸BISHPD-1 - Anti-Harassment Area Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos41
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
09/15/2026B01453800-I1Open ↗
09/15/2026B01453800-S1Open ↗
08/29/2026B00675135-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER8
10/14/2011320369971Open ↗
Showing 1 of 8 on file for this type
▸DOB NOWOER: Notice to Proceed7
09/15/2026B01453800-S1Open ↗
09/15/2026B01453800-I1Open ↗
08/18/2026B01364379-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/21/2018321826119Open ↗
06/05/2014320850824Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026B00675135-I1Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
07/25/2017321627414Open ↗
03/31/2017320850824Open ↗
03/31/2017320850824Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
03/24/2017320850824Open ↗
08/10/2012320369971Open ↗
04/26/2012320138436Open ↗
▸BISTECHNICAL REPORT: ENERGY3
10/14/2011320369971Open ↗
Showing 1 of 3 on file for this type
▸BISEMERGENCY LIGHTING (IF NOT IN COMPLIANCE WITH MEMEO 2-18-81)1
07/28/2014320897053Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00675135-I1Open ↗
▸Inspections & Test Reports2
▸BISDEP Hydrant Flow Test Letter1
03/07/2017321472599Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
01/11/2017321472599Open ↗
▸Approvals, Objections & Sign-offs65
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST31
03/31/2017320850824Open ↗
03/29/2017320850824Open ↗
03/24/2017320850824Open ↗
Showing 3 of 31 on file for this type
▸BISADMINISTRATIVE OBJECTIONS20
06/05/2014320850824Open ↗
12/06/2013320897053Open ↗
03/27/2012320453665Open ↗
Showing 3 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
07/27/2018320897053Open ↗
07/28/2014320897053Open ↗
07/28/2014320897053Open ↗
Showing 3 of 10 on file for this type
▸BISSUPERSEDING LETTER2
10/21/2019321472599Open ↗
10/15/2019321472599Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
07/25/2017321627414Open ↗
▸BISThird Party Electrical Signoff Compliance Report1
05/20/2013320059413Open ↗
▸Cost, Insurance & Ownership40
▸BISCOST AFFIDAVIT40
08/21/2018321826119Open ↗
02/14/2018321779802Open ↗
07/25/2017321627414Open ↗
Showing 3 of 40 on file for this type
▸Filing & Intake Forms42
▸BISEFILING COVER SHEET24
08/21/2018321826119Open ↗
02/14/2018321779802Open ↗
07/25/2017321627414Open ↗
Showing 3 of 24 on file for this type
▸BISADDITIONAL INFORMATION16
11/16/2018321472599Open ↗
04/05/2018321472599Open ↗
03/02/2018321472599Open ↗
Showing 3 of 16 on file for this type
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBOROUGH INTAKE FORM1
09/11/2018321627414Open ↗
▸Other Documents16
▸BISENVIRONMENTAL -E- DEP NOTICE OF SATIS5
01/10/2013320043644Open ↗
08/03/2012320369971Open ↗
10/18/2011320369971Open ↗
Showing 3 of 5 on file for this type
▸BISENVIRONMENTAL "E" DEP NOTICE TO PROCEED5
05/09/2014320850824Open ↗
Showing 1 of 5 on file for this type
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS3
05/29/2012320453665Open ↗
04/18/2012320230665Open ↗
01/23/2012320230665Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
02/14/2018321779802Open ↗
03/07/2017321472599Open ↗
▸BISPLOT DIAGRAM1
07/25/2017321627414Open ↗