← Back
Walk-up apt, over six families with stores
103 SMITH STREET
BROOKLYN · BIN 3325941
💬 Discuss this project
1900Year Built
4Stories
C7Building Class
R6AZoning
19,200 sfGross Floor Area
28Units
Rent Stabilized8 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 103-109 SMITH RESIDENCES, LLC · 8,400 sf lot · 2.29 FAR built · Flood zone X
Locations of Work
Architecture
Cellar1p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRIHILL MANAGEMENT303/22/2026
STERNA903/22/2026
103-109 SMITH RESIDENCES, LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/29/2018$15.0M—— → —$781/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CATAPANO ENGINEERING PC404/21/2022
LEON SKVIRSKY PE101/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CATAPANO ENGINEERING803/21/2026
BUILDING BROTHERS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL AMERICAN CONSTRUCTIONGeneral Contractor203/21/2026
KJK ELECTRIC INCElectrical103/22/2026
HP SERVICES INCPlumbing107/08/2026
PAUL SIGNSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CATAPANO ENGINEERING & AR3235404/21/2022
Building Lifecycle
All (25)Filed (5)Permit Issued (3)Signed Off (3)Violation (14)
07/03/2023
Violation issued (HPD, closed)
B
07/03/2023
Violation issued (HPD, closed)
B
07/03/2023
Violation issued (HPD, closed)
B
07/03/2023
Violation issued (HPD, closed)
B
05/22/2023
Violation issued (HPD, closed)
C
05/13/2022
Violation issued (HPD, open)
C
05/13/2022
Violation issued (HPD, open)
C
05/13/2022
Violation issued (HPD, open)
C
05/11/2022
Violation issued (HPD, open)
C
05/11/2022
Violation issued (HPD, open)
C
05/11/2022
Violation issued (HPD, open)
C
05/06/2022
Signed off — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN ((LOGO) INSOMNIA COOKIES)
B00635561-I1
05/03/2022
Signed off — Alteration
Proposing plumbing for Insomnia Cookies Retail Space - Replace Hot Water Heater in cellar, Replace & Relocate(1) Lavatory, (1) Toilet, Install (4) non residential sinks, (1) Grease Interceptor - all with associated piping, remove exist'g sink connections
B00616645-I1
05/02/2022
Signed off — Alteration
INSTALLATION OF INTERIOR PARTITIONS, FINISHES, ASSOCIATED CASEWORK, FIXTURES & EQUIPMENT FOR TENANT FIT-OUT. PROVIDE LOUVRE, DUCT HEATER W/ FAN. FIRE DAMPERS AT ALL PENETRATIONS.STRUCTURAL INSTALLING CONDENSER & AIR HANDLER UNIT, CONCRETE PAD FOR CU-2.
B00636880-I1
04/21/2022
Filed — Alteration
INSTALLATION OF INTERIOR PARTITIONS, FINISHES, ASSOCIATED CASEWORK, FIXTURES & EQUIPMENT FOR TENANT FIT-OUT. PROVIDE LOUVRE, DUCT HEATER W/ FAN. FIRE DAMPERS AT ALL PENETRATIONS.STRUCTURAL INSTALLING CONDENSER & AIR HANDLER UNIT, CONCRETE PAD FOR CU-2.
B00636880-P1
04/20/2022
Filed — Alteration
Proposing plumbing for Insomnia Cookies Retail Space - Replace Hot Water Heater in cellar, Replace & Relocate(1) Lavatory, (1) Toilet, Install (4) non residential sinks, (1) Grease Interceptor - all with associated piping, remove exist'g sink connections
B00616645-P1
03/08/2022
Violation issued (HPD, closed)
A
01/21/2022
Permit issued — Sign
B00635561-I1-SG
01/14/2022
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN ((LOGO) INSOMNIA COOKIES)
B00635561-I1
12/22/2021
Permit issued — Plumbing
B00616645-I1-PL
12/20/2021
Permit issued — Mechanical Systems
B00636880-I1-GC-CX
12/13/2021
Filed — Alteration
Proposing plumbing for Insomnia Cookies Retail Space - Replace Hot Water Heater in cellar, Replace & Relocate(1) Lavatory, (1) Toilet, Install (4) non residential sinks, (1) Grease Interceptor - all with associated piping, remove exist'g sink connections
B00616645-I1
12/13/2021
Filed — Alteration
INSTALLATION OF INTERIOR PARTITIONS, FINISHES, ASSOCIATED CASEWORK, FIXTURES & EQUIPMENT FOR TENANT FIT-OUT. PROVIDE LOUVRE, DUCT HEATER W/ FAN. FIRE DAMPERS AT ALL PENETRATIONS.STRUCTURAL INSTALLING CONDENSER & AIR HANDLER UNIT, CONCRETE PAD FOR CU-2.
B00636880-I1
12/07/2019
Violation issued (HPD, open)
C
11/02/2015
Violation issued (ECB, closed)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offPAUL SIGNS, INC01/21/2022
DOB NOWPlumbingSigned-offHP SERVICES INC12/22/2021
DOB NOWMechanical SystemsSigned-offALL AMERICAN CONSTRUCTION12/20/2021
BISPLISSUEDZARA PLUMBING CORP12/06/2016
BISMHISSUEDBRIAN S CONTRACTOR INC10/14/2016
BISOTISSUEDBRIAN S CONTRACTOR INC10/14/2016
BISEQISSUEDBRIAN S CONTRACTOR INC10/14/2016
BISBLISSUEDTOP PLUMBING GROUP,INC02/22/2016
BISPLISSUEDTOP PLUMBING GROUP,INC01/14/2016
BISPLISSUEDJOHN HLAD PLBG & HTG INC09/16/2003
BISBLISSUEDJOHN HLAD PLBG & HTG INC09/16/2003
BISOTISSUEDD C M DRY CLEANING MACHINERY07/06/1999
2 projects · most recent 02/11/2022
General Wiring
FiledStatusContractorScope
02/11/2022CompleteEMPIRE STATE ELECTL CORP—
01/07/2022Permit IssuedKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/26/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/12/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
04/21/2022HVAC-R and service water heating equipmentJOHN CATAPANOenergy_progress
04/21/2022Mechanical SystemsJOHN CATAPANOspecial
04/21/2022Fire-Resistant Penetrations and JointsJOHN CATAPANOspecial
04/21/2022Fire-Resistance Rated ConstructionJOHN CATAPANOprogress
04/21/2022Energy Code Compliance InspectionsJOHN CATAPANOprogress
04/21/2022FinalJOHN CATAPANOprogress
04/21/2022Lighting controlsJOHN CATAPANOenergy_progress
04/21/2022Maintenance informationJOHN CATAPANOenergy_progress
04/21/2022HVAC-R and service water piping design and insulationJOHN CATAPANOenergy_progress
04/21/2022HVAC-R and service water heating system controlsJOHN CATAPANOenergy_progress
04/21/2022Shutoff dampersJOHN CATAPANOenergy_progress
04/21/2022Interior lighting powerJOHN CATAPANOenergy_progress
04/18/2022Shutoff dampersJOHN CATAPANOenergy_progress
04/18/2022Fire-Resistant Penetrations and JointsJOHN CATAPANOspecial
04/18/2022Mechanical SystemsJOHN CATAPANOspecial
04/18/2022Energy Code Compliance InspectionsJOHN CATAPANOprogress
04/18/2022FinalJOHN CATAPANOprogress
04/18/2022Fire-Resistance Rated ConstructionJOHN CATAPANOprogress
04/18/2022HVAC-R and service water heating equipmentJOHN CATAPANOenergy_progress
04/18/2022Interior lighting powerJOHN CATAPANOenergy_progress
04/18/2022HVAC-R and service water heating system controlsJOHN CATAPANOenergy_progress
04/18/2022HVAC-R and service water piping design and insulationJOHN CATAPANOenergy_progress
04/18/2022Lighting controlsJOHN CATAPANOenergy_progress
04/18/2022Maintenance informationJOHN CATAPANOenergy_progress
11/22/2021FinalLEON SKVIRSKYprogress
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/31/2026B00616645-P1Request digital key ↗
08/31/2026B00616645-I1Request digital key ↗
08/31/2026B00636880-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits11
▸BISWORK PERMIT APPLICATION6
12/07/2016321453342Open ↗
10/18/2016321453342Open ↗
10/18/2016321453342Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
10/23/2019321453342Open ↗
09/26/2016321453342Open ↗
09/26/2016321453342Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
06/12/2019321453342Open ↗
12/07/2017321453342Open ↗
▸Seals & Professional Certifications24
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
11/23/2019321453342Open ↗
11/23/2019321453342Open ↗
11/12/2019321453342Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/31/2026B00616645-P1Open ↗
08/31/2026B00616645-I1Open ↗
08/31/2026B00636880-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/29/2026B00636880-P1Open ↗
08/29/2026B00636880-P1Open ↗
08/26/2026B00635561-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/26/2016321453342Open ↗
09/26/2016321453342Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026B00636880-P1Open ↗
08/22/2026B00636880-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/26/2016321453342Open ↗
▸Trade Schedules & Equipment6
▸BISEQUIPMENT USE APPLICATION/PERMIT2
12/23/2019321453342Open ↗
11/23/2019321453342Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
02/26/2016301568417Open ↗
02/26/2016301568417Open ↗
▸BISEQUIPMENT USE PERMITS1
11/23/2019321453342Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
09/26/2016321453342Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
09/26/2016321453342Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/31/2026B00616645-P1Open ↗
08/31/2026B00616645-I1Open ↗
08/31/2026B00636880-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/26/2016321453342Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
11/23/2019321453342Open ↗
11/23/2019321453342Open ↗
11/12/2019321453342Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/31/2026B00616645-I1Open ↗
08/31/2026B00636880-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/12/2019321453342Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
11/23/2019321453342Open ↗
11/12/2019321453342Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/12/2019321453342Open ↗
▸BISSUPERSEDING LETTER1
01/20/2016301568417Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/12/2019321453342Open ↗
09/26/2016321453342Open ↗
▸Filing & Intake Forms5
▸BISBOROUGH INTAKE FORM2
11/23/2019321453342Open ↗
11/12/2019321453342Open ↗
▸BISEFILING COVER SHEET2
09/20/2016321453342Open ↗
09/20/2016321453342Open ↗
▸BISADDITIONAL INFORMATION1
04/22/2016301568417Open ↗
▸Other Documents1
▸BISBPP - SUPPORTING DOCUMENTATION1
12/07/2017321453342Open ↗