Predominantly retail with other uses
1030 PROSPECT AVENUE
BRONX · BIN 2005237
💬 Discuss this project
1910Year Built
2Stories
K4Building Class
R7-1Zoning
3,917 sfGross Floor Area
3Units
13 Open Violations ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: BSD PROSPECT 1030 LLC · 1,706 sf lot · 2.3 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Floor 316p · 1 filing · 20 docs
Floor 216p · 1 filing · 20 docs
Floor 120p · 2 filings · 20 docs
Cellar17p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARK CONTRACTING GROUP LLC.503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/29/2024$450K—— → —$115/sf building
10/07/2024$450K—— → —$115/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PRAMODRAY SHAH, P.E.103/05/2026
MSM ENGINEERING SERVICES, PLLC611/18/2025
FOCAL POINT ARCHITECTS & ASS.112/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MISTER EXPEDITER603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PARK CONTRACTING GROUPGeneral Contractor303/21/2026
RICHARD NEUElectrical103/22/2026
TARGET PIPING NY LLCFire Protection107/08/2026
PRO AIR MECHANICAL CORPGeneral Contractor104/09/2026
B&B MECH PLBG & HTG LLCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM ENGINEERING SERVICES,8449211/18/2025
AG ENGINEERING PLLC8899206/16/2025
Building Lifecycle
All (145)Filed (8)Permit Issued (4)Signed Off (1)Violation (36)Inspection (13)Objection (57)Special Inspection (26)
04/27/2026
Objection resolved — Open
04/07/2026
Violation issued (ECB, open)
Construction
03/11/2026
Objection raised — Admin
03/11/2026
Objection raised — Structural
03/05/2026
Filed — Alteration CO
INSTALL FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13R 2016, AS MODIFIED BY NYC BC 2022 APPENDIX Q AS PER PLAN
X01161600-S3
02/24/2026
Special inspection requirement — Final
02/19/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/17/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/07/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/02/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/02/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/22/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/25/2025
Special inspection requirement — Sprinkler Systems
MOHAMED MAHMOUD
11/18/2025
Filed — Alteration CO
INSTALL FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13R 2016, AS MODIFIED BY NYC BC 2022 APPENDIX Q AS PER PLAN
X01161600-P2
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Special inspection requirement — Sprinkler Systems
MOHAMED MAHMOUD
10/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/24/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01215470-I1
09/22/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/21/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/07/2025
Permit issued — Sprinklers
X01161600-S2-EW-SP
08/01/2025
Objection resolved — Addressed
08/01/2025
Objection resolved — Addressed
08/01/2025
Objection resolved — Addressed
07/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/26/2025
Objection resolved — Addressed
06/18/2025
Objection raised — Admin
06/16/2025
Filed — Alteration CO
INSTALL FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13R 2016, AS MODIFIED BY NYC BC 2022 APPENDIX Q AS PER PLAN
X01161600-P1
06/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
ARIEL GOLSHAN
06/12/2025
Special inspection requirement — Maintenance information
ARIEL GOLSHAN
06/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ARIEL GOLSHAN
06/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
ARIEL GOLSHAN
06/12/2025
Special inspection requirement — Permanent certificate
ARIEL GOLSHAN
06/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ARIEL GOLSHAN
06/12/2025
Special inspection requirement — Energy Code Compliance Inspections
ARIEL GOLSHAN
05/12/2025
Objection resolved — Addressed
05/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/28/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01215470-I1
04/28/2025
Permit issued — Sidewalk Shed
X01215470-I1-SH
04/22/2025
Permit issued — Plumbing
X01161600-S1-PL
04/22/2025
Objection raised — Fire_Protection
04/21/2025
Objection resolved — Addressed
04/10/2025
Special inspection requirement — Permanent certificate
04/10/2025
Special inspection requirement — Air barrier — testing
04/10/2025
Special inspection requirement — Lighting in dwelling units
04/10/2025
Special inspection requirement — Maintenance information
04/08/2025
Filed — Alteration CO
INSTALL FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13R 2016, AS MODIFIED BY NYC BC 2022 APPENDIX Q AS PER PLAN
X01161600-S2
04/04/2025
Objection raised — Admin
04/03/2025
Filed — Alteration CO
INSTALL FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13R 2016, AS MODIFIED BY NYC BC 2022 APPENDIX Q AS PER PLAN
X01161600-S1
03/28/2025
Objection resolved — Addressed
03/28/2025
Objection resolved — Addressed
03/28/2025
Objection resolved — Addressed
03/28/2025
Objection resolved — Addressed
03/28/2025
Objection resolved — Addressed
03/28/2025
Objection resolved — Addressed
03/28/2025
Objection resolved — Addressed
03/28/2025
Objection resolved — Addressed
03/28/2025
Objection resolved — Addressed
Latest 60 of 145 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedTARGET PIPING NY LLC08/07/2025
DOB NOWSidewalk ShedSigned-offPARK CONTRACTING GROUP04/28/2025
DOB NOWPlumbingPermit IssuedTARGET PIPING NY LLC04/22/2025
DOB NOWGeneral ConstructionPermit IssuedPRO AIR MECHANICAL12/17/2024
1 project · most recent 03/05/2026
Sprinkler System
FiledStatusContractorScope
03/05/2026Permit IssuedTARGET PIPING NY LLCSprinkler System
1 project · most recent 03/05/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/05/2026Permit IssuedB&B MECH PLBG & HTG LLCGas, Storm, Water/Sanitary
2 projects · most recent 04/28/2025
General Wiring
FiledStatusContractorScope
04/28/2025Permit IssuedRICHARD NEU—
12/29/2024Permit IssuedACCURATE ELEC'L CORP.General Wiring
1 project · most recent 03/05/2026
FiledStatusContractorScope
03/05/2026Permit IssuedB&B MECH PLBG & HTG LLC1 scope_items
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
02/19/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/17/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/07/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/02/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/22/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/21/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
02/24/2026Final—progress
11/25/2025Sprinkler SystemsMOHAMED MAHMOUDspecial
11/14/2025Sprinkler SystemsMOHAMED MAHMOUDspecial
06/12/2025HVAC-R and service water heating system controlsARIEL GOLSHANenergy_progress
06/12/2025Maintenance informationARIEL GOLSHANenergy_progress
06/12/2025HVAC-R and service water piping design and insulationARIEL GOLSHANenergy_progress
06/12/2025HVAC-R and service water heating equipmentARIEL GOLSHANenergy_progress
06/12/2025Permanent certificateARIEL GOLSHANenergy_progress
06/12/2025Fire-Resistant Penetrations and JointsARIEL GOLSHANspecial
06/12/2025Energy Code Compliance InspectionsARIEL GOLSHANprogress
04/10/2025Permanent certificate—energy_progress
04/10/2025Air barrier — testing —energy_progress
04/10/2025Lighting in dwelling units—energy_progress
04/10/2025Maintenance information—energy_progress
01/29/2025Energy Code Compliance Inspections—progress
01/29/2025Fire-Resistance Rated Construction—progress
01/29/2025Fenestration and door U-factor and product ratings—energy_progress
01/29/2025Insulation placement and R values—energy_progress
01/29/2025Fenestration areas—energy_progress
01/29/2025Metering—energy_progress
01/29/2025Fenestration air leakage—energy_progress
01/29/2025Air barrier - visual inspection—energy_progress
01/29/2025Fire-Resistant Penetrations and Joints—special
12/05/2024Energy Code Compliance InspectionsARIEL GOLSHANprogress
12/05/2024Fire-Resistance Rated ConstructionARIEL GOLSHANprogress
Latest 25 of 26.
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/20/2026X01146551-I1Request digital key ↗
08/19/2026X01215470-I1Request digital key ↗
08/17/2026X01161600-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026X01161600-I1Open ↗
08/13/2026X01161600-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X01161600-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026X01161600-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/20/2026X01146551-I1Open ↗
08/13/2026X01161600-S3Open ↗
08/13/2026X01161600-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/22/2026X01161600-P1Open ↗
09/22/2026X01161600-P1Open ↗
08/24/2026X01146551-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/22/2026X01161600-P1Open ↗
09/01/2026X01161600-P2Open ↗
08/31/2026X01161600-S2Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026X01161600-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/20/2026X01146551-I1Open ↗
08/13/2026X01161600-P1Open ↗
08/13/2026X01161600-S2Open ↗
Showing 3 of 7 on file for this type
▸Other Documents4
▸DOB NOWPlot Diagram1
08/13/2026X01161600-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026X01161600-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026X01161600-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026X01161600-I1Open ↗