← Back
Two family frame
1031 60 STREET
BROOKLYN · BIN 3140985
💬 Discuss this project
1910Year Built
2Stories
B2Building Class
M1-1Zoning
2,120 sfGross Floor Area
2Units
Two family frame · Owner of record: FA-YI CHONG-DE GUANG-HUI ASSOCIATION INC . · 1,975 sf lot · 1.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Floor 23p · 1 filing · 12 docs
Floor 13p · 2 filings · 16 docs
Cellar2p · 2 filings · 16 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/11/2022$1.2M—Private party → FA-YI CHONG-DE GUANG-HUI ASSOCIATION INC.$566/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI602/02/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A ELECTRICAL MAIN SVC INCElectrical203/22/2026
SPLEN CONSTRUCTION INCGeneral Contractor107/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394402/02/2023
Building Lifecycle
All (23)Filed (6)Permit Issued (2)Signed Off (2)Inspection (7)Special Inspection (6)
02/07/2023
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B07996585-I1
02/06/2023
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B07996590-I1
02/06/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/02/2023
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B07996585-P3
02/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
02/02/2023
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
02/02/2023
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
01/27/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/06/2023
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B07996590-P1
01/06/2023
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B07996585-P2
12/08/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/08/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/08/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/08/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/08/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/18/2022
Permit issued — Plumbing
B07996590-I1-PL
10/13/2022
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B07996585-P1
10/13/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
10/13/2022
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
10/13/2022
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
09/13/2022
Permit issued — General Construction
B07996585-I1-GC
09/05/2022
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B07996585-I1
09/05/2022
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B07996590-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG10/18/2022
DOB NOWGeneral ConstructionSigned-offSPLEN CONSTRUCTION INC09/13/2022
2 projects · most recent 01/27/2023
HVAC Wiring General Wiring
FiledStatusContractorScope
01/27/2023CompleteA ELECTRICAL MAIN SVC INCHVAC Wiring
10/21/2022CompleteA ELECTRICAL MAIN SVC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/06/2023Pass-Final General Construction Non-Directive 14PassView ↗
01/27/2023Fail-Final General Construction Non-Directive 14FailView ↗
12/08/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/08/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/08/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/08/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
02/02/2023Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
02/02/2023Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
02/02/2023Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
10/13/2022Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
10/13/2022Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
10/13/2022Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/28/2026B07996590-P1Request digital key ↗
08/28/2026B07996590-I1Request digital key ↗
08/28/2026B07996585-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/28/2026B07996590-P1Open ↗
08/28/2026B07996590-I1Open ↗
08/28/2026B07996585-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026B07996585-P3Open ↗
08/24/2026B07996585-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026B07996585-P3Open ↗
08/24/2026B07996585-P1Open ↗