← Back
Two family brick
1031 BAY RIDGE PKWY
BROOKLYN · Dyker Heights · BIN 3148550
💬 Discuss this project
1955Year Built
2Stories
B1Building Class
R5BZoning
2,235 sfGross Floor Area
2Units
Two family brick · 1,550 sf lot · 1.44 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 29p · 2 filings · 20 docs
Floor 17p · 2 filings · 20 docs
Cellar9p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HPL ENGINEERING P.C.509/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM CONSULTANT STUDIO1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GOLDEN TIME CONTRACTING IGeneral Contractor303/21/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC5613509/08/2021
Building Lifecycle
All (34)Filed (5)Permit Issued (2)Signed Off (2)Special Inspection (25)
10/04/2021
Signed off — Alteration
RENOVATE CELLAR, 1ST & 2ND FLOOR FOR AN EXISTING 2 STORY, 2 FAMILY HOUSE. NEW PARTITION WORK AS PER PLAN SUBMITTED. PLUMBING WORK TO BE FILED UNDER DOBNow APPLICATION#: B00499018. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00498912-I1
09/29/2021
Signed off — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow GENERAL CONSTRUCTION JOB#: B00498912. CAP & REMOVE TOILET, LAV., HWH & BOILER AT CEL. RELOCATE SLOP SINK AT CEL. INSTALL NEW TOILET, LAV., 2 HWH & 2 BOILER AT CEL. INSTALL NEW BATHROOM ON 1ST & 2ND FL.
B00499018-I1
09/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
09/09/2021
Special inspection requirement — Maintenance information
Fran Huang
09/09/2021
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
09/09/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
09/09/2021
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
09/09/2021
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
09/08/2021
Filed — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow GENERAL CONSTRUCTION JOB#: B00498912. CAP & REMOVE TOILET, LAV., HWH & BOILER AT CEL. RELOCATE SLOP SINK AT CEL. INSTALL NEW TOILET, LAV., 2 HWH & 2 BOILER AT CEL. INSTALL NEW BATHROOM ON 1ST & 2ND FL.
B00499018-P3
09/01/2021
Special inspection requirement — Maintenance information
Fran Huang
09/01/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
09/01/2021
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
09/01/2021
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
09/01/2021
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
09/01/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
08/19/2021
Filed — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow GENERAL CONSTRUCTION JOB#: B00498912. CAP & REMOVE TOILET, LAV., HWH & BOILER AT CEL. RELOCATE SLOP SINK AT CEL. INSTALL NEW TOILET, LAV., 2 HWH & 2 BOILER AT CEL. INSTALL NEW BATHROOM ON 1ST & 2ND FL.
B00499018-P2
08/18/2021
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
08/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
08/18/2021
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
08/18/2021
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
08/18/2021
Special inspection requirement — Maintenance information
Fran Huang
08/18/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
08/02/2021
Filed — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow GENERAL CONSTRUCTION JOB#: B00498912. CAP & REMOVE TOILET, LAV., HWH & BOILER AT CEL. RELOCATE SLOP SINK AT CEL. INSTALL NEW TOILET, LAV., 2 HWH & 2 BOILER AT CEL. INSTALL NEW BATHROOM ON 1ST & 2ND FL.
B00499018-P1
04/21/2021
Permit issued — Plumbing
B00499018-I1-PL
04/20/2021
Permit issued — General Construction
B00498912-I1-GC
04/09/2021
Filed — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow GENERAL CONSTRUCTION JOB#: B00498912. CAP & REMOVE TOILET, LAV., HWH & BOILER AT CEL. RELOCATE SLOP SINK AT CEL. INSTALL NEW TOILET, LAV., 2 HWH & 2 BOILER AT CEL. INSTALL NEW BATHROOM ON 1ST & 2ND FL.
B00499018-I1
04/08/2021
Filed — Alteration
RENOVATE CELLAR, 1ST & 2ND FLOOR FOR AN EXISTING 2 STORY, 2 FAMILY HOUSE. NEW PARTITION WORK AS PER PLAN SUBMITTED. PLUMBING WORK TO BE FILED UNDER DOBNow APPLICATION#: B00499018. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00498912-I1
04/07/2021
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
04/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
04/07/2021
Special inspection requirement — Permanent certificate
Fran Huang
04/07/2021
Special inspection requirement — Interior lighting power
Fran Huang
04/07/2021
Special inspection requirement — Fenestration air leakage
Fran Huang
04/07/2021
Special inspection requirement — Air barrier - visual inspection
Fran Huang
04/06/2021
Special inspection requirement — Final
Fran Huang
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG04/21/2021
DOB NOWGeneral ConstructionSigned-offGOLDEN TIME CONTRACTING I04/20/2021
BISOTISSUEDHIGH QUALITY CONSTRUCTION06/14/2019
1 project · most recent 05/08/2021
General Wiring
FiledStatusContractorScope
05/08/2021CompleteR & T ELECTRICAL CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
09/09/2021Fire-Resistant Penetrations and JointsFran Huangspecial
09/09/2021Maintenance informationFran Huangenergy_progress
09/09/2021HVAC-R and service water heating system controlsFran Huangenergy_progress
09/09/2021HVAC-R and service water piping design and insulationFran Huangenergy_progress
09/09/2021HVAC-R and service water heating equipmentFran Huangenergy_progress
09/09/2021Energy Code Compliance InspectionsFran Huangprogress
09/01/2021Maintenance informationFran Huangenergy_progress
09/01/2021Fire-Resistant Penetrations and JointsFran Huangspecial
09/01/2021Energy Code Compliance InspectionsFran Huangprogress
09/01/2021HVAC-R and service water heating system controlsFran Huangenergy_progress
09/01/2021HVAC-R and service water heating equipmentFran Huangenergy_progress
09/01/2021HVAC-R and service water piping design and insulationFran Huangenergy_progress
08/18/2021HVAC-R and service water heating system controlsFran Huangenergy_progress
08/18/2021Fire-Resistant Penetrations and JointsFran Huangspecial
08/18/2021Energy Code Compliance InspectionsFran Huangprogress
08/18/2021HVAC-R and service water heating equipmentFran Huangenergy_progress
08/18/2021Maintenance informationFran Huangenergy_progress
08/18/2021HVAC-R and service water piping design and insulationFran Huangenergy_progress
04/07/2021Energy Code Compliance InspectionsFran Huangprogress
04/07/2021Fire-Resistant Penetrations and JointsFran Huangspecial
04/07/2021Permanent certificateFran Huangenergy_progress
04/07/2021Interior lighting powerFran Huangenergy_progress
04/07/2021Fenestration air leakageFran Huangenergy_progress
04/07/2021Air barrier - visual inspectionFran Huangenergy_progress
04/06/2021FinalFran Huangprogress
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00498912-I1Request digital key ↗
09/01/2026B00499018-P1Request digital key ↗
09/01/2026B00499018-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
06/17/2019321965183Open ↗
▸BISWORK PERMIT APPLICATION1
06/17/2019321965183Open ↗
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature21
09/27/2026B00498912-I1Open ↗
09/27/2026B00498912-I1Open ↗
09/27/2026B00498912-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026B00499018-P1Open ↗
08/13/2026B00498912-I1Open ↗
08/13/2026B00499018-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/27/2026B00498912-I1Open ↗
08/26/2026B00499018-P3Open ↗
08/24/2026B00499018-P2Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
09/05/2019321965183Open ↗
06/17/2019321965183Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/17/2019321965183Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/17/2019321965183Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
06/17/2019321965183Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026B00499018-P3Open ↗
08/13/2026B00499018-P2Open ↗
08/13/2026B00499018-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/17/2019321965183Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00499018-I1Open ↗
08/13/2026B00498912-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/05/2019321965183Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/05/2019321965183Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/05/2019321965183Open ↗
06/17/2019321965183Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION1
08/22/2019321965183Open ↗
▸BISBOROUGH INTAKE FORM1
09/05/2019321965183Open ↗
▸BISEFILING COVER SHEET1
06/17/2019321965183Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/13/2026B00499018-P1Open ↗