Over six families without stores
Tbx1003-sandra Erickson Real Estate
1033 CAULDWELL AVENUE · BIN 2004405
💬 Discuss this project
1910Year Built
6Stories
C1Building Class
R6Zoning
15,090 sfGross Floor Area
24Units
Rent Stabilized12 Open Violations 11 unresolved · 1 paperwork only ▸
Over six families without stores · Owner of record: SEAMAN HOUSING DEVELOPMENT FUND CORPORAT ION · 3,599 sf lot · 4.19 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof2p · 1 filing · 10 docs
Floor 112p · 1 filing · 20 docs
Cellar13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VIK XS SERVICES907/08/2026
NEIGHBORHOOD RESTORE HDFC1207/08/2026
REPUBLIC EXTERIOR SERVICES703/22/2026
SEAMAN HOUSING DEVELOPMENT FUND CORPORAT ION103/22/2026
1033 CAULDWELL AV HDFC203/22/2026
GRANT TPT LLC1103/21/2026
HPD403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
APPLIED HVAC ENGINEERING, PLLC808/18/2025
SYNERGIC DESIGN ARCHITECTS103/21/2025
OSPINO ENGINEERING PLLC211/15/2023
URBAN INTEGRATIONS108/15/2023
OCV ARCHITECTS107/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OCV ARCHITECTS603/21/2026
Code Compliance Consulting303/21/2026
AO CONSULTING AND DRAFTING403/21/2026
Rigid Structural Design, LLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REPUBLIC EXTERIOR SERVICEGeneral Contractor603/21/2026
BENT MECHANICAL CORPPlumbing507/08/2026
LEMLE & WOLFF CONSTR CORPGeneral Contractor207/08/2026
CONSTANCE GARGIULOElectrical103/21/2026
ACCORD POWER INCGeneral Contractor107/08/2026
VIK XS SERVICES INCGeneral Contractor107/08/2026
SIGMOND FRIEDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HANSEN ENGINEERING PC8174908/18/2025
METRIC CONSULTING AND INS1803908/18/2025
SYNERGIC DESIGN LLC8561103/21/2025
Building Lifecycle
All (143)Filed (13)Permit Issued (13)Signed Off (5)Violation (60)Inspection (8)Objection (14)Special Inspection (30)
03/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/19/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/19/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/20/2026
Violation issued (HPD, closed)
C
01/20/2026
Violation issued (HPD, closed)
C
01/20/2026
Violation issued (HPD, closed)
C
01/06/2026
Signed off — Alteration
INSTALLATION OF NEW GAS-FIRED HOT WATER BOILER
X00613680-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/26/2025
Permit issued — Plumbing
X00613680-S3-PL
09/23/2025
Permit issued — Boiler Equipment
X00613680-S2-BE
09/12/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
Kenneth Wille
08/28/2025
Special inspection requirement — Maintenance information
Kenneth Wille
08/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
08/28/2025
Special inspection requirement — High Temperature Hot Water Piping (Welding)
SAMI HAJJAR P.E
08/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Kenneth Wille
08/28/2025
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
08/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
Kenneth Wille
08/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
08/18/2025
Filed — Alteration
INSTALLATION OF NEW GAS-FIRED HOT WATER BOILER
X00613680-P7
08/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
Kenneth Wille
08/14/2025
Special inspection requirement — Maintenance information
Kenneth Wille
08/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
08/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
Kenneth Wille
08/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Kenneth Wille
08/14/2025
Special inspection requirement — High Temperature Hot Water Piping (Welding)
SAMI HAJJAR P.E
08/14/2025
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
08/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
07/23/2025
Filed — Alteration
INSTALLATION OF NEW GAS-FIRED HOT WATER BOILER
X00613680-P6
07/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/07/2025
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
06/23/2025
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
SAMI HAJJAR P.E
06/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
06/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
06/23/2025
Special inspection requirement — Maintenance information
Kenneth Wille
06/16/2025
Objection resolved — Addressed
06/16/2025
Special inspection requirement — High-Pressure Steam Piping (Welding)
SAMI HAJJAR P.E
06/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Kenneth Wille
06/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
Kenneth Wille
06/16/2025
Special inspection requirement — High Temperature Hot Water Piping (Welding)
SAMI HAJJAR P.E
06/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
06/16/2025
Special inspection requirement — Maintenance information
Kenneth Wille
06/16/2025
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
06/16/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
SAMI HAJJAR P.E
06/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
06/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
Kenneth Wille
06/10/2025
Signed off — Alteration
Supported Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy
X00916003-S2
06/10/2025
Objection raised — Other
06/09/2025
Filed — Alteration
INSTALLATION OF NEW GAS-FIRED HOT WATER BOILER
X00613680-P4
06/05/2025
Filed — Alteration
INSTALLATION OF NEW GAS-FIRED HOT WATER BOILER
X00613680-P3
06/05/2025
Signed off — Alteration
Supported Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy
X00916003-S1
06/05/2025
Permit issued — Suspended Scaffold
X00916003-S2-SC
06/04/2025
Filed — Alteration
INSTALLATION OF NEW GAS-FIRED HOT WATER BOILER
X00613680-P2
05/29/2025
Signed off — Alteration
Installation of 6 KW DC Solar PV on roof. No change of occupancy, use or egress.
X01195593-I1
04/28/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/15/2025
Permit issued — Boiler Equipment
X00613680-S1-BE
03/31/2025
Permit issued — Solar
X01195593-I1-SL
03/21/2025
Filed — Alteration
Installation of 6 KW DC Solar PV on roof. No change of occupancy, use or egress.
X01195593-I1
11/02/2024
Violation issued (HPD, closed)
A
Latest 60 of 143 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBENT MECHANICAL CORP09/26/2025
DOB NOWBoiler EquipmentSigned-offBENT MECHANICAL CORP09/23/2025
DOB NOWSuspended ScaffoldSigned-offVIK XS SERVICES INC06/05/2025
DOB NOWBoiler EquipmentSigned-offBENT MECHANICAL CORP04/15/2025
DOB NOWSolarSigned-offACCORD POWER INC03/31/2025
DOB NOWBoiler EquipmentSigned-offBENT MECHANICAL CORP08/13/2024
DOB NOWPlumbingPermit IssuedBENT MECHANICAL CORP08/13/2024
DOB NOWGeneral ConstructionSigned-offLEMLE WOLFF CONSTR07/17/2024
DOB NOWSidewalk ShedSigned-offREPUBLIC EXTERIOR SERVICE07/16/2024
DOB NOWSuspended ScaffoldSigned-offVIK XS SERVICES INC11/15/2023
DOB NOWSupported ScaffoldSigned-offVIK XS SERVICES INC11/15/2023
DOB NOWSidewalk ShedSigned-offREPUBLIC EXTERIOR SERVICE08/16/2023
DOB NOWGeneral ConstructionSigned-offLEMLE WOLFF CONSTR07/21/2023
BIS—ISSUEDE.E.C. GROUP, INC.09/13/2005
BISEQISSUEDHI TECH BRIDGING INC.01/31/2005
BIS—ISSUEDE.E.C. GROUP, INC.12/06/2004
BISOTISSUEDS.J. FUEL03/27/2001
BISOTISSUEDF S BUILDERS OF LIC INC10/16/1996
BISFBISSUEDBROOK FUEL OIL CORP06/23/1993
1 project · most recent 08/18/2025
Gas Water/Sanitary
FiledStatusContractorScope
08/18/2025Permit IssuedBENT MECHANICAL CORPGas, Water/Sanitary
4 projects · most recent 01/21/2026
FiledStatusContractorScope
01/21/2026CompleteLAURA ELEC'L LIGHTING &—
03/20/2025CompleteACCORD POWER ELECTRIC LLC—
08/07/2023CompleteNASH ELECTRIC SERVICES IN—
11/28/2018CompleteNOBLE ELECL CONTRG CO INC26 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/19/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/19/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/12/2025Pass-Final Boiler Equipment InspectionPassView ↗
07/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/07/2025Fail-Final Boiler Equipment InspectionFailView ↗
04/28/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 69
DateRequirementInspectorRole
08/28/2025Maintenance informationKenneth Willeenergy_progress
08/28/2025HVAC-R and service water heating equipmentKenneth Willeenergy_progress
08/28/2025Heating SystemsSAMI HAJJAR P.Especial
08/28/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
08/28/2025High Temperature Hot Water Piping (Welding)SAMI HAJJAR P.Especial
08/28/2025Fire-Resistant Penetrations and JointsRyan Hansenspecial
08/28/2025HVAC-R and service water heating system controlsKenneth Willeenergy_progress
08/28/2025HVAC-R and service water piping design and insulationKenneth Willeenergy_progress
08/14/2025High Temperature Hot Water Piping (Welding)SAMI HAJJAR P.Especial
08/14/2025Heating SystemsSAMI HAJJAR P.Especial
08/14/2025Fire-Resistant Penetrations and JointsRyan Hansenspecial
08/14/2025HVAC-R and service water heating equipmentKenneth Willeenergy_progress
08/14/2025Maintenance informationKenneth Willeenergy_progress
08/14/2025HVAC-R and service water piping design and insulationKenneth Willeenergy_progress
08/14/2025HVAC-R and service water heating system controlsKenneth Willeenergy_progress
08/14/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
06/23/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
06/23/2025Maintenance informationKenneth Willeenergy_progress
06/23/2025Fire-Resistant Penetrations and JointsRyan Hansenspecial
06/23/2025High-Pressure Fuel-Gas Piping (Welding)SAMI HAJJAR P.Especial
06/16/2025Heating SystemsSAMI HAJJAR P.Especial
06/16/2025Fire-Resistant Penetrations and JointsRyan Hansenspecial
06/16/2025High Temperature Hot Water Piping (Welding)SAMI HAJJAR P.Especial
06/16/2025HVAC-R and service water heating equipmentKenneth Willeenergy_progress
06/16/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsSAMI HAJJAR P.Especial
Latest 25 of 69.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/22/2026X00916003-S1Request digital key ↗
08/22/2026X00916003-I1Request digital key ↗
08/22/2026X00916003-S2Request digital key ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications44
▸DOB NOWSpecial Inspector Seal & Signature18
09/23/2026X00613680-S1Open ↗
09/23/2026X00613680-S2Open ↗
09/23/2026X00613680-S1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/22/2026X00916003-S1Open ↗
08/22/2026X00916003-I1Open ↗
08/22/2026X00916003-S2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/23/2026X00613680-S1Open ↗
09/23/2026X00613680-S2Open ↗
09/01/2026X00613680-P7Open ↗
Showing 3 of 13 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/18/2026X00613680-S1Open ↗
08/18/2026X00613680-I1Open ↗
08/18/2026X00613680-S3Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification1
08/18/2026X00613680-S1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00613680-I1Open ↗
▸Approvals, Objections & Sign-offs15
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/13/2026X00613680-S1Open ↗
08/13/2026X00613680-I1Open ↗
08/13/2026X00613680-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP Variance (V5) letter4
08/13/2026X00613680-S2Open ↗
08/13/2026X00613680-I1Open ↗
08/13/2026X00613680-S3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01195593-I1Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026X00916003-S2Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X00916003-S2Open ↗