← Back
Primarily 2 family with 1 store or office
1034 NOSTRAND AVENUE
BROOKLYN · BIN 3035054
💬 Discuss this project
1925Year Built
3Stories
S2Building Class
R7-1Zoning
3,180 sfGross Floor Area
3Units
Rent Stabilized98 Open Violations 96 unresolved · 2 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 15 EAST 19TH ST LLC · 1,157 sf lot · 2.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof13p · 1 filing · 20 docs
Floor 39p · 1 filing · 20 docs
Floor 27p · 1 filing · 20 docs
Floor 111p · 1 filing · 20 docs
Cellar9p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3M MGMT2207/08/2026
ALL EMPIRE BUILDING CONTRACTORS INC503/22/2026
15 EAST 19TH ST LLC 1103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/31/2018$2.2M—— → —$692/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MDG DESIGN GROUP605/30/2025
ASHRAF CORP103/27/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M-DIS DESIGN GROUP603/21/2026
SHEIKH EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
O.R.B. STAR CONSTRUCTIONGeneral Contractor807/08/2026
ALL EMPIRE BUILDING CONGeneral Contractor303/21/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SEAD ENGINEERING PC2665505/30/2025
Building Lifecycle
All (141)Filed (7)Permit Issued (8)Signed Off (1)Violation (60)Inspection (3)Objection (32)Special Inspection (30)
07/02/2025
Special inspection requirement — Structural Steel - Details
INHWAN CHANG
07/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
INHWAN CHANG
07/02/2025
Special inspection requirement — Duct leakage testing, insulation and design
INHWAN CHANG
07/02/2025
Special inspection requirement — Lighting controls
INHWAN CHANG
07/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
INHWAN CHANG
07/02/2025
Special inspection requirement — Interior lighting power
INHWAN CHANG
07/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
INHWAN CHANG
07/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
INHWAN CHANG
07/02/2025
Special inspection requirement — Final
YUNHO LEE
07/02/2025
Special inspection requirement — Energy Code Compliance Inspections
INHWAN CHANG
07/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
INHWAN CHANG
07/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
07/02/2025
Special inspection requirement — Mechanical Systems
INHWAN CHANG
07/02/2025
Special inspection requirement — Structural Steel - Welding
INHWAN CHANG
07/01/2025
Objection raised — Scope
07/01/2025
Objection resolved — Addressed
06/18/2025
Objection resolved — Addressed
06/18/2025
Objection resolved — Addressed
06/16/2025
Objection resolved — Addressed
06/10/2025
Objection resolved — Addressed
06/06/2025
Objection raised — Scope
06/06/2025
Objection raised — Scope
06/06/2025
Objection raised — Scope
06/06/2025
Objection raised — Scope
05/30/2025
Filed — Alteration
HEREWITH FILE TO INSTALL TEMPORARY CONSTRUCTION FENCE (WITHIN 3'-0" FROM PROPERTY LINE) FOR RETAIL STORE STORE-FRONT MODIFICATION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B08029134-P3
04/16/2025
Violation issued (ECB, open)
Construction
01/06/2025
Permit issued — General Construction
B08029134-I1-GC-CX
07/06/2024
Signed off — Alteration
HEREWITH FILE TO INSTALL TEMPORARY CONSTRUCTION FENCE (WITHIN 3'-0" FROM PROPERTY LINE) FOR RETAIL STORE STORE-FRONT MODIFICATION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B08029134-S2
03/29/2024
Permit issued — Sidewalk Shed
B01025541-I1-SH
03/27/2024
Filed — Alteration
B01025541-I1
03/18/2024
Special inspection requirement — Energy Code Compliance Inspections
INHWAN CHANG
03/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
03/18/2024
Special inspection requirement — Mechanical Systems
INHWAN CHANG
03/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
INHWAN CHANG
03/18/2024
Special inspection requirement — Structural Steel - Details
INHWAN CHANG
03/18/2024
Special inspection requirement — Structural Steel - Welding
INHWAN CHANG
03/18/2024
Special inspection requirement — Final
YUNHO LEE
03/18/2024
Special inspection requirement — Fire-Resistance Rated Construction
INHWAN CHANG
03/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
INHWAN CHANG
03/18/2024
Special inspection requirement — Interior lighting power
INHWAN CHANG
03/18/2024
Special inspection requirement — HVAC-R and service water heating system controls
INHWAN CHANG
03/18/2024
Special inspection requirement — Lighting controls
INHWAN CHANG
03/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
INHWAN CHANG
03/18/2024
Special inspection requirement — Duct leakage testing, insulation and design
INHWAN CHANG
01/16/2024
Permit issued — General Construction
B08029134-I1-MS
01/16/2024
Permit issued — Structural
B08029134-I1-GC-CX
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/15/2023
Filed — Alteration
HEREWITH FILE TO INSTALL TEMPORARY CONSTRUCTION FENCE (WITHIN 3'-0" FROM PROPERTY LINE) FOR RETAIL STORE STORE-FRONT MODIFICATION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B08029134-P2
03/14/2023
Special inspection requirement — Mechanical Systems
INHWAN CHANG
03/14/2023
Special inspection requirement — Structural Steel - Details
INHWAN CHANG
02/23/2023
Filed — Alteration
HEREWITH FILE TO INSTALL TEMPORARY CONSTRUCTION FENCE (WITHIN 3'-0" FROM PROPERTY LINE) FOR RETAIL STORE STORE-FRONT MODIFICATION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B08029134-P1
02/23/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/23/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/23/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/07/2023
Permit issued — Plumbing
B08029134-S1-PL
01/23/2023
Permit issued — General Construction
B08029134-I1-MS
01/20/2023
Permit issued — Construction Fence
B08029134-S2-FN
01/20/2023
Permit issued — Mechanical Systems
B08029134-I1-GC-CX
12/28/2022
Objection raised — Admin
Latest 60 of 141 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedO.R.B. STAR CONSTRUCTION01/06/2025
DOB NOWSidewalk ShedPermit IssuedALL EMPIRE BUILDING CON03/29/2024
DOB NOWGeneral ConstructionSigned-offO.R.B. STAR CONSTRUCTION01/16/2024
DOB NOWStructuralPermit IssuedO.R.B. STAR CONSTRUCTION01/16/2024
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG02/07/2023
DOB NOWGeneral ConstructionSigned-offO.R.B. STAR CONSTRUCTION01/23/2023
DOB NOWConstruction FenceSigned-offO.R.B. STAR CONSTRUCTION01/20/2023
DOB NOWMechanical SystemsPermit IssuedO.R.B. STAR CONSTRUCTION01/20/2023
BISOTISSUEDNOVA PLUMBING & HEATING INC10/06/1998
1 project · most recent 05/30/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/30/2025Permit IssuedO.R.B. STAR CONSTRUCTIONHeating and Air Conditioning Systems
Heat / Cool
Carrier 24AHA460A300 57,000 BTU · Split System ×1
1 project · most recent 05/30/2025
Gas Water/Sanitary
FiledStatusContractorScope
05/30/2025Signed-offJOHN FITZGERALD PLBG &HTGGas, Water/Sanitary
2 projects · most recent 07/25/2023
General Wiring
FiledStatusContractorScope
07/25/2023CompleteHI-RITE ELECTRIC CORP3 meters, 3 new_meters
02/14/2023Permit IssuedSCOTT ELEC'L SERVICE, LLCGeneral Wiring
1 project · most recent 05/30/2025
Steel
FiledStatusContractorScope
05/30/2025Permit IssuedO.R.B. STAR CONSTRUCTIONSteel
1 project · most recent 05/30/2025
Fence
FiledStatusContractorScope
05/30/2025Permit IssuedO.R.B. STAR CONSTRUCTIONFence
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/23/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/23/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/23/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
07/02/2025Structural Steel - DetailsINHWAN CHANGspecial
07/02/2025HVAC-R and service water heating equipmentINHWAN CHANGenergy_progress
07/02/2025Duct leakage testing, insulation and designINHWAN CHANGenergy_progress
07/02/2025Lighting controlsINHWAN CHANGenergy_progress
07/02/2025HVAC-R and service water heating system controlsINHWAN CHANGenergy_progress
07/02/2025Interior lighting powerINHWAN CHANGenergy_progress
07/02/2025HVAC-R and service water piping design and insulationINHWAN CHANGenergy_progress
07/02/2025Fire-Resistance Rated ConstructionINHWAN CHANGprogress
07/02/2025FinalYUNHO LEEprogress
07/02/2025Energy Code Compliance InspectionsINHWAN CHANGprogress
07/02/2025Structural Stability – Alterations of existing buildingsINHWAN CHANGspecial
07/02/2025Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
07/02/2025Mechanical SystemsINHWAN CHANGspecial
07/02/2025Structural Steel - WeldingINHWAN CHANGspecial
03/18/2024Energy Code Compliance InspectionsINHWAN CHANGprogress
03/18/2024Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
03/18/2024Mechanical SystemsINHWAN CHANGspecial
03/18/2024Structural Stability – Alterations of existing buildingsINHWAN CHANGspecial
03/18/2024Structural Steel - DetailsINHWAN CHANGspecial
03/18/2024Structural Steel - WeldingINHWAN CHANGspecial
03/18/2024FinalYUNHO LEEprogress
03/18/2024Fire-Resistance Rated ConstructionINHWAN CHANGprogress
03/18/2024HVAC-R and service water piping design and insulationINHWAN CHANGenergy_progress
03/18/2024Interior lighting powerINHWAN CHANGenergy_progress
03/18/2024HVAC-R and service water heating system controlsINHWAN CHANGenergy_progress
Latest 25 of 44.
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/28/2026B08029134-P2Request digital key ↗
08/28/2026B08029134-P1Request digital key ↗
08/28/2026B08029134-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications51
▸DOB NOWProgress Inspector Seal & Signature27
09/17/2026B08029134-I1Open ↗
09/17/2026B08029134-I1Open ↗
09/17/2026B08029134-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/27/2026B08029134-S1Open ↗
09/17/2026B08029134-I1Open ↗
09/17/2026B08029134-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026B08029134-P2Open ↗
08/28/2026B08029134-S1Open ↗
08/28/2026B08029134-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/28/2026B08029134-P2Open ↗
08/28/2026B08029134-S1Open ↗
08/15/2026B08029134-I1Open ↗
Showing 3 of 5 on file for this type