← Back
BuildNYC
Two family frame
1036 EAST 42ND STREET
BROOKLYN · Flatlands · BIN 3215107
💬 Discuss this project
1925Year Built
2Stories
B2Building Class
R4Zoning
—Gross Floor Area
2Units
5 Active Violations ▸FDNY Report ↗
Two family frame · 0.75 FAR built · Flood zone X
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dennison ElectricElectrical103/22/2026
Voltaic SolaireGeneral Contractor103/21/2026
Building Lifecycle
12/20/2022
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
12/19/2022
§ 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2NDFLR, 2nd STORY, 1st APARTMENT FROM…
HPD violation · closed
12/19/2022
§ 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN AT THE BATHTUB IN THE BATHROOM LOCATED AT APT 2NDFLR, 2nd STORY, 1st…
HPD violation · open
12/19/2022
§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES .. IN THE BATHROOM LOCATED AT APT 2NDFLR, 2nd STORY,…
HPD violation · open
12/19/2022
§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE THE CERAMIC TILE WALL AT EAST IN THE BATHROOM LOCATED AT APT…
HPD violation · open
6 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDVoltaic Solaire03/16/2016
1 project · most recent 01/08/2026
General Wiring
FiledStatusContractorScope
01/08/2026CompleteDennison ElectricGeneral Wiring
Nothing on file for this building.
21 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account