1036 VAN NEST AVENUE
BRONX · Morris Park · BIN 2044646
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R4AZoning
1,152 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · 2,500 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Cellar2p · 2 filings · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A&B WORLD CONSULTING207/06/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YBL NY403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M. INT'L ENGINEERING PLLCGeneral Contractor107/08/2026
CROSSFIELD PLBG.&HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A&B WORLD CONSULTING, INC5704207/06/2021
Building Lifecycle
All (19)Filed (2)Permit Issued (2)Signed Off (2)Violation (5)Inspection (6)Special Inspection (2)
11/02/2021
Signed off — Alteration
JOB FILED FOR EXIST. 1 FAMILY VIOLATION CORRECTION INCLUDING REMOVE MINOR NON-BEARING PARTITION AND BATHROOM AS PER PLAN TO RESOLVE ECB VIOLATION#39043066X AND #39043065Y. PLUMBING WORK FILED IN DIFFERENT JOB. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER
X00549181-I1
10/29/2021
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/25/2021
Signed off — Alteration
JOB FILED FOR EXIST. 1 FAMILY VIOLATION CORRECTION INCLUDING REMOVE SHOWER AND LEGALIZE TWO PIECE BATHROOM, WASPER AND DRYER, SINK AS PER PLAN TO RESOLVE ECB VIOLATION#39043066X AND #39043065Y. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDE
X00549299-I1
10/07/2021
Violation issued (ECB, closed)
Construction
09/28/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/22/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/22/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/22/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/20/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/15/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/01/2021
Permit issued — Plumbing
X00549299-I1-PL
08/31/2021
Permit issued — General Construction
X00549181-I1-GC
08/19/2021
Violation issued (ECB, closed)
Construction
07/06/2021
Filed — Alteration
JOB FILED FOR EXIST. 1 FAMILY VIOLATION CORRECTION INCLUDING REMOVE MINOR NON-BEARING PARTITION AND BATHROOM AS PER PLAN TO RESOLVE ECB VIOLATION#39043066X AND #39043065Y. PLUMBING WORK FILED IN DIFFERENT JOB. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER
X00549181-I1
07/06/2021
Filed — Alteration
JOB FILED FOR EXIST. 1 FAMILY VIOLATION CORRECTION INCLUDING REMOVE SHOWER AND LEGALIZE TWO PIECE BATHROOM, WASPER AND DRYER, SINK AS PER PLAN TO RESOLVE ECB VIOLATION#39043066X AND #39043065Y. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDE
X00549299-I1
07/06/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Bomstein
07/06/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Bomstein
06/18/2021
Violation issued (ECB, closed)
Construction
06/18/2021
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG09/01/2021
DOB NOWGeneral ConstructionSigned-offM. INT'L ENGINEERING PLLC08/31/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/29/2021Pass-Final General Construction Non-Directive 14PassView ↗
09/28/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/22/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/22/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/22/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/20/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
07/06/2021Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
07/06/2021Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026X00549299-I1Request digital key ↗
08/25/2026X00549181-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026X00549299-I1Open ↗
08/25/2026X00549181-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026X00549181-I1Open ↗
08/23/2026X00549299-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026X00549299-I1Open ↗
08/25/2026X00549181-I1Open ↗